Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19254F964 | 12 June 1979 | Forwards June 1979 Fire Protective Cable Tray Fire Test by Ms Abrams,Witnessed by Nb Cohn on 790606 | |
ML19260D707 | 4 February 1980 | Responds to Telcon Re IE Info Notice 79-36 Concerning Use of Nupipe Computer Program in Piping Sys Analysis.Problem Discussed in Notice Does Not Apply.Supporting Documentation Encl | |
ML19273E169 | 23 April 1980 | Concurs W/Nrc Findings Re Fire Protection Safety Evaluation. Implementation of Program Acceptable | Fire Protection Program |
ML19350B840 | 10 March 1981 | Forwards 810305 Ltr to Emphasize Importance of Matter of Irregularities at Facility,Per 801223 Ltr.Shareholders Resolution Encl.Response Requested | |
ML20073Q436 | 22 April 1983 | Informs That in Addition to Mgt Review of Facility,Contract Negotiations Have Been Conducted W/American Electric Power for Control Room Design Review on Donald C Cook Plant. Contract Will Not Influence Judgment on Mgt Review | |
ML20074A078 | 18 February 1981 | Forwards Electrical Drafting Std EDSB-126 Revised on 791005, Pages 2-43 Through 2-48 of Electrical Installation Spec H-2173 & Pages 8.3-29,8.3-30 & 8.3-65 of Fsar,Per Request Re Tray Loading Criteria.Related Info Encl | Fire Barrier |
ML20078B946 | 12 September 1983 | Submits Response to NRC 830901 Request Re Independent Review of Project Mgt Rept GA-C17173.List of Refs Utilized by Vendor for Case Studies Encl | |
ML20079G184 | 13 January 1984 | Forwards Resumes for Principal Positions Noted on Organization Chart in Section IV of Ebasco 831205 Proposal Re Independent Auditor for Plan to Verify Const | Coatings Nondestructive Examination Backfit |
ML20079M896 | 20 January 1984 | Forwards Personnel Resumes Inadvertently Omitted from Re Independent Auditor for Plan to Verify Const | Nondestructive Examination Liquid penetrant |
ML20080J557 | 12 September 1983 | Responds to Re Independent Review of Zimmer Project Mgt,Forwarding List of Refs Utilized in Reaching Conclusions on Case Studies & Documents on Welder Performance,Attachments 1 & 2,respectively.W/o Attachment 2 | |
ML20082P282 | 1 March 1983 | Forwards Ad from 831017 & 24 Cincinnati Enquirer.W/O Encl | |
ML20083N237 | 17 February 1984 | FOIA Request for Four Categories of Documents Re Facility | |
ML20084R652 | 24 February 1984 | FOIA Request for Computer Printout from Sept 1980 to Present of Civil Penalty Info on 27 Listed Nuclear Facilities.Sample Format Encl | |
ML20102A164 | 22 September 1983 | Forwards 830928 Presentation to Commissioners on Independent Review of Project Mgt | |
ML20102A195 | 16 November 1983 | Responds to 831101 Request for Comments Re Util Course of Action Presented at 831101 Meeting.Util Responded to All Detailed Recommendations.Many Responses Broad in Scope & Detailed Intent Cannot Be Judged | |
ML20112H810 | 5 April 1984 | FOIA Request for Repts Resulting from Listed Environ Qualification of Equipment Site Audits to Be Placed in Pdr. Access to Any Repts Resulting from Audits Held Since Oct 1982 Also Requested | |
ML20114A358 | 30 December 1983 | Forwards Author to Gf Cole Re Independent Audit of Program to Verify Quality of Const & Continuation of Const Plan.Portions Deleted | |
ML20126A813 | 30 January 1980 | Requests Facility Exemption from Examination of Reactor Coolant Makeup Sys Components Under LOCA Conditions,As Described in GE Document 22A2756,Revision 2 | |
ML20235A125 | 16 December 1987 | Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs | |
ML20235B623 | 29 June 1970 | Requests Listed Addl Info Re PSAR for Plant,Including Description of Structure Supported,Dimensions of Foundation Element,Including Length of Pile or Caissons & Depth Driven or Drilled | Safe Shutdown Operating Basis Earthquake Design basis earthquake Earthquake |
ML20235B679 | 4 May 1971 | Forwards Draft Adequacy of Structural Criteria for Wh Zimmer Power Station. Rept Calls Attention to Matters Which Must Be Clarified Before Finalizing Rept | |
ML20235D079 | 7 September 1971 | Forwards Adequacy of Structural Criteria for Wh Zimmer Nuclear Power Station, Final Rept | |
ML20235E451 | 16 July 1971 | Forwards Suppl to 710504 Draft Rept & Requests Listed Addl Info Re Plant.Suppl Presents More Detailed Assessment of Factors Relating to Evaluation of Adequacy of Foundations | |
ML20235E521 | 12 August 1971 | Forwards Revised Draft Adequacy of Structural Criteria for Plant. Two Topics Found in Rept Which Need follow-on Attention | |
ML20235E579 | 12 August 1971 | Confirms That Questions Described in 710716 Special Rept Have Been Resolved Satisfactorily & Resolution of Problems Described in Detail in Final Rept on Facility | |
ML20235E623 | 24 August 1971 | Forwards Revised Draft, Adequacy of Structural Criteria for Wh Zimmer Nuclear Power Station | |
ML20235E669 | 7 September 1971 | Forwards Adequacy of Structural Criteria for Wh Zimmer Nuclear Power Station, Final Rept |