Revised Pages of Facility Operating License No. DPR-71 and DPR-62
ML072190527
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/09/2007
From: Stewart Bailey
NRC/NRR/ADRO/DORL/LPLII-2
To: Scarola J
Carolina Power & Light Co
Bailey, S N, NRR/ADRO/DORL/LPL II-2
Shared Package
ML072070357 List:
References
TAC MD4516, TAC MD4517
Download: ML072190527 (3)


Text

ENCLOSURE 1 NEW PAGE OF RENEWED FACILITY OPERATING LICENSE NO. DPR-71 NEW PAGE OF RENEWED FACILITY OPERATING LICENSE NO. DPR-62 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 Insert the following pages of the Facility Operating Licenses (FOLs). The new pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change. The existing seventh (last) pages of the FOLs will become page 8.

INSERT PAGE License DPR-71 Page 7 License DPR-62 Page 7

P. Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(1) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (2) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (3) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders Q. The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.

Renewed License No. DPR- 71 Revised by letter dated August 9, 2007

M. Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(1) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (2) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (3) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders N. The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.

Renewed License No. DPR-62 Revised by letter dated August 9, 2007