ECCS Repts (F 47),TMI Action Plan Requirements,Point Beach Nuclear Plant Units 1 & 2, Technical Evaluation ReptML20076C378 |
Person / Time |
---|
Site: |
Point Beach |
---|
Issue date: |
12/10/1982 |
---|
From: |
Ludington B, Overbeck G, Vosbury F FRANKLIN INSTITUTE |
---|
To: |
Chow F NRC |
---|
Shared Package |
---|
ML20076C381 |
List: |
---|
References |
---|
CON-NRC-03-81-130, CON-NRC-3-81-130, RTR-NUREG-0737, RTR-NUREG-737 TER-C5506-288-2, TER-C5506-288-289, NUDOCS 8212160393 |
Download: ML20076C378 (15) |
|
|
---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20212D6781999-03-31031 March 1999 Supplemental Technical Evaluation Report Based on Review of Additional Responses Concerning Individual Plant Examination of External Events at Point Beach Nuclear Plant,Units 1 & 2. Final Rept ML20212D6411998-03-31031 March 1998 Technical Evaluation Report on Submittal Only Review of Individual Plant Examination of External Events at Point Beach Nuclear Plant,Units 1 & 2. Final Rept ML20078E0471994-10-0404 October 1994 TER on Front End IPE Submittal, Task 22,dtd 941004 ML20078E1221994-09-30030 September 1994 IPE Back-End TER Dtd Sept 1994 ML20141D3271994-08-31031 August 1994 Dispersion Estimates in Vicinity of Buildings ML20078E1501994-08-31031 August 1994 TER of IPE Submittal Human Reliability Analysis, Final Rept, Task 23.Draft Dtd 940131,final Aug 1994 ML20097A8281992-04-0606 April 1992 Technical Evaluation Rept Pump & Valve Inservice Testing Program Point Beach Nuclear Power Plant,Units 1 & 2 Wepc, Per 10CFR50.55a(g) ML20245E9371988-12-31031 December 1988 Rev 1 to EGG-NTA-8030, TMI Action--NUREG-0737 (II.D.1) Point Beach,Units 1 & 2, Technical Evaluation Rept ML20155G7521988-06-14014 June 1988 Review of Point Beach Nuclear Plant,Unit 1 & 2,Alternate Shutdown Capability ML20042D0531988-06-0707 June 1988 Technical Evaluation Rept of Dcrdr for Point Beach Nuclear Power Plant,Units 1 & 2. ML20154H5841988-05-12012 May 1988 App D,Evaluation of Offsite Dose Calculation Manual Rev 1 (Point Beach Nuclear Power Plant,Units 1 & 2) ML20235Y6591987-10-16016 October 1987 Technical Evaluation Rept for Wisconsin Electric Power Co Point Beach Nuclear Plant,Units 1 & 2 SPDS Sar ML20153D7671987-05-11011 May 1987 Evaluation of Fire Protection Exemption Requests from 10CFR50.48 & App R to 10CFR50, Technical Evaluation Rept ML20210A0131986-12-31031 December 1986 BWR Environ Radioactivity Survey for 1986 ML20210A0051986-12-31031 December 1986 Environ Radioactivity Survey for 1986 ML20206S7491986-05-31031 May 1986 Evaluation of Structural Aspects Re Point Beach Plant ML20198S9731986-04-30030 April 1986 Conformance to Reg Guide 1.97,Point Beach Nuclear Plant, Units 1 & 2 ML20133Q0961985-10-22022 October 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2...for Point Beach Nuclear Plant, Units 1 & 2, Technical Evaluation Rept ML20127E7551985-02-28028 February 1985 Shutdown DHR Analysis,Point Beach Case Study, Draft Rept ML20108E0071984-12-31031 December 1984 Conformance to Reg Guide 1.97,Point Beach Nuclear Plant, Units 1 & 2 ML20108F3501984-11-0707 November 1984 Evaluation of Detailed Control Room Design Review Program Plan ML20086T8821984-03-0202 March 1984 Control of Heavy Loads (C-10) Wisconsin Electric Power Co Point Beach Nuclear Plant Units 1 & 2 ML20072K8201983-06-17017 June 1983 Control of Heavy Loads (C-10),Point Beach Nuclear Plants Units 1 & 2, Draft Final Technical Evaluation Rept ML20079Q6801983-02-23023 February 1983 Selected Operating Reactor Issues Program II RCS Sys Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20077K6701983-02-0909 February 1983 Adequacy of Electric Distribution Sys Voltages for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20076C3781982-12-10010 December 1982 ECCS Repts (F 47),TMI Action Plan Requirements,Point Beach Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G6741982-09-28028 September 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),Point Beach Nuclear Plant,Unit 1, Technical Evaluation Rept ML20079G6831982-09-28028 September 1982 Nonproprietary Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60),Point Beach Nuclear Plant Unit 2, Final Technical Evaluation Rept ML20028A7341982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items 1.A.2.1 & II.B.4 for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20027D2131982-07-31031 July 1982 Tech Spec for Redundant DHR Capability,Point Beach,Units 1 & 2. ML20052C9371982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Point Beach,Units 1 & 2, Preliminary Technical Evaluation Rept ML20009B5961981-05-31031 May 1981 Technical Evaluation of Licensee Responses to IE Bulletin 80-06,re Engineered Safety Feature Reset Controls for Point Beach Nuclear Power Station,Units 1 & 2 ML19341B0861980-12-31031 December 1980 Instrument Bus Mods,Point Beach Nuclear Plant,Units 1 & 2. ML19323H4811979-09-30030 September 1979 Technical Evaluation of Electrical Instrumentation & Control Design Aspects of Override Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Point Beach Nuclear Power Station,Units 1 & 2. ML19225C4531979-04-27027 April 1979 Fire Protection in Operating Nuclear Power Stations:Point Beach Units 1 & 2 SER Review, Interim Rept 1999-03-31
