05000400/FIN-2007003-02Licensee-Identified Violation
05000400/FIN-2007402-01Administration of NRC Required Annual Written Security RE-QUALIFICATION Testing
05000400/FIN-2007402-02Administration of NRC Required Annual Plant Access, Radiation Worker and Respiratory Protection Training Testing.
05000400/FIN-2008002-01Licensee-Identified Violation
05000400/FIN-2008003-01Failure to Properly Categorize Maintenance Rule Functional Failures
05000400/FIN-2008003-02Licensee-Identified Violation
05000400/FIN-2008004-01Failure to Maintain Control Over the Station\'s Very High Radiation AreasHigh Radiation Area
05000400/FIN-2008005-01Failure to monitor effluent releases from SFP filter backwash
05000400/FIN-2008006-01Failure to Use Appropriate Acceptance Criteria for Testing Check Valves 1SW-9 and 10
05000400/FIN-2008006-02Failure to Correctly Translate Design Requirements Into Plant Construction Details of Masonry Block Walls
05000400/FIN-2008008-01Sprinkler System in Cable Spreading Room A Does Not Meet Licensee\'s Fire Protection Program RequirementsSafe Shutdown
Continuous fire watch
Fire Protection Program
05000400/FIN-2008008-02Post-Fire Safe Shutdown From Outside the Main Control Room (Alternative Shutdown)Safe Shutdown
Enforcement Discretion
05000400/FIN-2009003-01Review the Cooling Tower Blowdown Line Pathway Dose Compared to Doses from all other pathwaysOffsite Dose Calculation Manual
05000400/FIN-2009003-02Failure to Provide Procedures to Control and Adjust the Manipulator Crane Gear Limit SetpointsFuel cladding
05000400/FIN-2009003-03Licensee-Identified ViolationHigh Radiation Area
Scaffolding
05000400/FIN-2009003-04Licensee-Identified ViolationSignificance Determination Process
05000400/FIN-2009004-01Failure to Maintain an Adequate Quality Assurance Training Program
05000400/FIN-2009005-01Failure to Properly Install Spot Type Smoke DetectorsFire Protection Program
05000400/FIN-2009005-02A ESW Pump Power Supply Cables Submerged in Water
05000400/FIN-2009006-01Failure to Preclude Repetition of a Significant Condition Adverse to Quality for Both Containment Spray Additive System Eductors Being Outside of the Technical Specification Flow BandCondition Adverse to Quality
05000400/FIN-2009006-02Failure to Correct a Condition Adverse to Quality Involving a Main Steam Isolation Valve Degrading Trend Before Valve FailureStroke time
Condition Adverse to Quality
05000400/FIN-2009006-03Unresolved Item Associated with the Evaluation of the Failure of Emergency Service Water Valve FailureSafe Shutdown
05000400/FIN-2009201-01Security
05000400/FIN-2009201-02Security
05000400/FIN-2009201-03Security
05000400/FIN-2010002-01Failure to Submit a Licensee Event Report for a Condition Prohibited by Technical Specifications Associated with the B Emergency Service Water Discharge ValveSignificance Determination Process
05000400/FIN-2010002-02Failure to Promptly Evaluate Operating Experience and Identify Potential Steam Voiding as a Condition Adverse to QualityCondition Adverse to Quality
Significance Determination Process
05000400/FIN-2010002-03A ESW Pump Power Supply Cables Submerged in WaterSignificance Determination Process
05000400/FIN-2010003-01Failure to Follow Procedure to Install the Load Block 5 Auxiliary RelaySignificance Determination Process
05000400/FIN-2010003-02Reactor Trip due to Failing to Properly Assemble an Oil Filter in the Hydrogen Seal Oil SystemSignificance Determination Process
05000400/FIN-2010005-01Failure to Properly Implement Procedural Guidance to Maintain the FHBEES BoundarySignificance Determination Process
Inattentive
05000400/FIN-2010005-02Failure to Follow Procedure Results in Emergency Safeguards Sequencer Actuation and Safety Injection Signal (SIS) while the Plant was in Mode 6Significance Determination Process
05000400/FIN-2010005-03Failure to comply with the limiting conditions for operation, while the Refueling Water Storage Tank was aligned to the non-seismically qualified Fuel Pool Purification System
05000400/FIN-2010005-04Inadequate Post Maintenance Test Procedure Results in Deenergization of the B Safety Bus and Loss of Decay Heat RemovalTime to boil
Significance Determination Process
05000400/FIN-2010005-05Failure to Follow Procedure to Properly Align the MOC Switch Contacts Associated With Breaker 1A-6 Results in Actuation of the B MDAFW PumpSignificance Determination Process
05000400/FIN-2010005-06Inadequate Procedural Guidance to Properly Lift/Land LeadsSignificance Determination Process
05000400/FIN-2010005-07Licensee-Identified ViolationProbabilistic Risk Assessment
Significance Determination Process
05000400/FIN-2010402-01Security
05000400/FIN-2010405-01Security
05000400/FIN-2010405-02Security
05000400/FIN-2011003-01Offsite Power Supply Cables Submerged in Water
05000400/FIN-2011003-02Inadequate Procedure for Identifying Accumulated Gas in ECCS SystemsSignificance Determination Process
05000400/FIN-2011004-01Inadvertent Actuation of Turbine Driven Auxiliary Feedwater Pump Caused by Inadequate ProcedureSignificance Determination Process
05000400/FIN-2011004-02Failure to Periodically Calibrate Radiation Monitors.Significance Determination Process
05000400/FIN-2011008-01Failure to Report Required Information Related to MSIV Failure
05000400/FIN-2011008-02Inadequate Control of Degraded Voltage Time Delay Settings Two Examples
05000400/FIN-2011008-03Failure to Maintain Environmental Qualification on Steam Generator Power Operated Relief Valves
05000400/FIN-2011008-04Non-conservative Calculations for Motor Control Center Control Circuit Voltage
05000400/FIN-2011008-05Failure to Control Design Limits for ESCW Flow Balancing
05000400/FIN-2011008-06Failure to Extend the Design Life for Molded-Case Circuit Breakers