05000316/LER-1978-031-03, /03X-1 on 780507:during Normal Operation Between 780507 & 780519 RPI Did Not Meet +/- 12 Step Limit of Tech Specs 22 Times.Caused by Recessed Pins in Connector

From kanterella
(Redirected from ML17317A901)
Jump to navigation Jump to search
/03X-1 on 780507:during Normal Operation Between 780507 & 780519 RPI Did Not Meet +/- 12 Step Limit of Tech Specs 22 Times.Caused by Recessed Pins in Connector
ML17317A901
Person / Time
Site: Cook 
Issue date: 01/19/1979
From: Rischling J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17317A898 List:
References
LER-78-031-03X, LER-78-31-3X, NUDOCS 7901260171
Download: ML17317A901 (4)


LER-1978-031, /03X-1 on 780507:during Normal Operation Between 780507 & 780519 RPI Did Not Meet +/- 12 Step Limit of Tech Specs 22 Times.Caused by Recessed Pins in Connector
Event date:
Report date:
3161978031R03 - NRC Website

text

NRO F49344 366 U. S. NUCLEAR REGULATORY COMMISSION I7.77)

LICENSEE EVENT REPORT UPDATE~PORT PREVIOUS REPORT DATE 6-6&

CONTROL BLOCK:

Q tPLEASE PRINT OR TYPE ALLREQUIRED INFORMATION)

I 6

N 1

0 C

C ZQ2 0

0 0

0 0

0 0

0 0

0 0

Qs 1

1 1

1 ps~ps 7

8 9

LICENSEE CODE 14 15 I.'I CENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 CON'T

~P1

""" ~LQB 0

5 0

0 0

3 1

6Q7 0

5 0

7 7

8QBO I

I 9

7 9

QB

'DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q1P

~P2 DURING NORMAL OPERATION, TWENTY"TWO EVENTS OCCURRED BETWEEN THE DATES OF MAY 7 AND

~P3 MAY 1 9, WHERE ROD POSITION INDICATION ( RPI ) DI D NOT MEET THE +

1 2 STEP LIMIT OF T.S. 3.1.3.2.

THE ATTACHED SUPPLEMENT DESCRIBES ALL THESE EVENTS.

AFTER THE EVENT B

ON 5 16-78 THE RPI FOR D-8 WAS DECLARED INOPERABLE.

THE ACTION RE(UIREMENT OF 6

T.S. 3.1.3.2a WAS FULFILLED.

PREVIOUS OCCURRENCES OF A SIMILAR NATURE INCLUDE RO-050/315-78-07,04; 77-34,33,28,27, 76-54-44.13; RO-050/316-78-22,08,07.

~P B

SEE SUPPLEMENT 7

8 9

80 SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENTCOOE SUBCODE SUBCODE

~OB Q11 2

Q12

~1Q13 I

N S

T R

0 64 ~p

~Z Q16 7

8 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION 21 22 23 24 26 27 28 29 30 31 32 lAUCTION FUTURE EFFECT SHUTDOWN ATIACHMENT NPRDNI PRIME COMP.

COMPONENT Q19

~z Q19

~z Q20 ~ Q21

~ Q23

~Q24 ~ Q26 Q26 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION ANDCORRECTIVE ACTIONS Q27 p

INVESTIGATION REVEALED THE MOST OF THESE EVENTS INVOLVED MEASURING THE AFFECTED ROD'S SECONDARY COIL VOLTAGE TO VERIFY THAT THE ROD WAS AT THE PROPER POSITION.

THE SIGNAL CONDITIONING MODULE WOULD THEN BE CALIBRATED AND PLACED BACK:,IN SERVICE RETURN-3 ING RP I TO WITHIN THE 1, 1 2 STEP LIMIT.

SEVERAL OF THE EVENTS RESULTED WITH RP I RETURNING TO WITHIN THE + 12 STEP T.S.

LIMIT WITHOUT (SEE ATTACHED SUPPLEMENT).

7 8

9 FACILITY STATUS

% POWE R OTHER STATUS Q 0

NA 6

2 ps~07 Qs 7

8 9

10 12 13 44 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITYQ [116]

Z Q33 Z Q34 NA 7

8 9

10 11 44 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q3

~oo o Q32~zpss NP 7

8 9

11 12 13 PERSONNEL INJURIES METHOD OF

~

~AQ31 OPERATOR OBSERVNFOt1t 45 46 LOCATIONOF RELEASE Q 45 80 80 80 80 7.

8 9

8 P

7 8

9 10 NAME OF PREPARER 9

11 12 LOSS OF OR DAMAGE.TOFACILITY 43 TYPE

DESCRIPTION

Z Q42 NA 9

10 P U8 LIC ITY ISSUED DESCRIPTION~

~NQ44 NA Jack Rischling 80 68 69 616 465 59 80 NRC USE ONLY NO 3

80 o

0

f

SUPPLEMENT TO

EVENT DESCRIPTION

OF LICENSEE EVENT REPORT 5'78-031/03X-.l THIS IS A LISTING OF EVENTS WHERE RPI DID NOT MEET THE + 12 STEP LIMIT OF T.S. 3.1.3.2 DATE 5/7 5/8 5/8 5/9 5/9 5/10 5/10 5/10 5/10 5/10 5/12 5/14 5/14 5/15 5/15 5/15 5/15 5/1.6 5/16 5/16 5/19 5/19 TIME 2315 1210 1725 1004 2213 0358 1148 1238 2115 2318 0553 2015 2327 0355 0413 1658 2136 0040 0338 0748 0200 1611 ROD POSITION INDICATION AFFECTED D-8,D-12,M-8, H-8 C-9 D-4,D-8,D-12,M-12 D-8 D-4,D-8,D-12,M-B,H-4 D-4,D-8,D-12,M-4,M-B,M-12,H-8 D-B,H-8,D-12 M-B,M-12,H-4 D-12,H-8 D-8,M-4,H-8,H-12 D-4,D-8,D-12,M-12 H-8 H-8 D-8 D-8 D-8 D-8 D-8 D-8 D-8 (D-8 RPI Determined inoperable)

H-8 H-8 SUPPLEMENT TO CAUSE DESCRIPTION ANY CORRECTIVE ACTION.

THE D-8 RPI PROBLEM WAS FOUND TO CAUSED BY A CONNECTOR ON THE REACTOR HEAD, THE PINS WERE RECESSED IN THE CONNECTOR CAUSING THE RPI TO FLUCTUATE AS SHORTS OCCURRED.

\\

't r