[Table view] Category:QUICK LOOK
MONTHYEARML20212D6781999-03-31031 March 1999 Supplemental Technical Evaluation Report Based on Review of Additional Responses Concerning Individual Plant Examination of External Events at Point Beach Nuclear Plant,Units 1 & 2. Final Rept ML20212D6411998-03-31031 March 1998 Technical Evaluation Report on Submittal Only Review of Individual Plant Examination of External Events at Point Beach Nuclear Plant,Units 1 & 2. Final Rept ML20078E0471994-10-0404 October 1994 TER on Front End IPE Submittal, Task 22,dtd 941004 ML20078E1221994-09-30030 September 1994 IPE Back-End TER Dtd Sept 1994 ML20141D3271994-08-31031 August 1994 Dispersion Estimates in Vicinity of Buildings ML20078E1501994-08-31031 August 1994 TER of IPE Submittal Human Reliability Analysis, Final Rept, Task 23.Draft Dtd 940131,final Aug 1994 ML20097A8281992-04-0606 April 1992 Technical Evaluation Rept Pump & Valve Inservice Testing Program Point Beach Nuclear Power Plant,Units 1 & 2 Wepc, Per 10CFR50.55a(g) ML20245E9371988-12-31031 December 1988 Rev 1 to EGG-NTA-8030, TMI Action--NUREG-0737 (II.D.1) Point Beach,Units 1 & 2, Technical Evaluation Rept ML20155G7521988-06-14014 June 1988 Review of Point Beach Nuclear Plant,Unit 1 & 2,Alternate Shutdown Capability ML20042D0531988-06-0707 June 1988 Technical Evaluation Rept of Dcrdr for Point Beach Nuclear Power Plant,Units 1 & 2. ML20154H5841988-05-12012 May 1988 App D,Evaluation of Offsite Dose Calculation Manual Rev 1 (Point Beach Nuclear Power Plant,Units 1 & 2) ML20235Y6591987-10-16016 October 1987 Technical Evaluation Rept for Wisconsin Electric Power Co Point Beach Nuclear Plant,Units 1 & 2 SPDS Sar ML20153D7671987-05-11011 May 1987 Evaluation of Fire Protection Exemption Requests from 10CFR50.48 & App R to 10CFR50, Technical Evaluation Rept ML20210A0131986-12-31031 December 1986 BWR Environ Radioactivity Survey for 1986 ML20210A0051986-12-31031 December 1986 Environ Radioactivity Survey for 1986 ML20206S7491986-05-31031 May 1986 Evaluation of Structural Aspects Re Point Beach Plant ML20198S9731986-04-30030 April 1986 Conformance to Reg Guide 1.97,Point Beach Nuclear Plant, Units 1 & 2 ML20133Q0961985-10-22022 October 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2...for Point Beach Nuclear Plant, Units 1 & 2, Technical Evaluation Rept ML20127E7551985-02-28028 February 1985 Shutdown DHR Analysis,Point Beach Case Study, Draft Rept ML20108E0071984-12-31031 December 1984 Conformance to Reg Guide 1.97,Point Beach Nuclear Plant, Units 1 & 2 ML20108F3501984-11-0707 November 1984 Evaluation of Detailed Control Room Design Review Program Plan ML20086T8821984-03-0202 March 1984 Control of Heavy Loads (C-10) Wisconsin Electric Power Co Point Beach Nuclear Plant Units 1 & 2 ML20072K8201983-06-17017 June 1983 Control of Heavy Loads (C-10),Point Beach Nuclear Plants Units 1 & 2, Draft Final Technical Evaluation Rept ML20079Q6801983-02-23023 February 1983 Selected Operating Reactor Issues Program II RCS Sys Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20077K6701983-02-0909 February 1983 Adequacy of Electric Distribution Sys Voltages for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20076C3781982-12-10010 December 1982 ECCS Repts (F 47),TMI Action Plan Requirements,Point Beach Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G6741982-09-28028 September 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),Point Beach Nuclear Plant,Unit 1, Technical Evaluation Rept ML20079G6831982-09-28028 September 1982 Nonproprietary Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60),Point Beach Nuclear Plant Unit 2, Final Technical Evaluation Rept ML20028A7341982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items 1.A.2.1 & II.B.4 for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20027D2131982-07-31031 July 1982 Tech Spec for Redundant DHR Capability,Point Beach,Units 1 & 2. ML20052C9371982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Point Beach,Units 1 & 2, Preliminary Technical Evaluation Rept ML20009B5961981-05-31031 May 1981 Technical Evaluation of Licensee Responses to IE Bulletin 80-06,re Engineered Safety Feature Reset Controls for Point Beach Nuclear Power Station,Units 1 & 2 ML19341B0861980-12-31031 December 1980 Instrument Bus Mods,Point Beach Nuclear Plant,Units 1 & 2. ML19323H4811979-09-30030 September 1979 Technical Evaluation of Electrical Instrumentation & Control Design Aspects of Override Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Point Beach Nuclear Power Station,Units 1 & 2. ML19225C4531979-04-27027 April 1979 Fire Protection in Operating Nuclear Power Stations:Point Beach Units 1 & 2 SER Review, Interim Rept 1999-03-31
