Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
BSEP 05-0049, Request for License Amendments Regarding Suppression Chamber-to-Drywell Vacuum Breaker Surveillance Testing20 June 2005Request for License Amendments Regarding Suppression Chamber-to-Drywell Vacuum Breaker Surveillance Testing
BSEP 07-0080, Request for License Amendment Re Technical Specification 3.3.1.2, Source Range Monitor (SRM) Instrumentation.13 August 2007Request for License Amendment Re Technical Specification 3.3.1.2, Source Range Monitor (SRM) Instrumentation.Shutdown Margin
ML02035048214 October 1993License Amendments 166 and 197, Revise TS to Allow Replacement of Existing Steam Leak Detection Equipment with General Electric Numac EquipmentReactor Vessel Water Level
ML0206706846 March 2002Issuance of Amendment, Allows One-Time Interval Increase for Type a, Integrated Leakage Rate Test for No More than 3 Years, 2 Months
ML0207207428 March 2002Issuance of Amendment to Incorporate General Electric Digital Power Range Neutron Monitoring System (TAC MB2321 and MB2322)Shutdown Margin
Power Uprate
ML02079047914 March 2002Issuance of Amendments, Implementing Technical Specification Task Force Traveler Item 51, Rev.2 (TAC Nos. MB2570 Ad MB2571)Probabilistic Risk Assessment
Recently irradiated fuel
ML02081023619 March 2002Issuance of Amendments Regarding Scram Time Testing & Technical Specification Bases Control Program (TAC Nos. MB3347 and MB3348)
ML02087060322 March 2002Issuance of Amendment 220 Regarding Revision of Safety Limits Minimum Critical Power RatioSafety Limit Minimum Critical Power Ratio
Power Uprate
ML02143055131 May 2002Issuance of Amendments, Revising TS to Allow an Increase in the Maximum Power Level at Each Unit from 2558 Mwt Thermal to 2923 MwtSafe Shutdown
Fire Protection Program
Power Uprate
ML02148048330 May 2002Issuance of Amendment Alternative Source TermSeismically rugged
Earthquake
Fuel cladding
Power Uprate
ML0215402993 June 2002Issuance of Amendment Re TS Surveillance Frequency and Action Requirements for Suppression chamber-to-drywell Vacuum Breakers
ML02238036926 August 2002Issuance of License Amendments Nos. 224 and 249 Missed SurveillancesEnforcement Discretion
Probabilistic Risk Assessment
Missed surveillance
Large early release frequency
ML02331027021 November 2002License Amendment 250 Regarding Containment Leakage Rate Testing ProgramProbabilistic Risk Assessment
Large early release frequency
Stress corrosion cracking
ML02353050013 December 2002License Amendment No.251, Delete Requirement to Include Check Valve MVD-V5008 in Facility Check Valve ProgramSafe Shutdown Earthquake
Seismically rugged
ML03015052813 January 2003Issuance of License Amendments Administrative Controls for High Radiation AreasHigh Radiation Area
ML03043000611 February 2003Amendments 226 & 253 to Licenses DPR-71 & DPR-62, Respectively, Elimination of Requirements for Post-accident Sampling SystemGrab sample
ML03084035025 March 2003License Amendment Nos. 227 & 255 Standby Liquid Control Sodium Pentaborate Solution Concentration and RequirementsShutdown Margin
Power Uprate
ML03087024425 March 2003Issuance of Amendment Regarding Revision of Safety Limit Minimum Critical Power RatioSafety Limit Minimum Critical Power Ratio
ML03169068318 June 2003Issuance of Amendment Nos. 228 & 256, Changing the Technical Specifications Related to the Pressure-Temperature Limit CurvesPower Uprate
ML04058035826 February 2004Amendment, Turbine Building Ventilation System Updated Final Safety Analysis Report Change (TAC Nos: MC0034 & MC0035)Grab sample
Offsite Dose Calculation Manual
Temporary Modification
ML04139048217 May 20045/17/04, Brunswick, Units 1 & 2, Amendment Nos. 232 & 259, Revising TS 3.1.8 Re Scram Discharge Volume Vent & Drain ValvesScram Discharge Volume
ML04312001528 October 2004Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat...Safeguards Contingency Plan
Offsite Circuit
ML04348040711 January 2005Amendment, Increase Flexibility in Mode RestraintsSafe Shutdown
Probabilistic Risk Assessment
Missed surveillance
Significance Determination Process
Large early release frequency
Power change
ML0503302332 February 2005License Amendments 234, 261, Elimination of Requirements for Hydrogen and Oxygen Monitors Using the Consolidated Line Item Improvement ProcessProbabilistic Risk Assessment
Fuel cladding
ML0504701314 March 2005Amendment, Addition of Tracg Methodology for Determnining Core Operating Limits (Tac No. MC4385)Anticipated operational occurrence
