Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20083Q039 | 17 January 1973 | Ao:On 721229,electromatic Relief Valve Failed to Reset Causing Primary Sys Blowdown Following Reactor Scram.As Result,Three Different Valves Failed to Operate in Intended Manner.Manufacturers & Valve Users Will Be Consulted | Breakaway torque |
ML20084A090 | 29 October 1973 | Ao:On 730915,following Investigation of Excess Letdown Line Leak,Valve 1MOV-1299 Downstream Seat Protruded from Valve Body & Crack Discovered in Upper Portion of Downstream Seat Ring.Cause Unknown.Vendor Notified of Valve Problem | |
ML20084B712 | 26 June 1972 | Ao:On 720524,essential Svc Motor Generator Set Failed Resulting in Feedwater Control Sys Failure & Reactor Scram. Caused by Dirty Contacts on 2K Relay.Hfa Relay Replaced | |
ML20084C557 | 4 October 1974 | AO 50-219/74-48:on 740925,isolation Condensers a & B Inoperable Due to High Flow as Sensed by Condensate Line Break Sensors.Caused by Tripping of Line Break Sensors Due to Effects of Rated Recirculation Flow | |
ML20084C580 | 30 September 1974 | Preliminary AO 50-219/74-48:on 740927,main Steam Line Low Pressure Switch RE23A Found to Trip at Pressure Less than Min of 860 Psig.Caused by Switch Repeatability.Ge Submitted Info to Reduce Setpoint | Fuel cladding |
ML20084C786 | 26 August 1974 | Preliminary AO 50-219/74/45:on 740824,commitment to Follow MAPLHGR Limits Violated.Caused by Insufficient Guidance. Reactor Power Reduced by Recirculation Flow to Point Where No MAPLHGR Limits Violated | |
ML20084D239 | 12 April 1974 | Preliminary AO 50-219/74/26:on 740412,emergency Svc Water Pump 52C Failed to Start.Cause Under Investigation | |
ML20084E851 | 5 October 1970 | Telecopy Ao:On 701004,gape Valve 852B Only Opened Halfway. Caused by Loose Stem Nut of Limitorque Operator.Nut Replaced | |
ML20084E863 | 14 October 1970 | Telecopy Message of Ao:On 701014,gate Valve 851A Failed to Fully Close.Caused by Loose Stem Nut Locking.Lock Tightened & Stem Lubricated | |
ML20084T882 | 15 June 1970 | Ao:On 700605,turbine electro-hydraulic Control Sys Transient Caused Turbine Trip & Reactor Scram,Followed by Inadvertently Opened Safety Valves.Two Safety Valves Failed to Close,Releasing Primary Coolant to Containment | |
ML20084U950 | 2 January 1975 | AO 50-265/74-29:on 741223,cracks at Welds in 4 Inch Reactor Recirculation Discharge Valve Bypass Lines Indicated.Cause Undetermined.Piping on a & B Loops to Be Completely Replaced | |
ML20084U956 | 23 December 1974 | Telecopy Ao:Three Weld Abnormalities Discovered on Welds in Bypass Piping Lines Around Recirculation Pump Discharge Valves.Plans Formulated to Replace Lines | |
ML20085E955 | 9 July 1975 | AO BFAO-50-260/759T:on 750709,broken Stem Found on second- Stage Pilot of Main Steam Release Valve 1.Break Point Just Under Lock Nut Above Actuating Piston.Site Inspector Advised | |
ML20085G186 | 24 October 1973 | Ao:On 730925,trip Setpoint of 152 Inches for HPCI Flow Switch DPIS 3-2353 Exceeded Tech Spec Limit.Caused by Locking Device Failing to Control Setpoint Drift.Switch Setpoint Changed & Calibr Frequency Increased | |
ML20085G188 | 26 October 1973 | AO BFAO-7327W:on 731016,setpoint of 1.8 Psid for Recirculation Jet Pump Riser Differential Pressure Switch PdIS-68-24 Exceeded Tech Spec Limit.Switch Recalibr,Tested & Frequency Increased to Once Every 2 Wks | |
ML20085G823 | 18 September 1973 | AO BFAO-739W:on 730908,fuse Blew in Power Supplying HPCI Inverter Power Supply.Caused by Generic Problem W/Inverter. Fuse Replaced & Manufacturer Making Changes to Inverter Model | |
ML20085K060 | 20 December 1973 | Ao:On 731212,w/reactor at Full Temp & Pressure,Mechanical Failure of Oil Line in HPCI Turbine Control Sys Rendered Turbine Operable.Caused by Full Circumferential Sheer Failure of Pipe Bushing.Bushing Replaced | |
