Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
L-96-003, License Amendment Request: Adoption of GL 96-03, Relocation of the Pressure Temperature Limit Curves and Low Temperature Overpressure Protection System Limits and TSTF-419-A, Rev. 0, Revise PTLR Definition.15 September 2005OconeeLicense Amendment Request: Adoption of GL 96-03, Relocation of the Pressure Temperature Limit Curves and Low Temperature Overpressure Protection System Limits and TSTF-419-A, Rev. 0, Revise PTLR Definition.
ML0231804091 November 2002OconeeProposed License Amendment Regarding Revisions to the Licensing Basis for the UFSAR Section on Water Level (Flood) Design (TSC 2002-06)
ML0231804954 November 2002OconeeTechnical Specification Bases (Tsb) Change 3.8.3 Distribution System - Operating
ML02322021411 November 2002OconeeEmergency Plan Implementing Procedures Manual Volume B, Revision 2002-10
ML02322022711 November 2002OconeeEmergency Plan Implementing Procedure Manual Volume C, Revision 2002-12
ML02323033912 November 2002OconeeLER 02-S02-00 for Oconee Nuclear Station Regarding Uncontrolled Safeguards Information
ML02323034812 November 2002OconeeSite Core Operating Limits Report
ML02323035612 November 2002OconeeEnd-of-Cycle-20 Steam Generator Tube Inspection Report on Indication of Circumferential Defects
ML02325022113 November 2002OconeeCore Operating Limits Report (COLR)
ML02325027414 November 2002OconeeLicense Amendment Request for Reactor Protective System Instrumentation Technical Specification 3.3.1, Surveillance Requirement 3.3.1.3. Technical Specification Change Number 2001-06
ML02337055321 November 2002OconeeLicense Amendment Request to Extend Completion Time for an Inoperable Low Pressure Injection Train from 72 Hours to 7 Days - Revised No Significant Hazards Consideration TS Change Number 2001-005
ML02338000826 November 2002OconeeWithdrawal of License Amendment Request for Technical Specification 3.7.16, Control Room Area Cooling System (Cracs)
ML02338002121 November 2002OconeeSupplement to License Amendment Request for Full-Scope Implementation of the Alternate Source Term Technical Specification Change (TSC) Number 2001-07
ML0234700384 December 2002OconeeLicense Amendment Request for Upper Surge Tank & Hotwell Inventory 3.7.6
ML0234703085 December 2002OconeeSteam Generator Inservice Inspection, Steam Generator Tube Plugging & Repair 30-Day Report
ML02353025116 December 2002OconeeEmergency Plan Implementing Procedures Manual Volume C, Revision 2002-13
ML02360006516 December 2002OconeeTechnical Specification Bases (Tsb) Change, Revisions to Tsbs 3.3.8, 3.5.3, & 3.6.5 to Clarify & Document Interdependency Between Reactor Building Spray (RBS) & LPI System with Respect to Pump Runout
ML02360018416 December 2002OconeeCode Relief, Third Ten Year Inservice Inspection Interval Requests for Alternative/Relief Nos. 02-009 & 02-010 Associated with Repairs Made to Unit 1 Condenser Circulating Water Pump 1B.
