Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17334B03330 November 1986Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28.
ML17334B07231 March 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Cook Units 1 & 2 & Haddam Neck.
ML17341B64917 February 1982Draft Technical Evaluation of SEP Topic VII-1.A,Isolation of Reactor Protection Sys from Nonsafety Sys.
ML17347A59331 July 1987Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept
ML18040B18931 August 1987Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs.
ML18052B19330 June 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Calvert Cliffs-1 & -2, Millstone-2 & Palisades, Final Informal Rept
ML18141A30531 December 1983Definition of Operable,Kewaunee Nuclear Power Plant.
ML18150A11930 April 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2, Final Informal Rept
ML18150A18830 April 1987Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, North Anna Units 1 & 2 & Surry Units 1 & 2, Informal Rept
ML18152A58330 April 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2.
ML19225C45327 April 1979Fire Protection in Operating Nuclear Power Stations:Point Beach Units 1 & 2 SER Review, Interim ReptFire Protection Program
ML19323H48130 September 1979Technical Evaluation of Electrical Instrumentation & Control Design Aspects of Override Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Point Beach Nuclear Power Station,Units 1 & 2.
ML19332B61431 October 1989Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components:Quad Cities 1 & 2, Final Technical Evaluation ReptSafe Shutdown
ML19341B08631 December 1980Instrument Bus Mods,Point Beach Nuclear Plant,Units 1 & 2.
ML20009B59631 May 1981Technical Evaluation of Licensee Responses to IE Bulletin 80-06,re Engineered Safety Feature Reset Controls for Point Beach Nuclear Power Station,Units 1 & 2
ML20023A4862 September 1982Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation ReptHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
ML20023A48910 September 1982Inservice Insp Program, Technical Evaluation Rept
ML20023E17831 May 1983Copper in the Intake and Discharge Zones of the Surry and Salem Nuclear Power Stations
ML20027D21331 July 1982Tech Spec for Redundant DHR Capability,Point Beach,Units 1 & 2.
ML20028A73417 August 1982Improvements in Training & Requalification Programs as Required by TMI Action Items 1.A.2.1 & II.B.4 for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation ReptFuel cladding
Power change
ML20041C27731 January 1982Snupps Auxiliary Feedwater System Reliability Study Evaluation
ML20042D0537 June 1988Technical Evaluation Rept of Dcrdr for Point Beach Nuclear Power Plant,Units 1 & 2.
ML20052C93728 February 1982Tech Specs for Redundant Decay Heat Removal Capability, Point Beach,Units 1 & 2, Preliminary Technical Evaluation Rept
ML20054F51031 May 1982Response of the Zion & Indian Point Containment Buildings to Severe Accident Pressures
ML20054F72521 May 1982Quality Group Classification of Components & Sys, Draft Safety Evaluation
ML20062G65431 July 1982Socioeconomic Impacts of Nuclear Generating Stations:Nine Mile Plant and Fitzpatrick Case Study.Docket Nos. 50-220, 50-410 & 50-333.(Niagara Mohawk Power Corporation and Power Authority of the State of New York)Earthquake
ML20064K07830 June 1980Impure Water in Steam Generators & Isolation Generators, Informal Rept for Limited Distribution
ML20064N73731 August 1982Reliability Analysis of Containment Strength.Sequoyah and McGuire Ice Condenser ContainmentsFinite Element Analysis
Earthquake
ML20065C35831 July 1982Control of Heavy Loads at Nuclear Power Plants,Byron Units 1 & 2 & Braidwood Units 1 & 2, Draft Technical Evaluation ReptSafe Shutdown
Overtravel
Control of Heavy Loads
ML20065D29030 September 1982Evaluation of the Prompt Alerting Systems at Four Nuclear Power StationsSiren
ML20070Q6808 October 1982Evaluation of Procedures Proposed by Detroit Edison Co in Emergency Plans to Consider Meteorological Conditions in Enrico Fermi Site Coastal Environ
ML20070Q6888 October 1982Evaluation of Procedures Proposed by PG&E in Emergency Plans to Consider Meteorological Conditions in Diablo Canyon Plant Coastal Environ
ML20072K82017 June 1983Control of Heavy Loads (C-10),Point Beach Nuclear Plants Units 1 & 2, Draft Final Technical Evaluation ReptSafe Shutdown
Coatings
Nondestructive Examination
Control of Heavy Loads
ML20072L68130 June 1982Assessment of Postulated Degraded Core Accidents in Grand Gulf Reactor Plant, Draft Informal Rept
ML20072L68931 August 1982Analysis of Full Core Meltdown Accidents in Grand Gulf Reactor Plant, Draft Informal Rept
ML20076B58930 July 1982Inservice Insp Program, Technical Evaluation ReptHydrostatic
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML20076C37810 December 1982ECCS Repts (F 47),TMI Action Plan Requirements,Point Beach Nuclear Plant Units 1 & 2, Technical Evaluation ReptBoric Acid
ML20077K6709 February 1983Adequacy of Electric Distribution Sys Voltages for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation Rept
ML20078E0474 October 1994TER on Front End IPE Submittal, Task 22,dtd 941004Boric Acid
Mission time
Internal Flooding
Probabilistic Risk Assessment
ML20078E12230 September 1994IPE Back-End TER Dtd Sept 1994Mission time
Internal Flooding
Severe Accident Management Guideline
ML20078E15031 August 1994TER of IPE Submittal Human Reliability Analysis, Final Rept, Task 23.Draft Dtd 940131,final Aug 1994Internal Flooding
Probabilistic Risk Assessment
ML20079G67428 September 1982Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),Point Beach Nuclear Plant,Unit 1, Technical Evaluation Rept
ML20079G68328 September 1982Nonproprietary Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60),Point Beach Nuclear Plant Unit 2, Final Technical Evaluation Rept
ML20079Q68023 February 1983Selected Operating Reactor Issues Program II RCS Sys Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept
ML20080E07113 January 1984Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation ReptBackfit
ML20080J30917 April 1981Metallurgical,Stress & Fracture Mechanics Analyses of Cracked Steam Generator Manway Studs from Oconee Unit 3 of Duke Power Co
ML20080J32117 April 1981Attachment 1 to Stress Analysis of Failed Steam Generator Manway Studs from Oconee Unit 3,Duke Power Co
ML20083D08530 November 1983Review of the Byron/Braidwood Units 1 and 2 Auxiliary Feedwater System Reliability Analysis
ML20083Q7114 March 1983Preliminary Investigation of Interconnected Sys Interactions for Safety Injection Sys of Indian Point 3Boric Acid
Fuel cladding
ML20084B61222 June 1972Rept of Preliminary Investigation Failure of Hanger Bolts on Suppression Chamber Suction Header at Quad Cities Nuclear Station,Unit 2