ML20085K070 | 25 January 1974 | Ao:On 740117,during Operability Test on Hpci,Sys Revealed to Be Inoperable.Caused by Burrs on Cylinder Wall & Piston of Turbine Stop Valve.Burrs Removed & All Parts Thoroughly Cleaned & Inspected | |
ML20085M751 | 23 November 1973 | AO BFAO-7338W:on 731115,at 25% Power W/Msiv Closed,Rcic & HPCI Sys Failed.Caused by Movable Contact of Dc Contactor Being Hung in Arcing Horn.Contactor Repaired | Safe Shutdown Reactor Vessel Water Level |
ML20086D317 | 2 September 1975 | AO 75-018:on 750901,steam Supply Valve 13-15 Failed to Close When Control Switch Placed in Closed Position.After Repeated Attempts,Valve 13-15 Responded & Cycled Closed.Valve Stroked,Timed to Ensure Operability & Declared Inoperable | |
ML20086D367 | 25 July 1975 | Telecopy AO 75-014:on 750725,head Gasket on Gland Seal Exhaust Condenser Failed.Replacement of Failed Gasket Initiated Immediately.Condenser Repaired & HPCI Sys Tested & Verified Operable | |
ML20086D375 | 8 July 1975 | Telecopy AO 75-013:on 750707,injection Valve CS-11B Failed to Open When Control Switch Placed in Open Position.Valve Immediately Opened Manually to Full Open Position.Sys Aligned to Normal Standby Mode | |
ML20086D590 | 28 December 1972 | AO 72-16:on 721227,startup Transformer Failed,Resulting in Loss of Normal Power.Incident Under Investigation. Replacement Startup Transformer Procured & Will Be Installed in Near Future | |
ML20086D593 | 28 December 1972 | Final AO 72-16:on 721220,fan 1 on West Cooling Tower Tripped.Caused by Failure of Motor Overload Heater.Overload Heater Replaced & Fan Returned to Svc | |
ML20086D596 | 21 December 1972 | AO 72-16:on 721220,fan 1 on West Cooling Tower Tripped. Initial Investigation Showed Main Contactor Failed.Repair & Return to Normal Operation of Fan Will Be Complete Prior to 721227 | |
ML20086D603 | 5 December 1973 | AO 73-33:on 731204,pressure Switch Ps 14-44B Failed to Actuate at Required Setpoint,Resulting in Failure of B Core Spray Subsystem.Switch Reset & B Core Spray Subsystem Declared Operable | |
ML20086D611 | 3 July 1973 | Updated AO 73-19:on 730625,during RCIC Surveillance Testing to Check Auto Closure of RCIC Steam Isolation Valves 15 & 16,valve 15 Failed to Close as Required.Caused by Misalignment or Binding in Declutch Mechanism | |
ML20086D615 | 12 December 1973 | Updated AO 73-33:on 731204,pressure Switch Ps 14-44B Failed to Actuate at Required Setpoint,Resulting in Failure of B Core Spray Subsystem.Caused by Setpoint Drift.Switch Reset & B Core Spray Subsystem Declared Operable | |
ML20086D620 | 25 June 1973 | AO 73-19:on 730625,during RCIC Surveillance Testing to Check Auto Closure of RCIC Steam Isolation Valves 15 & 16,valve 15 Failed to Close as Required.Several Attempts Made to Close Valve Remotely from Control Room Panel W/No Success | |
ML20086D623 | 20 November 1973 | AO 73-32:on 731120,during Monthly HPCI Sys Pump Operability Surveillance Test,Both Gaskets on Gland Seal Exhaust Condenser Failed.Cooler Repaired & HPCI Tested & Verified Operable | |
ML20086D627 | 28 November 1973 | Updated AO 73-32:on 731120,during Monthly HPCI Sys Pump Operability Surveillance Test,Both Gaskets on Gland Seal Exhaust Condenser Failed.Caused by Overpressurization of Condenser.Cooler Repaired & HPCI Verified Operable | |
ML20086D632 | 3 July 1973 | AO 73-18:on 730625,Barton Differential Pressure Switch Sensing RCIC Steam Line High Differential Pressure Actuated Below 150 Inches of Water.Switch Immediately Reset, Functionally Tested Ten Times & Verified within Tolerance | |
ML20086D649 | 25 June 1973 | AO 73-18:on 730625,Barton Differential Pressure Switch Sensing RCIC Steam Line High Differential Pressure Actuated Below 150 Inches of Water.Switch Immediately Reset, Functionally Tested 10 Times & Verified within Tolerance | |
