Issue date | Title | Topic | |
---|---|---|---|
IR 05000315/1989005 | 9 June 1989 | Advises That Failure of Component Cooling Water Containment Isolation Valve 1-CCM-458 to Close Not Reportable Per 10CFR50.73.LER 50-315/89-05 Retracted & LER Number Will Not Be Reissued | Time of Discovery |
ML17265A823 | 24 May 1999 | LER 98-037-01:on 990422,determined That Ice Condenser Bypass Leakage Exceeds Design Basis Limit.Caused by Pressure Seal Required by Revised W Design Not Incorporated Into Aep Design.Numerous Matl Condition Walkdowns & Assessments Made | Unanalyzed Condition |
ML17317A651 | 3 October 1978 | LER#78-053/03L-0 on 780907:containment Atmosphere Gaseous & Particulate Monitoring Pump Discovered Inoperable.Failure Attributed to Obsolesence.Pump Replaced W/Improved Model W/ Longer Operational Expectancy | |
ML17317A658 | 11 October 1978 | LER 78-069/03L-0:on 780913,while Performing Surveillance on Pressurizer Protection Sys,Reactor Trip Bistable Failed to Trip on Simulated High Pressure Signal.Bistable Replaced | |
ML17317A659 | 11 October 1978 | LER 78-070/03L-0:on 780911,air Start Line on Diesel 2AB Found to Be Hot During Load Test.Caused by Loose Piston Bolt Letting Combustion Vapors in Air Starting Line.Check Valve Replaced & Engine Retested Satisfactorily | Offsite Circuit |
ML17317A669 | 18 October 1978 | LER 78-072/03L-0:on 780926,during Rapid Load Reduction from 100% to 20% Power,Pressurizer Pressure Reduced Below Tech Spec Limit.Caused by Rapid Power Reduction | |
ML17317A670 | 18 October 1978 | LER 78-063/03L-1:on 780820,while Closing Turbine Valves at 99% Power,Steam Flow Reduced,Causing Reactor Coolant Temp to Increase & Power to Decrease.Caused by Testing Valves at Too High Power Level | |
ML17317A678 | 20 October 1978 | LER#78-056/03L on 780923: After Shutdown Boron Concentration Was 1940 Ppm,Which Is Below Limit Due to Reduction of Boron Level After Sampling at 1% Accumulator Vol Increase.Admin Procedure Was Rev to Req Level & Boron Verification | |
ML17317A688 | 20 October 1978 | LER 78-074/03L-0:on 780921,bistables Returned to Normal from Trip Position W/O Dynamics of lead-lag Portion of Unit Being Calibr.Caused by Improper Communications | |
ML17317A715 | 1 November 1978 | LER#78-076/03L-0 on 781003:surveillance Tests on train-B of Solid St Protec Sys Showed That Several Switch Positions Were Bad.Caused by Bad Universal Logic Card.Card Replaced & Sys Returned to Svc | |
ML17317A716 | 1 November 1978 | LER#78-077/03L-0 on 781005:main Turbine Stop Valves C & D Closure Limit Switches Found Inoperable.Caused by Excessive Vibration of Stop Valves Due to Poor Design | |
ML17317A733 | 8 November 1978 | LER#78-034/03X-2 on 780515:hydrogen Skimmer Recirculation Fans Starting Times Were Found to Be 10 minutes,6 Seconds for 2HV-CEQ2 & 10 minutes,5 Seconds for 2-HV-CEQ1.One Minute TS Tolerance for Unit 2 & Agastats Are of 0-60 Minute Range | |
ML17317A734 | 8 November 1978 | LER 78-034/03l-0:on 781010,manual Isolation Valve in Flow Test Circuit of Turbine Driven Aux Feed Pump Found Unlocked & Open.Instructions Issued to Keep a Manual Valve in Test Line Closed & Locked Except When Testing | |
ML17317A735 | 8 November 1978 | LER 78-079/03L-0:on 781019,engine Failed to Start While Attempting to Prove Operability of 2AB Emergency Diesel in Order to Remove 2CD Diesel from Svc.Cause for Apparent Lack of Fuel Could Not Be Determined | |
ML17317A740 | 15 November 1978 | LER#78-060/03L-0 on 781028:RCS Leak Discovered Due to Excessive Packing on a 314 Valve in Pzr Safety Valve Loop Seal Drain Line.Valve Found to Be 1/8 Turn Open.Valve Closed and Leakage Stopped | Loop seal |
ML17317A765 | 22 November 1978 | LER#78-080/03L-0 on 781024:during Test of Solid St Protec Sys,Train A,3 Logic Test Positions Tested Unsatisfactorily. Caused by Failure of a Universal Logic Card & a Test Card. Both Subsequently Replaced | |
