Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000261/LER-2016-001 | 21 March 2016 | Inoperability of Motor-Driven Auxiliary Feedwater Pumps Due to Insufficient Lube Oil Cooling LER 16-001-00 for H.B. Robinson, Unit 2, Regarding Inoperability of Motor-Driven Auxiliary Feedwater Pumps Due to Insufficient Lube Oil Cooling | Temporary Modification FLEX |
05000261/LER-2016-002 | 13 June 2016 | Unanalyzed Condition Related to Main Steam Line Break Inside Containment LER 16-002-00 for H.B. Robinson Steam Electric Plant, unit No. 2, Regarding Unanalyzed Condition Related to Main Steam Line Break Inside Containment | Unanalyzed Condition Probabilistic Risk Assessment |
05000261/LER-2016-005 | 22 February 2017 | Reactor Trip and Automatic System Actuation Due to Weather-Related Grid Disturbance LER 16-005-01 for H. B. Robinson Steam Electric Plant, Unit 2 Regarding Reactor Trip and Automatic System Actuation Due to Weather-Related Grid Disturbance | Subsequent actuation |
05000261/LER-2017-001 | 1 June 2017 | Auxiliary Feedwater System Actuation During Surveillance Testing LER 17-001-00 for H.B. Robinson, Unit 2, Regarding Auxiliary Feedwater System Actuation During Surveillance Testing | |
05000261/LER-2017-002 | 14 December 2017 | Plant Vital Area Security Vulnerability Discovered Without Compensatory Security Measures LER 17-002-00 for H.B. Robinson, Unit 2, Regarding Plant Vital Area Security Vulnerability Discovered Without Compensatory Security Measures | Time of Discovery Contraband Scaffolding |
05000324/LER-2016-001 | 8 August 2016 | Mispositioned Valves Result in Residual Heat Removal Service Water System Inoperability LER 16-001-00 for Brunswick Steam Electric Plant, Unit 2, Regarding Mispositioned Valves Result in Residual Heat Removal Service Water System lnoperability | |
05000324/LER-2016-002 | 2 May 2016 | High Pressure Coolant Injection System Inoperable due to Failed Relay Coil LER 16-002-00 for Brunswick Steam Electric Plant (BSEP), Units 1 and 2, Regarding Emergency Diesel Generator 3 Inoperable Due to Failure to Auto-Start | |
05000324/LER-2017-001 | 18 May 2017 | Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 LER 17-001-00 for Brunswick, Unit 2, Regarding Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 | Enforcement Discretion |
05000324/LER-2017-002 | 12 June 2017 | Plant Mode Change with Primary Containment Inoperable LER 17-002-00 for Brunswick, Unit 1, Regarding Foreign Material in Switch Results in Unplanned Automatic Start of Emergency Diesel Generators | |
05000324/LER-2017-003 | 3 August 2017 | 1 OF 4 LER 17-003-00 for Brunswick, Unit 2, Regarding Setpoint Drift in Main Steam Line Safety/Relief Valves Results in Three Valves Inoperable, | Corrosion bonding |
05000325/LER-2016-001 | 6 April 2016 | Electriqal Bus Fault Results in Lockout of Startup Auxiliary Transformer and Loss of Offsite Power LER 16-001-00 for Brunswick, Unit 1, Regarding Electrical Bus Fault Results in Lockout of Startup Auxiliary Transformer and Loss of Offsite Power | Safe Shutdown Arc flash |
05000325/LER-2016-003 | 2 May 2016 | Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 LER 16-003-00 for Brunswick Steam Electric Plant, Unit 1 Regarding Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 | Enforcement Discretion |
05000325/LER-2017-003 | 2 August 2017 | Control Room Air Conditioning and Emergency Ventilation Systems Rendered Inoperable LER 17-003-00 for Brunswick, Unit 1, Regarding Control Room Air Conditioning and Emergency Ventilation Systems Rendered Inoperable | |
BSEP 01-0164, Part 2 of 2, Enclosure 3, Brunswick Steam Electric Plant, Units 1 & 2, Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate (NRC Tac Nos. MB2700 & MB2701) | 24 January 2002 | Part 2 of 2, Enclosure 3, Brunswick Steam Electric Plant, Units 1 & 2, Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate (NRC Tac Nos. MB2700 & MB2701) | Safe Shutdown Stroke time Operating Basis Earthquake Flow Induced Vibration Power Uprate |
BSEP 02-0008, Response to Request for Additional Information Re Inservice Inspection Program Relief Request for Service Water System Piping non-code Repair | 18 January 2002 | Response to Request for Additional Information Re Inservice Inspection Program Relief Request for Service Water System Piping non-code Repair | |