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20212D6781999-03-31031 March 1999 Supplemental Technical Evaluation Report Based on Review of Additional Responses Concerning Individual Plant Examination of External Events at Point Beach Nuclear Plant,Units 1 & 2. Final Rept ML20212D6411998-03-31031 March 1998 Technical Evaluation Report on Submittal Only Review of Individual Plant Examination of External Events at Point Beach Nuclear Plant,Units 1 & 2. Final Rept ML20078E0471994-10-0404 October 1994 TER on Front End IPE Submittal, Task 22,dtd 941004 ML20078E1221994-09-30030 September 1994 IPE Back-End TER Dtd Sept 1994 ML20141D3271994-08-31031 August 1994 Dispersion Estimates in Vicinity of Buildings ML20078E1501994-08-31031 August 1994 TER of IPE Submittal Human Reliability Analysis, Final Rept, Task 23.Draft Dtd 940131,final Aug 1994 ML20097A8281992-04-0606 April 1992 Technical Evaluation Rept Pump & Valve Inservice Testing Program Point Beach Nuclear Power Plant,Units 1 & 2 Wepc, Per 10CFR50.55a(g) ML20245E9371988-12-31031 December 1988 Rev 1 to EGG-NTA-8030, TMI Action--NUREG-0737 (II.D.1) Point Beach,Units 1 & 2, Technical Evaluation Rept ML20155G7521988-06-14014 June 1988 Review of Point Beach Nuclear Plant,Unit 1 & 2,Alternate Shutdown Capability ML20042D0531988-06-0707 June 1988 Technical Evaluation Rept of Dcrdr for Point Beach Nuclear Power Plant,Units 1 & 2. ML20154H5841988-05-12012 May 1988 App D,Evaluation of Offsite Dose Calculation Manual Rev 1 (Point Beach Nuclear Power Plant,Units 1 & 2) ML20235Y6591987-10-16016 October 1987 Technical Evaluation Rept for Wisconsin Electric Power Co Point Beach Nuclear Plant,Units 1 & 2 SPDS Sar ML20153D7671987-05-11011 May 1987 Evaluation of Fire Protection Exemption Requests from 10CFR50.48 & App R to 10CFR50, Technical Evaluation Rept ML20210A0131986-12-31031 December 1986 BWR Environ Radioactivity Survey for 1986 ML20210A0051986-12-31031 December 1986 Environ Radioactivity Survey for 1986 ML20206S7491986-05-31031 May 1986 Evaluation of Structural Aspects Re Point Beach Plant ML20198S9731986-04-30030 April 1986 Conformance to Reg Guide 1.97,Point Beach Nuclear Plant, Units 1 & 2 ML20133Q0961985-10-22022 October 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2...for Point Beach Nuclear Plant, Units 1 & 2, Technical Evaluation Rept ML20127E7551985-02-28028 February 1985 Shutdown DHR Analysis,Point Beach Case Study, Draft Rept ML20108E0071984-12-31031 December 1984 Conformance to Reg Guide 1.97,Point Beach Nuclear Plant, Units 1 & 2 ML20108F3501984-11-0707 November 1984 Evaluation of Detailed Control Room Design Review Program Plan ML20086T8821984-03-0202 March 1984 Control of Heavy Loads (C-10) Wisconsin Electric Power Co Point Beach Nuclear Plant Units 1 & 2 ML20072K8201983-06-17017 June 1983 Control of Heavy Loads (C-10),Point Beach Nuclear Plants Units 1 & 2, Draft Final Technical Evaluation Rept ML20079Q6801983-02-23023 February 1983 Selected Operating Reactor Issues Program II RCS Sys Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20077K6701983-02-0909 February 1983 Adequacy of Electric Distribution Sys Voltages for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20076C3781982-12-10010 December 1982 ECCS Repts (F 47),TMI Action Plan Requirements,Point Beach Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G6741982-09-28028 September 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),Point Beach Nuclear Plant,Unit 1, Technical Evaluation Rept ML20079G6831982-09-28028 September 1982 Nonproprietary Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60),Point Beach Nuclear Plant Unit 2, Final Technical Evaluation Rept ML20028A7341982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items 1.A.2.1 & II.B.4 for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20027D2131982-07-31031 July 1982 Tech Spec for Redundant DHR Capability,Point Beach,Units 1 & 2. ML20052C9371982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Point Beach,Units 1 & 2, Preliminary Technical Evaluation Rept ML20009B5961981-05-31031 May 1981 Technical Evaluation of Licensee Responses to IE Bulletin 80-06,re Engineered Safety Feature Reset Controls for Point Beach Nuclear Power Station,Units 1 & 2 ML19341B0861980-12-31031 December 1980 Instrument Bus Mods,Point Beach Nuclear Plant,Units 1 & 2. ML19323H4811979-09-30030 September 1979 Technical Evaluation of Electrical Instrumentation & Control Design Aspects of Override Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Point Beach Nuclear Power Station,Units 1 & 2. ML19225C4531979-04-27027 April 1979 Fire Protection in Operating Nuclear Power Stations:Point Beach Units 1 & 2 SER Review, Interim Rept 1999-03-31
