ML030980679

From kanterella
Jump to navigation Jump to search
Commitment Change Annual Report
ML030980679
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/28/2003
From: Rosalyn Jones
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML030980679 (3)


Text

ADuke R. A JONES NSPowere Vice President A Duke Energy Company Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax March 28, 2003 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:Document Control Desk

Subject:

Duke Energy Corporation Oconee Nuclear Station, Units 1 , 2 and 3 Docket Nos. 50-269, 50-270, 50-287 Commitment Change Annual Report Attached is a summary report for Oconee commitment changes made for the last annual reporting period. These changes were made per the guidance defined in NEI 99-04. The changes to these commitments have no adverse effect on compliance with NRC rules and regulations.

If there are any questions, please contact Judy E Smith @ 864-885-4309.

Very yours, R. Jones, Site Vice President Attachment AC)OI www duke-energy corn

U. S. Nuclear Regulatory Commission March 28, 2003 Page 2 xc:

L. A. Reyes, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 L. N. Olshan (addressee only)

NRC Senior Project Manager (MNS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 NRC Senior Resident Inspector Oconee Nuclear Station

NRC Number Source Document Onginal Commitment Modified Commitment Notification Required Yes 2002-0-001 ONS ISI plan I n response to PSC 21-82, Modified the commitment to state: Category G06 exams are deleted from the "Water Hammer Concern in ONS ISI plan.

Auxiliary Feedwater Heaters,"

ONS added category G06 exams to the ONS ISI plan.