BSEP 02-0009, Response to Request for Additional Information Regarding Request for License Amendments Regarding Thermal Hydraulic Stability | 14 January 2002 | Response to Request for Additional Information Regarding Request for License Amendments Regarding Thermal Hydraulic Stability | |
BSEP 02-0010, Response to Request for Additional Information Re Request for License Amendments - Frequency of Performance Based Leakage Rate Testing | 31 January 2002 | Response to Request for Additional Information Re Request for License Amendments - Frequency of Performance Based Leakage Rate Testing | Probabilistic Risk Assessment Large early release frequency Earthquake |
BSEP 02-0012, Response to Request for Additional Information - Request for License Amendments to Adopt Alternative Radiological Source Term | 24 January 2002 | Response to Request for Additional Information - Request for License Amendments to Adopt Alternative Radiological Source Term | Power Uprate |
BSEP 02-0016, Response to Request for Additional Information - Request for License Amendments to Adopt Alternative Radiological Source Term | 24 January 2002 | Response to Request for Additional Information - Request for License Amendments to Adopt Alternative Radiological Source Term | Non-Destructive Examination Design basis earthquake Earthquake |
BSEP 02-0019, Response to Request for Additional Information - Request for License Amendments to Adopt Alternative Radiological Source Term | 4 February 2002 | Response to Request for Additional Information - Request for License Amendments to Adopt Alternative Radiological Source Term | Mission time Power Uprate Manual Operator Action |
BSEP 02-0020, Response to Request for Additional Information Re Proposed Changes to Emergency Action Level Classifications | 24 January 2002 | Response to Request for Additional Information Re Proposed Changes to Emergency Action Level Classifications | |
BSEP 02-0021, Response to Request for Additional Information Regarding Request for License Amendments to Adopt Alternative Radiological Source Term | 4 February 2002 | Response to Request for Additional Information Regarding Request for License Amendments to Adopt Alternative Radiological Source Term | |
BSEP 02-0022, Transmittal of Addressee Changes to Service/Distribution List for Brunswick Steam Electric Plant Unit 2 | 28 January 2002 | Transmittal of Addressee Changes to Service/Distribution List for Brunswick Steam Electric Plant Unit 2 | |
BSEP 02-0030, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | 4 February 2002 | Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | Probabilistic Risk Assessment Large early release frequency Power Uprate Manual Operator Action |
BSEP 02-0032, Response to Request for Additional Information Regarding Request for License Amendments - Frequency of Performance-Based Leakage Rate Testing | 5 February 2002 | Response to Request for Additional Information Regarding Request for License Amendments - Frequency of Performance-Based Leakage Rate Testing | |
BSEP 02-0033, Additional Information Related to Request for License Amendments - Thermal-Hydraulic Stability Option III | 1 February 2002 | Additional Information Related to Request for License Amendments - Thermal-Hydraulic Stability Option III | |
BSEP 02-0034, Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate | 1 February 2002 | Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate | Power Uprate |
BSEP 02-0035, Revised Request for License Amendments, Frequency of Performance-Based Leakage Rate Testing | 11 February 2002 | Revised Request for License Amendments, Frequency of Performance-Based Leakage Rate Testing | High Radiation Area Offsite Dose Calculation Manual Post Accident Monitoring Probabilistic Risk Assessment Annual Radiological Environmental Operating Report Process Control Program Deep Dose Equivalent |
BSEP 02-0037, Response to NRC Request for Additional Information Re Request for License Amendments for Extended Power Uprate | 13 February 2002 | Response to NRC Request for Additional Information Re Request for License Amendments for Extended Power Uprate | Power Uprate |
BSEP 02-0038, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | 21 February 2002 | Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | Power Uprate |
BSEP 02-0041, Response to Request for Additional Information, Request for License Amendments for Extended Power Uprate | 14 February 2002 | Response to Request for Additional Information, Request for License Amendments for Extended Power Uprate | Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Power Uprate |