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20212D6781999-03-31031 March 1999 Supplemental Technical Evaluation Report Based on Review of Additional Responses Concerning Individual Plant Examination of External Events at Point Beach Nuclear Plant,Units 1 & 2. Final Rept ML20212D6411998-03-31031 March 1998 Technical Evaluation Report on Submittal Only Review of Individual Plant Examination of External Events at Point Beach Nuclear Plant,Units 1 & 2. Final Rept ML20078E0471994-10-0404 October 1994 TER on Front End IPE Submittal, Task 22,dtd 941004 ML20078E1221994-09-30030 September 1994 IPE Back-End TER Dtd Sept 1994 ML20078E1501994-08-31031 August 1994 TER of IPE Submittal Human Reliability Analysis, Final Rept, Task 23.Draft Dtd 940131,final Aug 1994 ML20141D3271994-08-31031 August 1994 Dispersion Estimates in Vicinity of Buildings ML20097A8281992-04-0606 April 1992 Technical Evaluation Rept Pump & Valve Inservice Testing Program Point Beach Nuclear Power Plant,Units 1 & 2 Wepc, Per 10CFR50.55a(g) ML20245E9371988-12-31031 December 1988 Rev 1 to EGG-NTA-8030, TMI Action--NUREG-0737 (II.D.1) Point Beach,Units 1 & 2, Technical Evaluation Rept ML20155G7521988-06-14014 June 1988 Review of Point Beach Nuclear Plant,Unit 1 & 2,Alternate Shutdown Capability ML20042D0531988-06-0707 June 1988 Technical Evaluation Rept of Dcrdr for Point Beach Nuclear Power Plant,Units 1 & 2. ML20154H5841988-05-12012 May 1988 App D,Evaluation of Offsite Dose Calculation Manual Rev 1 (Point Beach Nuclear Power Plant,Units 1 & 2) ML20150D9001988-03-17017 March 1988 Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Telephone Co ML20150D9091988-03-17017 March 1988 Mod 1,deobligating Funds from Total Obligated Amount of Contract & to Correct FIN Number,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites ML20149F1311988-01-11011 January 1988 Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee & Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co ML20149F1691988-01-11011 January 1988 Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co ML20235Y6591987-10-16016 October 1987 Technical Evaluation Rept for Wisconsin Electric Power Co Point Beach Nuclear Plant,Units 1 & 2 SPDS Sar ML20153D7671987-05-11011 May 1987 Evaluation of Fire Protection Exemption Requests from 10CFR50.48 & App R to 10CFR50, Technical Evaluation Rept ML20210A0131986-12-31031 December 1986 BWR Environ Radioactivity Survey for 1986 ML20210A0051986-12-31031 December 1986 Environ Radioactivity Survey for 1986 ML20206S7491986-05-31031 May 1986 Evaluation of Structural Aspects Re Point Beach Plant ML20198S9731986-04-30030 April 1986 Conformance to Reg Guide 1.97,Point Beach Nuclear Plant, Units 1 & 2 ML20133Q0961985-10-22022 October 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2...for Point Beach Nuclear Plant, Units 1 & 2, Technical Evaluation Rept ML20127E7551985-02-28028 February 1985 Shutdown DHR Analysis,Point Beach Case Study, Draft Rept ML20108E0071984-12-31031 December 1984 Conformance to Reg Guide 1.97,Point Beach Nuclear Plant, Units 1 & 2 ML20108F3501984-11-0707 November 1984 Evaluation of Detailed Control Room Design Review Program Plan ML20086T8821984-03-0202 March 1984 Control of Heavy Loads (C-10) Wisconsin Electric Power Co Point Beach Nuclear Plant Units 1 & 2 ML20072K8201983-06-17017 June 1983 Control of Heavy Loads (C-10),Point Beach Nuclear Plants Units 1 & 2, Draft Final Technical Evaluation Rept ML20079Q6801983-02-23023 February 1983 Selected Operating Reactor Issues Program II RCS Sys Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20077K6701983-02-0909 February 1983 Adequacy of Electric Distribution Sys Voltages for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20076C3781982-12-10010 December 1982 ECCS Repts (F 47),TMI Action Plan Requirements,Point Beach Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20079G6741982-09-28028 September 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts (F-11 & B-60),Point Beach Nuclear Plant,Unit 1, Technical Evaluation Rept ML20079G6831982-09-28028 September 1982 Nonproprietary Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60),Point Beach Nuclear Plant Unit 2, Final Technical Evaluation Rept ML20028A7341982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items 1.A.2.1 & II.B.4 for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20027D2131982-07-31031 July 1982 Tech Spec for Redundant DHR Capability,Point Beach,Units 1 & 2. ML20052C9371982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, Point Beach,Units 1 & 2, Preliminary Technical Evaluation Rept ML20009B5961981-05-31031 May 1981 Technical Evaluation of Licensee Responses to IE Bulletin 80-06,re Engineered Safety Feature Reset Controls for Point Beach Nuclear Power Station,Units 1 & 2 ML19341B0861980-12-31031 December 1980 Instrument Bus Mods,Point Beach Nuclear Plant,Units 1 & 2. ML19323H4811979-09-30030 September 1979 Technical Evaluation of Electrical Instrumentation & Control Design Aspects of Override Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Point Beach Nuclear Power Station,Units 1 & 2. ML19225C4531979-04-27027 April 1979 Fire Protection in Operating Nuclear Power Stations:Point Beach Units 1 & 2 SER Review, Interim Rept 1999-03-31
[Table view] |
Text
-
TER-C5506-288/289 CONTENTS Section Title Page 1 INTRODUCTION . . . . . . . . . . . . . 1
~
1.1 Purpose of Review . . . . . . . . . . . 1 1.2 Generic Background. . . . . . . . . . . 1 1.3 Plant-Specific Background . . . . . . . . . 2 2 REVIEN CRITERIA. . . . . . . . . . . . . 3 .
