Emergency Plan Implementing Procedures Manual Volume B, Revision 2003-02
ML031150002
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/21/2003
From: Rosalyn Jones
Duke Power Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML031150002 (13)


Text

Duke R AJONES

  • rPower. Vice President A Duke Energy Company Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 April 21, 2003 864 885 3564 fax U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Oconee Nuclear Station Docket Nos. 50-269, -270, -287 Emergency Plan Implementing Procedures Manual Volume B, Revision 2003-02 Please find attached for your use and review copies of the revision to the Oconee Nuclear Station Emergency Plan:

Volume B Revision 2003-02 April 2003 This revision is being submitted in accordance with 10 CFR 50-54(q) and does not decrease the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures.

Any questions or concerns pertaining to this revision please call Rodney Brown, Emergency Planning Manager at 864-885-3301.

By copy of this letter, two copies of this revision are being provided to the NRC, Region II, Atlanta, Georgia.

Very truly yours, VP, Oconee Nuclear Site xc: (w/2 copies of attachments)

Mr. Luis Reyes, Regional Administrator, Region II U. S. Nuclear Regulatory Commission 61 Forsyth St., SW, Suite 24T23 Atlanta, Georgia 30303 w/copy of attachments Mr. James R. Hall Rockville, Maryland (w/o Attachments, Oconee Nuclear Station)

NRC Resident Inspector M. D. Thorne, Manager, Emergency Planning 4a45 www duke-energy corn

April 21, 2003 OCONEE NUCLEAR SITE

SUBJECT:

Emergency Plan Implementing Procedures Volume B, Revision 2003-02 Please make the following changes to the Emergency Plan, Volume B by following these instructions.

REMOVE ADD Cover Sheet Rev. 2003-01 Cover Sheet Rev. 2003-02 Table of Contents, Table of Contents page 1, 2, 3 & 4 page 1, 2, 3 & 4 Maintenance Directive 9.2 - 03/31/03 WPG 1.5- 03/31/2003 Deleted Emergency Plan for Work Control Group NOTE: Tab for WPG 1.5 is not available at this time

DUKE POWER EMERGENCY PLAN IMPLEMENTING PROCEDURES VOLUME B APPROVED:

W. W. Foster, Manager Safety Assurance 04122/03 Date Approved 04/22/03 Effective Date VOLUME B REVISION 2003-02 APRIL 2003

VOLUME B TABLE OF CONTENTS Chemistry Lab Determination Of Boron By Manual Colorimetric Titration 11/06/02 LM-O-PO03C Chemistry Lab Boron Analysis by Mettler DL 58 Boron Titration 10/28/02 LM-O-P919 CP/1/A/2002/004C Operating Procedure For The Post Accident Liquid Sampling 01/10/03 System (PALSS)

CP/1&2/A/2002/005 Post Accident Caustic Injection Into The Low Pressure 07/24/02 Injection System CP/2/A/2002/004C Operating Procedure For The Post Accident Liquid Sampling 01/10/03 System (PALSS)

CP/3/A/2002/004C Operation Procedure For The Post-Accident Liquid Sampling 01/10/03 System (PALSS)

CP/3/A/2002/005 Post Accident Caustic Injection Into The Low Pressure 07/24/02 Injection System HP/0/B/1009/009 Procedure For Determining The Inplant Airborne Radioiodine 12/03/97 Concentration During Accident Conditions HP/0/B/1009/012 Distribution Of Potassium Iodide Tablets In The Event Of A 01/09/01 Radioiodine Release HP/0/B/1009/015 Procedure For Sampling And Quantifying High Level 07/23/01 Gaseous Radioiodine And Particulate Radioactivity HP/0/B/1009/016 Procedure For Emergency Decontamination Of Personnel 12/29/97 And Vehicles On-Site And From Off-Site Remote Assembly Area HP/1/A/1009/017 Operating Procedure For Post-Accident Containment Air 09/13/00 Sampling System HP/2/A/1009/017 Operating Procedure For Post-Accident Containment Air 09/13/00 Sampling System HP/3/A/1009/017 Operating Procedure For Post-Accident Containment Air 09/13/00 Sampling System RP/0/B/1000/0 1I Planned Emergency Exposure 02/01/94 RP/0/B/1000/025 Operational Support Center Manager Procedure 11/21/02 RP/0/B/1000/027 Re-Entry Recovery Procedure 05/30/00 Revision 2003-02 April 2003 I

