Finding | |
---|---|
Title | Failure to Properly Implement Procedural Guidance to Maintain the FHBEES Boundary |
Description | The inspectors identified a Green NCV of Technical Specification (TS) 6.8.1, Procedures, for the licensees failure to properly implement procedural guidance to maintain the Fuel Handling Building Emergency Exhaust System (FHBEES) boundary. Specifically, the licensee failed to properly implement procedural guidance to maintain the FHBEES boundary while two doors were propped open on October 21, 2010 and October 22, 2010. This was apparent when the inspectors identified one individual unaware of their responsibilities and another individual inattentive. The licensee entered this issue into their CAP as action request (AR) #428580 and AR #428858. The licensee took corrective action to relieve the inattentive individual and conducted additional training for all of the other individuals responsible for closing the doors. The failure to properly implement procedural guidance to maintain the FHBEES boundary while two doors were propped open from October 21, 2010 until October 22, 2010 was a performance deficiency. The performance deficiency was more than minor because it was associated with the Barrier Performance attribute of the Barrier Integrity cornerstone and affected the cornerstone objective to provide reasonable assurance that physical design barriers protect the public from radionuclide releases caused by accidents or events. The potential safety consequence is that if spent fuel had been damaged in the spent fuel pool during this time, the FHBEES may not have been able to properly filter and monitor a radioactive release. Using IMC 0609, Significance Determination Process, Phase 1 Worksheet, the inspectors determined this issue to be of very low safety significance because it only represented a degradation of the radiological barrier function provided for the fuel handling building. The finding has a cross-cutting aspect of Training and Work Hours, as described in the Resources component of the Human Performance crosscutting area because the licensee did not effectively train the individuals regarding their procedural responsibilities when the FHBEES doors were propped open (H.2(b)). |
Site: | Harris |
---|---|
Report | IR 05000400/2010005 Section 1R04 |
Date counted | Dec 31, 2010 (2010Q4) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.04 |
Inspectors (proximate) | R Kellner A Nielsen J Rivera-Ortiz R Hamilton W Loo J Austin M Bates S Walker R Musser D Mas-Penaranda M Coursey P Lessard J Eargle N Childs |
CCA | H.9, Training |
INPO aspect | CL.4 |
' | |