3 TECHNICAL EVALUATION . . . . . . . . . . . 4 3.1 Review of Completeness of the Licensee's Report . . . 4 3.2 Comparison of ECC System Outages with Those of Other Plants. . . . . . . . . 4 3.3 Review of Proposed Changes to Improve the Availability of ECC Equipment . . . . . . . . 9 4 CONCLUSIONS. . . . . . . . . . . . . . 10 5 REFERENCES . . . . . . . . . . . . . 11 XA Copy Has Been Sent ti PDR 7;i91(,0393 XPr l' i
/
wv~
000 er n A Chemen of The Fransen we
TER-C5506-288/289 l
FORzwoRo l
This Technical Evaluation Report was prepared by Franklin Research Center under a contract with the U.S. Nuclear Regulatory Commission (Office of Nuclear Reactor Regulation, Division of Operating Reactors) for technical assistance in support of NRC operating reactor licensing actions. The technical evaluation was conducted in accordance with criteria established by the NRC.
Mr. G. J. Overbeck, Mr. F. W. Vosbury, and Mr. B. W. Ludington contributed to the technical preparation of this report through a subcontract with WESTEC Services, Inc.
V nklin Research Center A Dnamon of The Fransen Inseeute
TER-C5506-288/289
- 1. INTRODUCTION 1.1 PURPOSE OF REVIEW This technical evaluation report (TER) documents an independent review of the outages of the emergency core cooling (ECC) systems at Wisconsin Electric Power Company's (WEPC) Point Beach Nuclear Plant Units 1 and 2. The purpose of this evaluation is to determine if the Licensee has submitted a report that is complete and satisfies the requirements of TMI Action Item II.K.3.17,
" Report on Outages of Emergency Core-Cooling Systems Licensee Report and Proposed Technical Specification Changes."
1.2 GENERIC BACKGROUND Following the Three Mile Island Unit 2 accident, the Bulletins and Orders Task Force reviewed nuclear steam supply system (NSSS) vendors' small break loss-of-coolant accident (IOCA) analyses to ensure that an adequate basis existed for developing guidelines for small break LOCA emergency procedures.
During these reviews, a concern developed about the assumption of the worst single failure. Typically, the small break LOCA analysis for boiling water teactors (BWRs) assumed a loss of the high pressure coolant injection (HPCI) ,
system as the worst single failure. However, the technical specifications permitted plant operation for substantial periods with the HPCI system out of service with no limit on the accumulated outage time. There is concern not only about the HPCI system, but also about all ECC systems where substantial outages might occur within the limits of the present technical specification.
Therefore, ensure that the small break LOCA analyses are consistent with the actual plant response, the Bulletin and Orders Task Force recommended in NUREG-0626 (1] , " Generic Evaluation of Feedwater Transients and Small Break Ioss-of-Coolant Accidents in GE-Designed Operating Plants and Near-Term Operating License Applications," that licensees of General Electric (GE)-designed NSSSs do the following:
" Submit a report detailing outage dates and lengths of the outages for all ECC systems. The report should also include the cause of the outage (e.g. , controller failure or spurious isolation) . The outage data for nklin Research Center A OMmon of The Franken insatute
i TER-C5506-288/289 ECC components should include all outages for the last five years of operation. The end result should be the quantification of historical unreliability due to test and maintenance outages. This will establish
.if a need exists for cumulative outage requirements in technical ,
specifications."
Later the recommendation was incorporated into NUREG-0660 (2], "NRC Action Plan Developed as a Result of the TMI-2 Accident," for GE-designed NSSSs as TMI Action Item II.K.3.17. In NUREG-0737 [3], " Clarification of 'LMI Action Plan Requirements," the NRC staff expanded the Action Item to include all light water reactor plants and added a requirement that licensees propose changes that will improve and control availability of ECC systems and components. In addition, the contents of the reports to be submitted by the licensees were further clarified as follows:
"The report should contain (1) outage dates and duration of outages; (2) cause of the outage; (3) ECC systems or components involved in the outage; and (4) corrective action taken."