ML0301000107 January 2003OconeeEmergency Plan Implementing Procedure Manual Volume C Revision 2003-01
ML0301505508 January 2003OconeeRevised No Significant Hazards Consideration to Proposed License Amendment Request (LAR) to Fully Credit Standby Shutdown Facility & to Eliminate Crediting Spent Fuel Pool to High Pressure Injection System Flow Path for Tornado Mitigation L
ML03024012310 January 2003OconeeResponse to NRC Preliminary White Finding
ML03035052827 January 2003OconeeSelected Licensee Commitments Manual
ML03038034029 January 2003OconeeProposed License Amendment Request to Fully Credit the Standby Shutdown Facility and to Eliminate Crediting the Spent Fuel Pool to High Pressure Injection System Flow Path for Tornado Mitigation
ML03041014627 January 2003OconeeEmergency Plan Implementing Procedures Manual Volume B, Revision 2003-01
ML0304302976 February 2003Oconee
07200040
Registration for Use of General License Spent Fuel Cask Number 74
ML03050035913 February 2003Browns FerryTechnical Specification (TS) Change 421 - Framatome Fuel Design and Storage
ML03052030717 February 2003OconeeEmergency Plan Implementing Procedures Manual Volume C Revision 2003-02
ML03055010712 February 2003OconeeEnd-of-Cycle 19 Refueling Outage, November 2002 Steam Generator Inservice Inspection Summary Report
ML03055026010 February 2003OconeeEnd-of-Cycle 19 Refueling Outage, November 2002, Steam Generator Inservice Inspection, Steam Generator Three Month Report
ML03055048211 February 2003Browns FerryTS Change 420 - Safety Limit Minimum Critical Power Ratio - Cycle 13 Operation - Response to NRC Request for Additional Information
ML03056063917 February 2003OconeeLicense Amendment Request for Standby Shutdown Facility 3.10.1, Surveillance Requirement 3.10.1.9 TS Change Number 2002-11
ML03056067113 February 2003Browns FerryTechnical Specifications (TS) Change 421 - Framatome Fuel Design and Storage
ML03056070319 February 2003OconeeLeak-Before-Break Evaluation for Steam Generator Replacement
ML03056087919 February 2003OconeeProposed Amendment to the Renewed Facility Operating License and Technical Specifications for Steam Generator Replacement (Tscr 2002-01)
ML03059013519 February 2003OconeeResponses to Request for Additional Information Concerning Proposed License Amendment Request to Extend the Completion Time for an Inoperable Low Pressure Injection Train from 72 Hours to 7 Days, License Amendment Request No. 2001-012
ML03064067426 February 2003Oconee
07200040
ISFSI Registration for Use of General License Spent Fuel Cask Number 75
ML03064070024 February 2003OconeeSchedule Change for Keowee Digital Governor Modification
ML03065071625 February 2003OconeeSpecial Report Per Technical Specification 5.6.6., Problem Investigation Process No.: 0-03-0154, 0-03-0415
ML03065094824 February 2003OconeeInservice Inspection Summary Report for Class CC Component Examination End of Cycle 19 Outage
ML03083020217 March 2003OconeeEmergency Plan Implementing Procedure Manual Volume C Revision 2003-03
ML03092067620 March 2003OconeeDefense in Depth & Diversity Assessment Associated with Digital Upgrade of Reactor Protective System & Engineered Safeguards Protective System
ML03098067928 March 2003OconeeCommitment Change Annual Report
ML03112060010 April 2003OconeeLicense Amendment Request, Low Temperature Overpressure Protection System 3.4.12, Surveillance Requirements 3.4.12.5 & 3.4.12.7, Technical Specification Change Number 2002-09
ML03114037114 April 2003OconeeResponse to NRC Request for Additional Information Associated with License Amendment Request for Reactor Protective System Instrumentation TS 3.3.1, Surveillance Requirement 3.3.1.3
ML03115000221 April 2003OconeeEmergency Plan Implementing Procedures Manual Volume B, Revision 2003-02
ML03122031024 April 2003OconeeSite 2002 Annual Radioactive Effluent Release Report
ML03126021030 April 2003OconeeEmergency Plan Implementing Procedures Manual Volume C Revision 2003-04
ML03126045624 April 2003OconeeRevision to the 2001 Annual Effluent Release Report
ML03126058529 April 2003OconeeInservice Testing (IST) Program Fourth 10 Year Inspection Interval Response to Request for Additional Information
ML03127045429 April 2003OconeeClarification Regarding Emergency Feedwater Safety Evaluation Dated June 11, 2002 Oconee UFSAR Section 10.4.7