License Amendment Request to Extend Completion Time for an Inoperable Low Pressure Injection Train from 72 Hours to 7 Days - Revised No Significant Hazards Consideration TS Change Number 2001-005
ML023370553
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/21/2002
From: Rosalyn Jones
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML023370553 (6)


Text

SDuke R. A.JONES Power vice President A Duke Energy Company Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax November 21, 2002 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Oconee Nuclear Station, Units 1, 2, and 3 Docket Numbers 50-269, 50-270, and 50-287 License Amendment Request to Extend the Completion Time for an Inoperable Low Pressure Injection Train from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days Revised No Significant Hazards Consideration Technical Specification Change Number 2001-005 Pursuant to a November 18, 2002 telephone call between Mr. Lenny Olshan of the Nuclear Regulatory Commission and Mr. Stephen Newman of Duke Energy Corporation (Duke), Duke is replacing in its entirety, the responses to the No Significant Hazards Consideration submitted with the original October 24, 2002 license amendment change request with the revised responses given in the Attachment to this letter. The purpose of this change is to incorporate the No Significant Hazards Consideration guidance information found in Technical Specification Task Force Change Traveler (TSTF) 430, "AOT Extension to 7 days for LPI and Containment Spray (BAW-2295-A, Rev. 1)."

Inquiries on this amendment request change should be directed to Stephen C. Newman of the Oconee Regulatory Compliance Group at (864) 885-4388.

Very tru ours, R. . nes, Vice President 0 onee Nuclear Site www. duke-energy. corn

Nuclear Regulatory Commission License Amendment Request No. 2001-005 November 21,2002 Page 2 cc: w/attachment Mr. L. N. Olshan, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. L. A. Reyes, Regional Administrator U. S. Nuclear Regulatory Commission - Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. M. C. Shannon Senior Resident Inspector Oconee Nuclear Station Mr. Virgil R. Autry, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Department of Health & Environmental Control 2600 Bull Street Columbia, SC 29201

Nuclear Regulatory Commission License Amendment Request No. 2001-005 November 21, 2002 Page 3 R. A. Jones, being duly sworn, states that he is Vice President, Oconee Nuclear Site, Duke Energy Corporation, that he is authorized on the part of said Company to sign and file with the U. S. Nuclear Regulatory Commission this revision to the Facility Operating License Nos. DPR-38, DPR-47, and DPR-55, for Oconee Units 1, 2, and 3 respectively, and that all the statements and matters set forth herein including those from the original license amendment request are true and correct to the best of his knowledge.

R. A. Joe* c ident

Pre Oconee Nuclear Site Subscribed and sworn to before me this 2,1 day of 4Lky 2002 Not ry Public My Commission Expires

qZ j.9, my COMiss!ofn ExWires Aug.

Nuclear Regulatory Commission License Amendment Request No. 2001-005 November 21,2002 Page 4 bcc: w/attachment B. H. Hamilton D. Baxter W. W. Foster M. S. Kitlan, Jr.

H. D. Brewer J. A. Patterson L. F. Vaughn L. E. Nicholson S. C. Newman C. J. Thomas - MNS G. D. Gilbert - CNS NSRB, EC05N ELL, ECO50 File - T.S. Working BWOG Tech Spec Committee (5)

ONS Document Management

ATTACHMENT NO SIGNIFICANT HAZARDS CONSIDERATION (Revised)

Nuclear Regulatory Commission License Amendment Request No. 2001-005 No Significant Hazards Consideration October 24, 2002 Page 2 Pursuant to 10 CFR 50.91, Duke Energy Corporation (Duke) has made the determination that this amendment request involves a No Significant Hazards Consideration by applying the standards established by the NRC regulations in 10 CFR 50.92. The specific responses to the criterion are discussed below:

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed change allows for one train of Low Pressure Injection to be inoperable for up to 7 days. The Low Pressure Injection system is not an initiator for any accident previously evaluated and the consequences of an event during the extended Completion Time are no more severe than the consequences of the same event during the current Completion Time. Therefore, the consequences of an event previously analyzed are not increased. Consequently, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The proposed change allows for one train of Low Pressure Injection to be inoperable for up to 7 days. The proposed change does not involve a physical alteration of the plant (no new or different type of equipment will be installed) or a change in the methods governing normal plant operation. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.

3. Does the proposed change involve a significant reduction in the margin of safety?

Response: No.

The proposed change allows for one train of Low Pressure Injection to be inoperable for up to 7 days. An evaluation presented in Topical Report BAW-2295 and accepted by the NRC concluded that the extended Completion Time did not result in a significant reduction in the margin of safety. Therefore, the proposed change does not involve a significant reduction in the margin of safety.