1.3 PLANT-SPECIFIC BACKGROUND On March 31, 1981 [4], WEPC submitted a report in response to NUREG-0737, Item II.K.3.17, " Report on Outage's'of Emergency Core-Cooling Systems Licensee Report and Proposed Technical Specification Changes." The report submitted by WEPC covered the period from January 1,1976 to December 31, 1980 for Point Beach Units 1 and 2. WEPC did not provide any recommendations to improve and control availability of ECC systems.
nkun Research Center A Dmman af The Frenidn inesame
. , . _ . . --. -. _ _ _ _ - - - ~ . - - - - _ _ _ _ . . _ . ,
TER-C5506-288/289
- 2. REVIEW CRITERIA 4
The Licensee's response to NUREG-0737, Item II.K.3.17, was evaluated
. against criteria provided by the NRC in a letter dated July 21, 1981 [5]
outlining Tentative Work Assignment F. Provided as review criteria in Reference 5, the NRC stated that the Licensee's response should contain the following informations i
- 1. A report detailing outage dates, causes of outages, and lengths of outages for all ECC systems for the last 5 years of operation. This report was to include the ECC systems or components involved and corrective actions taken. Test and maintenance outages were to be j included.
- 2. A quantification of the historical unavailability of the ECC systems and components due to test and maintenance outages.
- 3. Proposed changes to improve the availability of ECC systems, if necessary.
The type of information required to satisfy the review criteria was clarified by the NRC on August 12, 1981 [6). Auxiliary systems such as component cocling water and plant service water systems were not to be
! considered in determining the unavailability of ECC systems. Only the outages of the diesel generators were to be included along with the primary ECC system outages. Finally, the "last five years of operation" was to be loosely interpreted as a continuous 5-year period of recent operation.
On July 26, 1982 [7], the NRC further clarified that the purpose of the review was to identify those licensees that have experienced higher ECC system outages than other licensees with similar NSSSs. The need for improved P reliability of diesel generators is under review by the NRC. A Diesel Generator Interim Reliability Program has been proposed to effect improved performance at operating plants. As a consequence, a comparison of diesel generator outage information within this review is not required.
nklin Research Center A Dewison of The Fransen insomme
, . , _ - - - - - - - . ~ - - . - _ , _ . - - , , , . - - , _ - _ _ _ - . . , , - - - - . _ _ _ . _ , , _ _ - _ , - _ . , . . , _ _ - . , . _ . . , , _ . . - - . _ , , , ,
l TER-C5506-288/289 i l
- 3. TECHNICAL EVALUATION I
3.1 REVIEW OF COMPLETENESS OF THE LICENSEE'S REPORT The ECC systems at WEPC's Point Beach Nuclear Plant Units 1 and 2 consist of the following five separate systems:
o accumulators o safety injection system (SIS) o residual heat removal system (RER) o boric acid storage tanks (BST) o refueling water storage tanks (RWST).
In Reference 4, WEPC also included the containment spray system, auxiliary coolant system, and service water system. The containment spray' system is a containment heat removal system as well as a fission product cleanup system.
The auxiliary coolant system is an intermediate closed-loop cooling system that removes heat from the RER system. The service water system removes heat from the auxiliary cooling system. Because the containment spray system is not an emergency core cooling system, its outages are not considered in this l review. Similarly, the auxiliary coolant and service water systems are t
essential support systems for long-term cooling; however, none of those l
systems is considered a primary EEC system for this review.
2 For each ECC system outage, WEPC provided the date, the duration, a brief description, and the cause, with sufficient details to indicate the corrective action taken. Information on routine preventive scintenance and surveillance testing was also included.
WEPC's review encompassed the per'iod from January 1,1976 to December 31, 1980 for Point Beach Units 1 and 2.
Based on the preceding discussion, it has been established that WEPC has j submitted a report which fulfills the requirements of review criterion 1 without exception.
i 3.2 COWARISON OF ECC SYSTEM OUTAGES WITH THOSE OF OTHER PLANTS The outages of BCC systems can be categorized as (1) unplanned outages due to equipment failure or (2) planned ourages due to surveillance testing or nklin Research Center A Demeen of The Fransen inesswe
- TER-C5506-288/289 preventive maintenance. Unplanned outages are reportable as Licensee Event Reports (LERs) under the technical specifications. Planned outages for periodic maintenance and testing are not reportable as LERs. The technical specifications identify the type and quantity of ECC equipment required as well as the maximum allowable outage times. If an outage exceeds the maximum allowsble time, then the plant operating mode is altered to a lower status consistent with the available ECC system components still operational. '2he
. purpose of the technical specification maximum allowable outage times is to prevent extended plant operation without sufficient ECC system protection.
The maximum allowable outage time, specified per event, tends to limit the unavailability of an ECC system. However, there is no cumulative outage time limitation to prevent repeated planned and unplanned outages from accumulating extensive ECC system downtime. 3 Unavailability, as defined in general terms in NASH-1400 [8], is the probability of a system being in a failed state when required. However, for this review, a detailed unavailability analysis was not required. Instead, a preliminary estimate of the unavailability of an ECC system was made by calculating the ratio of the ECC system downtime to the number of days that the plant was in operation during the last 5 years. To simplify the tabulation of operating time, only the period when the plant was in operational Mode 1 was considered. This simplifying assumption is reasonable given that the period of time that a plant is starting up, shutting down, and cooling down is small compared to the time it is operating at power. In addition, an ECC system was considered down whenever an ECC system component was unavailable due to any cause.