ML05111052419 April 2005Amendment No. 235 and 263, Elimination of Monthly Operating and Annual Occupational Radiation Exposure Reports Requirements
ML05145006431 May 2005Issuance of Amendments 236 and 264 Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency TAC Nos. MC5865, MC5866
ML05159050128 June 2005Amendment, TS 3.4.5 RCS Ld Instrumentation (Tac No. MC7216, MC7217)Enforcement Discretion
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
ML05168009523 May 2005E-mail Brunswick Cooling Tower InformationGrab sample
ML0520903281 August 2005Corrections to Operating License Nos. DPR-071 and DPR-062 in Conjunction W/Commission Order EA-03-086 (Tac No. MC2895, MC2896)Safeguards Contingency Plan
Offsite Circuit
ML0601800888 February 2006License Amendment, Revised Primary Containment Leakage Rate (TAC No'S MC8110 & MC8111)
ML0605402052 March 2006Amendment, MSIV (TAC MC8106, TAC Mc 8107)Seismically rugged
Earthquake
GOTHIC
Manual Operator Action
ML0608902835 May 2006License Amendment 240 and 268, Suppression Chamber-To-Drywell Vacuum Breakers
ML06166037526 June 2006Renewed Facility Operating License No. DPR-71Safe Shutdown
Safeguards Contingency Plan
License Renewal
Offsite Circuit
Fire Protection Program
Power Uprate
ML06166037826 June 2006Renewed Facility Operating License No. DPR-62Safe Shutdown
Safeguards Contingency Plan
Offsite Circuit
Fire Protection Program
Power Uprate
ML06306034015 February 2007Issuance of License Amendments 241 and 269 to Adopt TSTF-372Safe Shutdown Earthquake
Probabilistic Risk Assessment
Large early release frequency
Earthquake
ML07093046921 March 2007Administrative Change to Facility Operating Licenses in Conjunction with Commission Order EA-06-037Safeguards Contingency Plan
Offsite Circuit
ML0721905279 August 2007Revised Pages of Facility Operating License No. DPR-71 and DPR-62
ML07260032727 September 2007Issuance of Amendments 242 and 270 Related to Main Fuel Oil Storage TankProbabilistic Risk Assessment
Large early release frequency
Manual Operator Action
ML07331055227 November 2007License Amendment, Issuance of Amendment Storage of Areva Np FuelWater rod
ML0801800538 February 2008Amendments-Brunswick, Units 1 and 2, Issuance of Amendment Regarding Primary Containment Leakage Rate Testing ProgramIncorporated by reference
ML08093063727 March 2008Issuance of Amendments to Support Transition to Areva Fuel and Methodologies
ML08175030325 July 2008License Amendments, Revised Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448Safe Shutdown
Functionality Assessment
Operability Determination
Earthquake
ML09055005513 April 2009License Amendment, Issuance of Amendments No. 252 & 280 Adoption of TSTF-478, Revision 2 - BWR Technical Specification Changes That Implement Revised Rule for Combustible Gas Control (TAC ME0168 & ME0169)Safe Shutdown
High Radiation Area
Safeguards Contingency Plan
Recently irradiated fuel
Offsite Circuit
Fire Protection Program
ML11101A0438 April 2011Issuance of Amendments Regarding Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5 (TAC Nos. ME3858 and ME3859) - RedactedSafe Shutdown
Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Post Accident Monitoring
Feedwater Controller Failure
Safeguards Contingency Plan
Commercial Grade
Fuel cladding
Offsite Circuit
Fire Protection Program
Power change
Operability Assessment
Power Uprate
Water rod
ML11193A02829 July 2011Issuance of Amendments Approval of Cyber Security PlanSafe Shutdown
Cyber Security
Safeguards Contingency Plan
Offsite Circuit
Fire Protection Program
Cyber attack
ML11196A07725 August 2011Issuance of Amendments Regarding Changes to Technical Specification 5.3.1 for the Operations Manager Station Staff PositionSafe Shutdown
Safeguards Contingency Plan
Offsite Circuit
Fire Protection Program
ML11270A37121 December 2011Issuance of Amendments Regarding Adoption of TSTF-514Safe Shutdown
Grab sample
Safeguards Contingency Plan
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Unidentified leakage
ML12339A06718 December 2012Issuance of License Amendments Regarding Cyber SecuritySafe Shutdown
Cyber Security
Safeguards Contingency Plan
Offsite Circuit
Fire Protection Program
ML13037A5511 March 2013Issuance of Amendments Regarding Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2Safe Shutdown
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Safeguards Contingency Plan
Offsite Circuit
Fire Protection Program
Operability Assessment