ML17317A766 | 22 November 1978 | LER#78-081/03L-0 on 781023:boron Injection Tank Boron Concentration Found to Exceed Tech Spec Limit.Caused by Either Lack of Effective Mixing from a Previous Boric Acid Solution Addition or by Faulty Sampling Methods | Boric Acid |
ML17317A767 | 22 November 1978 | LER#78-082/03L-0 on 781025:during Leak Rate Test on the 650 Foot Elevation Airlock Doors,Noted That Leakage Rate Exceeded Acceptable Limits.Caused by Inadequate Seal of Outer Door.Switch Indicator Subsequently Readjusted | |
ML17317A768 | 22 November 1978 | LER#78-083/03L-0 on 781023:noted That Cycling Times for Valve Operability Test After Maintenance Not Recorded When Valves Stroked.Caused by Defective Document Control for Issuing Changes to Instructions | |
ML17317A777 | 1 December 1978 | LER#78-085/03L-0 on 781106:during Routine Surveillance Test Turbine Driven Auxiliary Feedwater Pump Did Not Start.Caused by Zener Diode Which Had Shorted at Electronic Overspeed Monitor,Resulting in Constant Overspeed Trip Signal | |
ML17317A782 | 1 December 1978 | LER#78-061/03L-0 on 780823:discovered That During Past Surveillance Testing,Allowable Surveillance Extension Had Been Exceeded for Target Flux Difference Surveillance Test. Caused by Personnel Error | |
ML17317A784 | 4 December 1978 | LER#78-086/03L-0 on 780723:snubber#63 Was Found to Be Inverted on Its Horizontal Axis During Inspec Due to Loose Rod End Locknut.Snubber Removed,Tested & Reinstalled | |
ML17317A787 | 6 December 1978 | LER#78-087/03L-0 on 781110:Containment Integrity Was Broken by Disassembling an NESW Check Valve While Reactor Plant Was in Mode 3.Early Start of Repair Has Been Reviewed by Personnel to Prevent Future Mistake | |
ML17317A791 | 7 December 1978 | LER 78-062/03L-0:on 781107,Unit 1 AB Diesel Declared Inoperable Following Inadvertent Removal of Circuit Board Card from Diesel Voltage Regulator Circuitry.Removal Caused by Technician Snagging the Board on Clothing | |
ML17317A794 | 7 December 1978 | LER#78-089/03L-0 on 781109:emergency Load Reduction Resulted in Axial Flux Difference Outside Target Band.Caused by Loss of All Generator Bus Duct Cooling | |
ML17317A803 | 12 December 1978 | LER#78-090/01T-0 on 781121:w/RHR in Oper,Leakage Was Noted from Some Upper Containment Spray Nozzles,Caused by Check Valves CTS-127E & CTS-127W Being Installed Backwards | |
ML17317A821 | 20 December 1978 | LER#78-063/03L-0 on 781128:aux Feed Throttle from Mdafp to #3S/G Position Indication Was Intermittent;Valve Would Not Close Electrically.Caused by Broken Lead Between Terminal #43 & #57 on Aux Switch of Limitorque SMB-0-25 Operator | |
ML17317A824 | 20 December 1978 | LER#78-091/03L-0 on 781125:source Range Neutron Flux Channel N-31 Inoperable.Caused by Unclean Connectors on High Voltage Cable & Signal Cable at Prcamp | |
ML17317A825 | 20 December 1978 | LER#78-092/03L-0 on 781125:reactor Coolant Average Temp on 2 of 4 Loops Below Tech Specs of 541F,resulting in P-12 Permissive Being Actuated.Caused by Turbine Test W/Minimum Steam Dump,Increase Steam Flow Caused Temp Drop | |
ML17317A826 | 20 December 1978 | LER#78-093/03L-0 on 781125:rod Position Indication(Rpi)For Control Rod H-8 Exceeded 12 Step Limit.Caused by H-8 Drift | |
ML17317A827 | 20 December 1978 | LER#78-094/03L-0 on 781202:halon Sys for Cable Spreading Area Was Discharged & Therefore Inoperable.Caused by Operator Error | |
ML17317A828 | 20 December 1978 | LER#78-095/03L-0 on 781206:while Decreasing Turbine Load, Reactor Coolant Average Temp Exceeded 576.2 F.Caused by Faulty Drain Valves on 5-A Heater,Creating Unstable Feedwater Control & Turbine Load | |
ML17317A829 | 20 December 1978 | LER#78-096/03L-0 on 781209:during Rapid Load Reduction from 100% to 88%,axial Flux Difference Went Outside Target Band. Air Leak on a Condenser Vacuum Breaker Caused Increase in Back Pressure on Main Condenser | |
ML17317A830 | 20 December 1978 | LER#78-097/03L-0 on 781209:during Rapid Pwr Reduction from 100% to 88%,pwr Pressurizer Pressure Reduced Below Tech Spec Limit of 2220psia.Caused by Rapid Pwr Reduction Because of Decreasing Vacuum on Main Turbine/Generator | |