It should be noted that the ratio calculated in this manner is not a true measure of the ECC system unavailability, since outage events are included that appear to compromise system performance when, in fact, partial or full function of the system would be expected. Full function of an ECC system would be expected if the design capability of the system exceeded the capacity required for the system to fulfill its safety function. For example, if an ECC system consisting of two loops with multiple pumps in each loop is designed so that only one pump in each loop is required to satisfy core nklin Research Center A Dhmeen of The Fransen bestume
TER-C550 6-288/289 4 cooling requirements, then an outage of a single pump would not prevent the system from performing its safety function. In addition, the actual ECC system unavailability is a function of planned and unplanned outages of essential support systems as well as planned and unplanned outages of primary BCC system components. In accordance with the clarification discussed in Section 2, only the effects of outages associated with primary ECC system I
components and emergency diepel generators are considered in this review. The inclusion of all outage events assumed to be true ECC system outages tends to overestimate the unavaflability, while the exclusion of support system outages tends to underestimate the unavailability of ECC systems and components. Only a detailed analysis of each BCC system for each plant could improve the confidence in the calculated result. Such an analysis is beyond the intended scope of this report.
The planned and unplanned (forced) outage times for the ECC systems (accumulators, SIS, RHR, BST, and RNST) , were identified from the outage information in Reference 4 and are shown in number of days and as percentage of plant operating time per year in Tables 1 and 2 for Point Beach Units 1 and 2, respectively. Outages that occurred during non-operational periods were
- eliminated as well as those caused by failures or test and maintenance of support systems. Data on plant operating conditions were obtained from the j annual reports, " Nuclear Power Plant Operating Experience" [9-12], and from monthly reports, " Licensed Operating Reactors Status Summary Reports" [13].
The remaining outages were segregated into planned and unplanned outages on the basis of WEPC's description of the cause. The outage periods for each
! category were calculated by summing the individual outage durations.
Observed outage times of various ECCS systems at Point Beach Units 1 and 2 were compared with those of other PWRs. Based on this comparison, it was concluded that the historical unavailability of the accumulators, BST, and RWST for both units has been consistent with the performance of those systems through-
~
out the industry and consistent with existing technical specifications. The observed unavailability was less than the industrial mean for the accumulators,
! RST, and RWST for both units. The SIS and RHR systems, however, require further investigation since their observed unavailability is significantly higher than i
1 nklin Research Center A Dhesson of The Frenen haeste l.._ . __m __ _ . . _ . . . . _ . _ _ . _ - _ . _ _ - . - _ . - _ . _ . . _ . - . , _ , . , , . . _ . . _ . _ , _ . _ _ , , . _ - , . . . _ _ _ . _ , _ _ . . . . _ . -
c-E5E'
>n Eh Table 1. Planned and Unplanned (Forced) Outage Times for Point Beach Unit 1*
$5 e,3
- o Accumulator SIS RHR , BIT RWST Days of Plant Outage in Days Outage in Days Outage in Days Outage in Days Outage in Days Year Operation Forced Planned Forced Planned Forced Planned Forced Planned p
Forced Planned q 3, 1976 301.7 0.0 0.0 0.6 1.4 0.2 0.2 0.0 0.0 0.2 1.2 4 (0.2%) (0.5%) (0.1%) (0.1%) (0.1%) (0.4%)
l 1977 322.3 0.0 0.0 0.0 0.3 0.4 1.5 0.0 0.0 0.2 0.0 (c.14) (0.1%) (0.5%) (0.1%)
i 1978 327.9 0.0 0.0 0.0 6.9 0.0 7.5 0.0 0.0 0.3 0.0 4i (2.1%) (2.3%) (0.1%) -
1979 269.1 0.0 0.0 0.0 5.8 0.2 5.7 0.0 0.0 0.2 0.3 (2.2%) (0.1%) (2.1%) (0.1%) (0.1%)
l 3
1980 288.3 0.0 0.0 0.0 6.1 0.6 4.0 0.0 0.0 0.4 0.0-(2.1%) (0.2%) (2.1%) (0.1%)
, Total 1509.3 0.0 0.0 0.6 20.5 1.4 20.9 0.0 0.0 1.3 1.5 l (<0.14) (1.4%) (0.1%) (1.4%) (0.1%) (0.1%)
! H
=
- Numbers in parentheses indicate system outage time as a percentage of total plant operating time. m j
.b
~
CD t
5
E F
gn"Of
, g Table 2. Planned and Unplanned (Fdrced) Outage Times for Point Beach Unit 2 *
- er 4
,x
% Accumulators SIS ' RER BIT RWST S Days of Plant Outage in Days Outage in Days Outage in Days Outage in Days Outage in Days Q Yggr Operation Fdrced Planned Forced Planned Forced Planned Forced Planned Forced Planned
4 1976 331.8 0.0 0.0 1.0 1.7 0.0 0.2 0.0 0.0 0.0 0.0 (0.3%) (0.5%) (0.1%)
1977 312.5 0.0 0.0 0.0 0*. 3 0.2 0.6 0.0 0.0 0.4 0.0 (0.1%) (0.1%) (0.2%) (0.1%)
a2 -
' 1978 335.0 0.0 0.0 6.5 0.0 0.0 7.1 0.0 0.0 0.0 0.0 (1.9t) (2.14) 1979 322.2 0.0 0.0 0.6 6.7% 0.2 7.5 0.0 0.0 0.0 0.0 (0.2%) (2.1%) (0.14) (2.3%)
1980 318.9 0.0 0.0 1.4 6.1 0.2 7.6 0.0 0.0 0.0 0.0 (0.4%) (1.9%) (0.1%) (2.4%)
Total 1620.4 0.0 0.0 3.0 21.3 0.6 23.0 0.0 0.0 0.4 0.0 (0.2%) (1.3%) (<0.1%) (1.4%) (<0.1%)
u O
t
- Numbers in parentheses indicate system outage time as a percentage of total plant operating time. S$
et
TER-C5506-288 f 89 that observed in other plants and has exceeded the industrial mean by greater than about one standard deviation, assuming that the underlying unavailability 1
i is distributed lognormally.
