ML20236U39230 July 1975PN-75-059:licensee Reported That Four Movement Areas in Three Different Locations at Byron Construction Site Have Just Been Discovered.Licensee Requesting Illinois State Geological Survey to Assist in Evaluating Movements
ML20248F0992 June 1978PNO-78-118:on 780601,two Iron Workers at Plant Were Injured, When 2 of 26 Support Struts,Forming Base of Cooling Tower Under Const,Collasped & Workers Fell About 75 Ft.Press Release Re Accident Was Issued on 780601
PNO-III-85-046, on 850604,while Taking Sample from Vol Control Tank,Valve Packing Failed,Resulting in Release of Approx 700 Mci Xenon & Krypton Gas.Workers Evacuated,Gas Removed by Ventilation Sys & Valve Repaired7 June 1985PNO-III-85-046:on 850604,while Taking Sample from Vol Control Tank,Valve Packing Failed,Resulting in Release of Approx 700 Mci Xenon & Krypton Gas.Workers Evacuated,Gas Removed by Ventilation Sys & Valve Repaired
PNO-III-85-061, on 850713,reactor Trip Occurred Along W/Loss of Some Instrumentation.Caused by Lightning Strike Near Facility.Methodology Used to Ground Lightning Reviewed.Sys Being Modified to Preclude Recurrence19 July 1985PNO-III-85-061:on 850713,reactor Trip Occurred Along W/Loss of Some Instrumentation.Caused by Lightning Strike Near Facility.Methodology Used to Ground Lightning Reviewed.Sys Being Modified to Preclude Recurrence
PNO-III-85-072, on 850815,low Level Contamination Discovered in Filter of truck-mounted Demineralizer Resin Tank Used to Flush Piping.Radioactivity Apparently Concentrated by Flushing Resins.Sludge Returned to Plant for Disposal19 August 1985PNO-III-85-072:on 850815,low Level Contamination Discovered in Filter of truck-mounted Demineralizer Resin Tank Used to Flush Piping.Radioactivity Apparently Concentrated by Flushing Resins.Sludge Returned to Plant for DisposalGrab sample
PNO-III-85-073, on 850820,contaminated Resins Used in Condensate Polishing Sys Sent Offsite for Regeneration. Resins Being Returned to Site.No Detectable Radiation Found at Vendor Facility21 August 1985PNO-III-85-073:on 850820,contaminated Resins Used in Condensate Polishing Sys Sent Offsite for Regeneration. Resins Being Returned to Site.No Detectable Radiation Found at Vendor Facility
PNO-III-86-014, on 860212 & 17,emergency Diesel Generator 2A Failed.Caused by Broken Rocker Arms on Left Cylinders 5 & 7, Respectively.Station Will Be Shut Down for 16 Days While Licensee Investigates Problem19 February 1986PNO-III-86-014:on 860212 & 17,emergency Diesel Generator 2A Failed.Caused by Broken Rocker Arms on Left Cylinders 5 & 7, Respectively.Station Will Be Shut Down for 16 Days While Licensee Investigates Problem
PNO-III-86-063, on 860702,unidentified Leakage from RCS Discovered.Caused by Leak in Resistance Temp Detector Manifold for Reactor Cooling Loop D.Reactor Cooled to Cold Shutdown.Detector Being Repaired7 July 1986PNO-III-86-063:on 860702,unidentified Leakage from RCS Discovered.Caused by Leak in Resistance Temp Detector Manifold for Reactor Cooling Loop D.Reactor Cooled to Cold Shutdown.Detector Being Repaired
PNO-III-86-066, on 860708,three Employees Terminated After Drug Test Revealed Traces of Thc.Employees Listed by Alleger in Late June 1986.Action on Three Individuals Suspended on 860703 Pending8 July 1986PNO-III-86-066:on 860708,three Employees Terminated After Drug Test Revealed Traces of Thc.Employees Listed by Alleger in Late June 1986.Action on Three Individuals Suspended on 860703 Pending
PNO-III-86-138, on 861120,both Component Cooling Water Pumps Tripped,Rendering Sys Inoperable for 12 Minutes.Caused by Pressure Surge Resulting in Lifting of Relief Valve on Excess Letdown HX Line.Line Will Be Removed & Examined20 November 1986PNO-III-86-138:on 861120,both Component Cooling Water Pumps Tripped,Rendering Sys Inoperable for 12 Minutes.Caused by Pressure Surge Resulting in Lifting of Relief Valve on Excess Letdown HX Line.Line Will Be Removed & Examined
PNO-III-86-151, on 861218,during Mode 3,loss of Water & Drop in Pressure Noticed in Accumulator 2D.Caused by Crack in 1-inch Line Used in Filling Accumulator.Cause of Crack Still Unknown.Unit Currently in Mode 4 Pending Repairs18 December 1986PNO-III-86-151:on 861218,during Mode 3,loss of Water & Drop in Pressure Noticed in Accumulator 2D.Caused by Crack in 1-inch Line Used in Filling Accumulator.Cause of Crack Still Unknown.Unit Currently in Mode 4 Pending Repairs
PNO-III-87-006, on 870109,unit Achieved Initial Criticality. Actual Point of Criticality Consistent W/Point Predicted. Licensee Schedule Calls for Completion of Low Power Testing on 8701219 January 1987PNO-III-87-006:on 870109,unit Achieved Initial Criticality. Actual Point of Criticality Consistent W/Point Predicted. Licensee Schedule Calls for Completion of Low Power Testing on 870121
PNO-III-87-007, on 870107,diesel Generator 1A Declared Inoperable.Caused by Potentially Defective Piston Connecting Rod.Spare Rod Taken from Braidwood & Installation & Testing Completion Expected by 8701109 January 1987PNO-III-87-007:on 870107,diesel Generator 1A Declared Inoperable.Caused by Potentially Defective Piston Connecting Rod.Spare Rod Taken from Braidwood & Installation & Testing Completion Expected by 870110
