Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-75-197, Letters Regarding an Interim Report Concerning a Crack Discovered in the East Wall of the Refueling Canal of Unit 1 and Requesting an Extension of Time for Submission of Reports on Refueling Wall Crack and Failure of Square D ... | 28 April 1975 | Letters Regarding an Interim Report Concerning a Crack Discovered in the East Wall of the Refueling Canal of Unit 1 and Requesting an Extension of Time for Submission of Reports on Refueling Wall Crack and Failure of Square D ... | |
L-75-388, Letter Regarding the Construction Incident Report (Final) Steam Generator 1B1 Primary Head Clad | 5 August 1975 | Letter Regarding the Construction Incident Report (Final) Steam Generator 1B1 Primary Head Clad | |
L-75-426, Letter Regarding a Reportable Incident Under 10 CFR 50.55(e) Relating to a Split Flange on Intake Cooling Water Line and Requesting Postponement of This Report Until October 6, 1975 | 9 September 1975 | Letter Regarding a Reportable Incident Under 10 CFR 50.55(e) Relating to a Split Flange on Intake Cooling Water Line and Requesting Postponement of This Report Until October 6, 1975 | |
ML072330475 | 14 August 2007 | Rosemount 1154 Pressure Transmitter Calibration Problem | |
ML090761188 | 11 March 2009 | Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs | |
ML092390043 | 25 August 2009 | Notification of Potential Part 21 Report Due to Radiation Monitor Defect | |
ML093430140 | 2 December 2009 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 1OCFR21-0098, Rev. 0, Amot Thermostatic Valve Element, P/N: 9760X | |
ML12066A118 | 2 March 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12094A371 | 2 April 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12097A316 | 2 March 2012 | Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition | |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML13246A087 | 23 August 2013 | Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification | |
ML14069A467 | 26 February 2014 | Part 21 Report Involving a Potential Manufacturing Defect in Replacement Masterpact Cradles | |
ML14079A028 | 13 March 2014 | Part 21 - Allen Bradley Type 700RTC Relay Spuriously De-Energizing | Unanalyzed Condition |
ML14107A161 | 9 April 2014 | Qualtech Np Response to 10CFR Part 21 Notification on Allen Bradley Timing Relays, Event # 49911, Docket No. 99901414 | |
ML15089A436 | 21 March 2015 | Part-21 Report - Valve Seat Leakage Defect | |
ML15134A016 | 1 May 2015 | Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays | |
ML15243A174 | 25 August 2015 | Part 21 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B | |
ML16252A274 | 29 August 2016 | Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17192A265 | 30 June 2017 | Areva Np, Inc. - Closure of Interim Report of an Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2) | |
ML17325B022 | 17 November 2017 | Fisher Controls International LLC Information Notice (FIN) 2017-05 | |
ML18263A281 | 20 September 2018 | (Waterford 3) - Part 21 Report of Westinghouse 7300 Circuit Card Increased Failure Rate | Ultimate heat sink |
ML19080A059 | 8 March 2019 | Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors | |
ML19317D093 | 25 October 2019 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing | |
W3F1-2014-0026, Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation | 11 April 2014 | Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation | |
W3F1-2014-0042, Part 21 Report of Pneumatic Valve Actuator Reverse Action | 9 July 2014 | Part 21 Report of Pneumatic Valve Actuator Reverse Action | |
W3F1-2014-0069, Part 21 Report of Time-Delay Relay Failure | 12 November 2014 | Part 21 Report of Time-Delay Relay Failure |