BSEP 02-0042, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | 25 February 2002 | Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | Stroke time Power Uprate |
BSEP 02-0043, Plans for Resolution of NRC Generic Letter 92-08, Thermo-Lag 330-1 Fire Barriers | 5 March 2002 | Plans for Resolution of NRC Generic Letter 92-08, Thermo-Lag 330-1 Fire Barriers | Fire Barrier |
BSEP 02-0044, Distribution of Site-Specific and State Emergency Planning Information | 20 February 2002 | Distribution of Site-Specific and State Emergency Planning Information | |
BSEP 02-0046, Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate | 21 February 2002 | Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate | Power Uprate |
BSEP 02-0047, Submittal of Technical Specification Bases Changes for Revision 20 | 20 February 2002 | Submittal of Technical Specification Bases Changes for Revision 20 | |
BSEP 02-0048, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | 25 February 2002 | Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | Power Uprate |
BSEP 02-0049, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | 25 February 2002 | Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | Offsite Dose Calculation Manual Power Uprate |
BSEP 02-0051, Response to Request for Additional Information - Request for License Amendment Regarding Revision of Minimum Critical Power Ratio Safety Limit Values (NRC TAC Nos. MB2952) | 5 March 2002 | Response to Request for Additional Information - Request for License Amendment Regarding Revision of Minimum Critical Power Ratio Safety Limit Values (NRC TAC Nos. MB2952) | Safety Limit Minimum Critical Power Ratio Affidavit |
BSEP 02-0054, Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate (NRC TAC Nos. MB2700 & MB2701) | 4 March 2002 | Response to Request for Additional Information Re Request for License Amendments - Extended Power Uprate (NRC TAC Nos. MB2700 & MB2701) | Power Uprate Affidavit |
BSEP 02-0057, Twenty-Day Response to Order for Interim Safeguards and Security Compensatory Measures | 15 March 2002 | Twenty-Day Response to Order for Interim Safeguards and Security Compensatory Measures | |
BSEP 02-0058, February 2002 Monthly Operating Report for Brunswick, Units 1 & 2 | 11 March 2002 | February 2002 Monthly Operating Report for Brunswick, Units 1 & 2 | |
BSEP 02-0059, Unit 1 Cycle 14 Core Operating Limit Report, Supplemental Reload Licensing Report, Loss-of-Coolant Accident Analysis Report & Plant-Specific Emergency Core Cooling System (ECCS) Evaluation | 22 March 2002 | Unit 1 Cycle 14 Core Operating Limit Report, Supplemental Reload Licensing Report, Loss-of-Coolant Accident Analysis Report & Plant-Specific Emergency Core Cooling System (ECCS) Evaluation | Shutdown Margin Power Uprate Affidavit |
BSEP 02-0060, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | 5 March 2002 | Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | Large early release frequency Power Uprate |
BSEP 02-0061, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | 7 March 2002 | Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | Power Uprate |
BSEP 02-0065, Response to Request for Additional Information Re Request for Amendments Re Extended Power Uprate | 14 March 2002 | Response to Request for Additional Information Re Request for Amendments Re Extended Power Uprate | Power Uprate |
BSEP 02-0067, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | 14 March 2002 | Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | Power Uprate |
BSEP 02-0068, Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | 20 March 2002 | Response to Request for Additional Information Regarding Request for License Amendments - Extended Power Uprate | MELLLA Power Uprate |
BSEP 02-0070, Additional Information on License Amendments Re Extended Power Uprate | 22 March 2002 | Additional Information on License Amendments Re Extended Power Uprate | Power Uprate |
BSEP 02-0071, License Condition Support Request for License Amendments Re Extended Power Uprate for Brunswick Steam Electric Plant, Units 1 & 2 | 25 March 2002 | License Condition Support Request for License Amendments Re Extended Power Uprate for Brunswick Steam Electric Plant, Units 1 & 2 | Power Uprate |