PNO-III-87-017, on 870130,facility Received Full Power Ol. Licensee Expects to Go Beyond 5% Power in Early Feb.State of Il Notified30 January 1987PNO-III-87-017:on 870130,facility Received Full Power Ol. Licensee Expects to Go Beyond 5% Power in Early Feb.State of Il Notified
PNO-III-87-066, on 870509,during Process of Heating Up Unit Following Refueling Outage,Water Hammer Damaged Main Steam Line 1B Outside Containment.Cause Unknown.Msivs & Bypass Valves Taken Out of Svc & Repairs Started11 May 1987PNO-III-87-066:on 870509,during Process of Heating Up Unit Following Refueling Outage,Water Hammer Damaged Main Steam Line 1B Outside Containment.Cause Unknown.Msivs & Bypass Valves Taken Out of Svc & Repairs Started
PNO-III-87-066A, on 870509,piping Elbows & Hangers Damaged by Alleged Water Hammer.Piping Elbows on Each End of 200-ft Run of Main Steam Line Piping Dropped 7 Inches.Indication Found on pipe-to-elbow Weld Downstream of MSIV B.Cause Unknown14 May 1987PNO-III-87-066A:on 870509,piping Elbows & Hangers Damaged by Alleged Water Hammer.Piping Elbows on Each End of 200-ft Run of Main Steam Line Piping Dropped 7 Inches.Indication Found on pipe-to-elbow Weld Downstream of MSIV B.Cause Unknown
PNO-III-87-081, on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants11 June 1987PNO-III-87-081:on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other PlantsEarthquake
PNO-III-87-128, on 871002,facility Tripped from 7% Power Due to High Water Level in One of Four Steam Generators,Creating Loss of Offsite Power.Caused by Personnel Error.Licensee Inspecting Damage to Auxiliary Transformer Disconnect Links2 October 1987PNO-III-87-128:on 871002,facility Tripped from 7% Power Due to High Water Level in One of Four Steam Generators,Creating Loss of Offsite Power.Caused by Personnel Error.Licensee Inspecting Damage to Auxiliary Transformer Disconnect Links
PNO-III-88-010, on 880210,as Result of Ongoing Investigation, 12 Contractor Fire Surveillance Personnel Terminated & 34 Addl Individuals Suspended.Caused by Discrepancies in Electronic Door Entry Records & Workers Records11 February 1988PNO-III-88-010:on 880210,as Result of Ongoing Investigation, 12 Contractor Fire Surveillance Personnel Terminated & 34 Addl Individuals Suspended.Caused by Discrepancies in Electronic Door Entry Records & Workers Records
PNO-III-88-010A, on 880310,licensee Notified Region III That Investigation Into Firewatch Record Discrepancies Completed & Concluded That 51 Watchman Failed to Perform Duties,Per Procedures.Licensee Awarded Contracts to Another Contractor11 March 1988PNO-III-88-010A:on 880310,licensee Notified Region III That Investigation Into Firewatch Record Discrepancies Completed & Concluded That 51 Watchman Failed to Perform Duties,Per Procedures.Licensee Awarded Contracts to Another Contractor
PNO-III-88-029, on 880402,shutdown Begun to Repair Steam Generator Tube Leak.Leakage Rate from RCS Into Secondary Sys Calculated to Be 330 Gallons Per Day.Other Maint & Testing Work Planned in Addition to Investigation & Repair4 April 1988PNO-III-88-029:on 880402,shutdown Begun to Repair Steam Generator Tube Leak.Leakage Rate from RCS Into Secondary Sys Calculated to Be 330 Gallons Per Day.Other Maint & Testing Work Planned in Addition to Investigation & Repair
PNO-III-88-034, on 880406,up to 68 Workers Received Minor Exposures to Airborne Radioactivity,Principally I-131,during Steam Generator Tube Plugging Activities.Cause Under Investigation.Respirators Required to Enter Containment7 April 1988PNO-III-88-034:on 880406,up to 68 Workers Received Minor Exposures to Airborne Radioactivity,Principally I-131,during Steam Generator Tube Plugging Activities.Cause Under Investigation.Respirators Required to Enter Containment
PNO-III-89-035, on 890516,unit Shut Down to Repair Hydrogen Leak in Main Generator Stator Water Cooling Sys.Unit Will Be Shut Down for 9 Days for Repairs & Other Maint Activities17 May 1989PNO-III-89-035:on 890516,unit Shut Down to Repair Hydrogen Leak in Main Generator Stator Water Cooling Sys.Unit Will Be Shut Down for 9 Days for Repairs & Other Maint Activities
PNO-III-89-075, on 891122,startup Process of Reactor Was Terminated When Nuclear Instrumentation Showed That Reactor Was Approaching Criticality Sooner than Anticipated21 November 1989PNO-III-89-075:on 891122,startup Process of Reactor Was Terminated When Nuclear Instrumentation Showed That Reactor Was Approaching Criticality Sooner than Anticipated
PNO-III-97-085, on 971009,licensee Identified Gas While Venting Unit 1 Safety Injection Sys Discharge Piping During Monthly Venting Surveillance Test.On 971010,unit 2 Reactor Tripped as Result of Degraded Voltage on Power Supply14 October 1997PNO-III-97-085:on 971009,licensee Identified Gas While Venting Unit 1 Safety Injection Sys Discharge Piping During Monthly Venting Surveillance Test.On 971010,unit 2 Reactor Tripped as Result of Degraded Voltage on Power Supply
PNO-III-99-041, on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found3 September 1999PNO-III-99-041:on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was FoundEarthquake