A detailed review of the SIS and RER system outages was performed in I order to ascertain the contributing factors to the high system unavailability.
For both the SIS and RER systems at both units, the high unavailability was solely due to surveillance testing. The monthly testing of the safety injection system contributes a minimum of 125 hours0.00145 days <br />0.0347 hours <br />2.066799e-4 weeks <br />4.75625e-5 months <br /> (1.4%) annually to system unavailability. The monthly testing of the RHR system also. contributes a minimum of 125 hours0.00145 days <br />0.0347 hours <br />2.066799e-4 weeks <br />4.75625e-5 months <br /> (1.4%) annually to the system unavailability. The monthly tests are required by the plant technical specifications.
3.3 REVIEW OF PROPOSED CHANGES TO IMPROVE THE AVAILABILITY OF ECC EQUIPMENT In Reference 4, WEPC did not propose any changes to improve the availability of ECC systems and components.
c O
nklin Research Center A Cheon of The Fransen kweewee
~
TER-C5506-289/289
- 4. CONCLUSIONS Wisconsin Electric Power Company (WEPC) has submitted a report for Point Beach Nuclear Plant Units 1 and 2 that contains (1) outage dates and durations (2) causes of the outages, (3) ECC systems or components involved in the outages, and (4) corrective actions taken. It is concluded that WEPC has fulfilled the requirements of NUREG-0737, Item II.K.3.17. In addition, the historical unavailability of the accumulators, BST, RWST, SIS and RHR system at both units has been consistent with the performance of those systems throughout the industry and consistent with existing technical specifications.
The observed unavailability was less than the industrial mean for the accumu-lators, BST, and RWST. However, the observed unavailability of the SIS and RHR system was significantly higher than the industrial mean. The high unavailability was directly attributed to surveillance testing required by the plant's technical specifications.
l l
t l nklin Research Center
- A Omason of The Fm h
E {
TER-C5506-288/289
- 5. REFERENCES
- 1. NUREG-0626
" Generic Evaluation of Feedwater Transients and Small Break Loss-of-Coolant Accidents in GE-Designed Operating Plants and Near-Term Operating License Applications" NRC, January 1980
- 2. NUREG-0660 "NRC Action Plan Developed as a Result of the TMI-2 Accident" NRC, March 1980
- 3. NUREG-0737
" Clarification of TMI Action Plan Requirements" NRC, October 1980
- 4. C. W. Fay (WEPC)
Letter to H. R. Denton (Director of Nuclear Reactor Regulation, NRC)
Subject:
Submittal of Information Required by NUREG-0737 WEPC, March 31, 1981 ,
- 5. J. N. Donohew, Jr. (NRC)
Letter to Dr. S. P. Carfagno (FRC).
Subject:
Contract No.
NRC-0 3-81-13 0, Tentative Assignment F NRC, July 21, 1981
- 6. NRC Meeting between NRC and FRC.
Subject:
C5506 Tentative Work Assignment F, Operating Reactor PORV and ECCS Outage Reports August 12, 1981
- 7. NRC
- Meeting between NRC and FRC.
Subject:
Resolution of Review Criteria and Scope of Work July 26, 1982 l
8 WASH-1400
" Reactor Safety Study"
{ NRC, October 1975 l
, 9. NUREG-0366
" Nuclear Power Plant Operating Experience 1976" i NRC, December 1977 l 10. NUREG-0483
" Nuclear Power Plant Operating Experience 1977" NRC, February 1979 l nklin Research Center A Denson of The Franten Inseeute
TER-C5506-288/289
- 11. NUREG-0618
" Nuclear Power Plant Operating Experience 1978" NRC, December 1979
- 12. NUREG/CR-1496
" Nuclear Power Plant Operating Experience 1979" NRC, May 1981
- 13. NUREG-0020
" Licensed Operating Reactors Status Summary Report" Volume 4, Nos.1 through 12, and Volume 5, No.1
. NRC, December 1980 through January 1981 i
\