ML17317A831 | 20 December 1978 | LER#78-098/03L-0 on 781010:axial Flux Difference(Afd) Monitoring Alarm Point Was Discovered to Be Set at 103% Vice 84%.Caused by Afd Alarm Trip Point Being Raised for Testing Purposes & Not Returned to Correct Point | |
ML17317A846 | 28 December 1978 | LER 78-099/03L-0 on 781212:pressurizer Pressure Was Reduced to 2215 Psia,Caused by Trip of Circuit Breaker Controlling Instrument Air to Containment.Loss of Air Closed Letdown Valves,Left No Air to Open Spray Valves | |
ML17317A861 | 29 December 1978 | LER 78-100/01T-0 on 781217:containment APD(R-11)ran Out of Filter Paper & Caused High Flow Condition.Sample Pump Tripped,Rendered Containment Gaseous Monitoring Sys Inoperable.Caused by Need for Filter Paper in Sample Pump | |
ML17317A864 | 5 January 1979 | LER 78-101/01T-0 on 781223:both Control Room Pressurization Fans Were Inoperable.Caused by Water Seepage Into a Fire Protection Sys Switch,Resulting in Actuation of Fire Spray Sys & Lockout of the Fans | Boric Acid Safe Shutdown Earthquake Coatings Nondestructive Examination Overtravel Inattentive |
ML17317A870 | 9 January 1979 | LER 78-064/03L-0 on 781214:during Surveillance Noted That Position of Rod M-8 Was Greater than Allowable 12 Step Limit.Caused by Maladjustment of Variable Shunt Resistor Contained in Control Board Indicator for Rod M-8 | |
ML17317A881 | 16 January 1979 | LER 78-023/03X-1 on 780312:during Containment Air Lock Leakage Test on 650 Foot Elevation Inner Door,Door Seal Leakage Rate Exceeded Tech Spec Limit,Caused by Paint Chips on Rubber Seal Which Obstructed Proper Seal on Door | |
ML17317A884 | 16 January 1979 | LER 78-038/03X-1 on 780623:while in Mode 2,position of Rods C-3,C-13,N-13,H-6,F-8 & K-8 Indicated Deviation of Greater than 12 Steps from Demand Position.Caused by Signal Conditioning Modules | |
ML17317A886 | 16 January 1979 | LER 78-042/03X-1 on 780710:during Startup Testing,Flux Map Measurement Was Not Processed During Specified Time Limit. Though Flux Map Was Obtained,It Was Not Processed Due to Change in Manpower Requirements | |
ML17317A887 | 16 January 1979 | LER 78-065/03L-0 on 781229:indication for Pressurizer Level Channel 2 Deviated Approx 5% from Other 2 Channels.Caused by Gas Pocket in Sensing Line | |
ML17317A888 | 16 January 1979 | LER 78-066/03L-0 on 781229:during Routine Startup,Rod Position Indication for Rods F-4,D-6 & K-6 Exceeded 12 Step Limit of Tech Specs.Caused by Drift of Signal Conditioning Modules | |
ML17317A899 | 19 January 1979 | LER 78-022/03X-1 on 780407:during Normal Operation,Position Indication for Rods D-12 & H-8 Exceeded +/- 12 Step Limit of Tech Specs.Outputs of Amplifiers That Feed Control Board Indicators Found to Be Incorrect | |
ML17317A901 | 19 January 1979 | LER 78-031/03X-1 on 780507:during Normal Operation Between 780507 & 780519 RPI Did Not Meet +/- 12 Step Limit of Tech Specs 22 Times.Caused by Recessed Pins in Connector | |
ML17317A904 | 19 January 1979 | LER 78-067/03L-0 on 781223:during Routine Surveillance Test on Solid State Protection Sys,Several Logic Functions in Train B Tested Unsatisfactorily.Test Card(Model 6056033G01) Had Failed & Was Replaced | |
ML17317A905 | 19 January 1979 | LER 78-068/03L-0 on 781221:during Rapid Power Reduction from 100% to 74% Axial Flux Difference Was Forced Outside Target Band Specified by Tech Specs.Inadvertent Feed Pump Turbine Trip Necessitated Load Reduction to Prevent Trip | |
ML17317A913 | 31 January 1979 | LER 79-001/03L-0 on 790111:at 100% Power,Quadrant Power Tilt Ratio Alarm Per Tech Spec 4.2.4 Was in Error.Calculation of Tilt Ratio Is Required Every 12-h;first Survey Was Missed Because Alarm Instruments Were Being Calibr | |
ML17317A925 | 5 February 1979 | LER 79-002/03L-0 on 790106:during Startup,Auxiliary Feedwater Motor Operated Valve Would Not Close Due to Broken Wire in SMB-0-25 Operator.Caused by Vibration & Use of Solid Conductor |