ML20086D656 | 21 June 1973 | Updated AO 73-17:on 730614,drywell Purge & Vent Exhaust Valve V-16-19-7A Failed to Shut.Valves V-16-19-4 & V-16-19-16 Closed,Insuring Containment Integrity.Valve Will Remain Shut Until Primary Integrity Not Required | |
ML20086D671 | 14 June 1973 | AO 73-17:on 730614,drywell Purging & Vent Exhaust Valve V-16-19-7A Failed to Shut.Valves V-16-19-4 & V-16-19-16 Closed Immediately,Insuring Containment Integrity.Valve V-16-19-7A Subsequently Shut & Air Operator Secured | |
ML20086D686 | 22 June 1973 | AO 73-16:on 730612,during Severe Electrical Storm in Which Direct Lightning Strike to Top of Plant Ventilation Stack Observed,Detonation in Offgas Sys Caused Sufficient Back Pressure to Fracture Air Ejector Rupture Disc | |
ML20086D692 | 13 June 1973 | AO 73-16:on 730612,during Severe Electrical Storm in Which Direct Lightning Strike to Top of Plant Ventilation Stack Observed,Detonation in Offgas Sys Caused Sufficient Back Pressure to Fracture Air Rejector Rupture Disc | |
ML20086D708 | 21 June 1973 | Updated AO 73-15:on 730612,first-stage Turbine Pressure Permissive Pressure Switch 5-14A Failed to Actuate at Proper Setpoint.Switch Reset.Surveillance Test Will Be Conducted Again in 3 Months Rather than 6 Months | |
ML20086D722 | 12 June 1973 | AO 73-15:on 730612,first-stage Turbine Pressure Permissive Pressure Switch 5-14A Failed to Meet Proper Setpoint.Switch Reset & Returned to Svc | |
ML20086D734 | 6 June 1973 | Updated AO 73-14:on 730530,fuse Which Supplies Ac to Main Steam Line Radiation Monitor Drawer 17-251D & High Voltage Power Supply for Reactor Bldg Ventilation Area Monitors Blew.Blown Fuse Replaced & Isolation Cleared | |
ML20086D739 | 14 November 1973 | Updated AO 73-31:on 731107,reactor Scram Occurred,Initiated by high-high Flux Signal from Intermediate Range Neutron Monitoring Sys.Rod 30-23 Fully Withdrawn & Rod 26-23 Being Withdrawn for Friction Test | |
ML20086D743 | 30 May 1973 | AO 73-14:on 730530,fuse Which Supplies Ac to Main Steam Line Radiation Monitor Drawer 17-251D & High Voltage Power Supply 17-451B for Reactor Bldg Ventilation Area Radiation Monitors Blew.Blown Fuse Replaced & Isolation Cleared | |
ML20086D749 | 31 May 1973 | AO 73-13:on 730523,RHR Svc Water Pump a Failed to Shut Down from Crp 9-3 During Surveillance Testing.Mechanical Trip Mechanism in Breaker Undependable Due to Misalignment of Mechanism & High Resistance Breaker Contact | |
ML20086D751 | 14 May 1973 | AO 73-12:on 730507:valve RHR-25A Failed to Open When Control Switch Placed in Open Position.Valve Manually Opened to Mid Position.Motor on RHR-25A Replaced & Valve Operability Demonstrated | |
ML20086D755 | 20 April 1973 | Updated AO 73-10:on 730417,relief Valve Initiation Time Delay Relay Failed to Actuate.Similar Event Occurred on 721020.Relay Replaced & Replacement Verified.No Further Action Necessary | |
ML20086D765 | 18 April 1973 | AO 73-10:on 730417,relief Valve Initiation Time Delay Relay Failed to Actuate.Similar Event Occurred on 721020.Relay Replaced & Replacement Verified | |
ML20086D769 | 13 April 1973 | Updated AO 73-09:on 730410,microswitch Installed in DPIS-129B Failed to Actuate at Required Setpoint.Defective Switch Replaced,Actuating Arm Realigned & Trip Point Actuation Rechecked Repeatedly | |
ML20086D775 | 10 April 1973 | AO 73-09:on 730410,microswitch Installed in DPIS-129B Failed to Actuate at Required Setpoint.Defective Switch Replaced, Actuating Arm Realigned & Trip Point Actuation Rechecked Repeatedly | |
ML20086D784 | 8 March 1973 | Updated AO 73-08:on 730307,time Delay Relay Failed to Actuate Isolation of Sys within Specified Time.Check of Timer Will Be Conducted After 3 Months to Confirm Reliability of Timer.Relay Replaced & Bench Tested | |
ML20086D792 | 8 March 1973 | AO 73-08:on 730307,time Delay Relay Failed to Actuate Isolation of Sys within Specified Time.Relay Replaced & Tested |