VOLUME B TABLE OF CONTENTS Chemistry Manual Emergency Response Guidelines 07/29/02 5.1 Chemistry Manual Post Accident Procedure Use Guidelines 09/25/02 5.2 Maintenance Emergency Preparedness Plan Activation 08/06/02 Directive 9.1 Emergency Plan for Work Control Group 03/31/03 WPG 1.5 I OMP 1-7 Operations Emergency Response Organization 08/31/00 Radiation Protection Radiation Protection Emergency Response 09/01/98 Manual 11.1 Radiation Protection Radiation Protection Site Assembly 06/05/00 Manual 11.4 Safety Services Safety Services Emergency Response Procedure 2.1 03/14/00 Procedure 2.1 Revision 2003-02 April 2003 2

Volume B Table Of Contents DELETED PROCEDURES CP/0/A/2003/02B Determination of Failed Fuel - (04/03/86) DELETED CP/O/A/2004/02A Post Accident Determination of Boron Concentration Using the Orion Fluoroborate Electrode - (03/28/85) DELETED CP/0/A/2004/02F Determination of Boron for High pH Samples Following Caustic

- (12/12/94) - DELETED CP/0/A/2004/09D Post Accident Determination of PH - (03/28/85) DELETED CP/O/A/2004/037 Determination of Boron by Manual Colorometric Titration Using Phenolpthaline Indicator- (12/12/94) DELETED CP/O/A/2005/2D Post Accident Determination of Gamma Isotopic Activity - (07/09/82)

DELETED CP/0/B/2001/05A Post Accident Analytical Procedure Guidelines- (06/14/85)

DELETED CP/0/B/2005/09 Determination of Failed Fuel - (10/05/90) DELETED CP/0/B/4003/01 Procedure for Environmental Surveillance Following a Large Unplanned Release of Gaseous Radioactivity - (07/25/85)

DELETED CP/O/B/4003/02 The Determination of Plume Direction and Sector(s) to be Monitored Following a Large Unplanned Release of Gaseous Activity DELETED HP/0/B/1009/10 Procedure for Quantifying Gaseous Releases Through Steam Relief Valves Under Post-Accident Conditions - (10/30/85) DELETED HP/0/B/1009/11 Projection of Offsite Dose from the Uncontrolled Release of Radioactive Materials Through a Unit Vent - (05/24/85) DELETED HP/0/B/1009/14 Project Offsite Dose from Releases other than Through a Vent -

(02/12/85) DELETED IP/0/A/0050/001 Procedure to Provide Emergency Power to an HPI Pump Motor from the ASW Switchgear- (10/05/92) DELETED IP/0/B/0050/004 Emergency Power - Telephone System - (03/30/87) DELETED DTA-I Site Assembly (ESS - Maintenance Division) - (11/07/95)

DELETED DTA-2 Station Support During a Site Assembly - (03/26/92) DELETED Integrated Sched. Integrated Scheduling Group Directive 6.0 - (10/26/89) DELETED 3

Volume B Table Of Contents DELETED PROCEDURES STA SVCS. 3.1.6 Industrial Safety, Health, and/Fire Protection Section - (09/18/89)

DELETED Commodities & Facilities Site Assembly CF 1 (11/01/94) - DELETED CF 1-10 Commodities & Facilities Station Support During a Site Assembly Functional Area Directive 102 Functional Area Directive 102 - (07/14/97) - DELETED from Volume B, moved to Volume C on 06/15/98 Rev. 98-04 LM-O-PO03A Determination of Boron Using The Mettler DL40GP - 06/18/98 -

DELETED Maintenance Directive 9.2 Emergency Plan For Members Of The Work Control Group 04/07/03 DELETED Revision 2003-02 April 2003 4

I;NUMLAIYUW ONLY kDuke

'Power. OCONEE NUCLEAR STATION WORK PROCESS GUIDELINE A Duke Energy Compmy 1.

WPG 1.5 Emergency Plan for Work Control Group

- - T Revision Number Issue Date 0 03131/2003 I I Approved by / Date: Approved by / Date: Approved by / Date:

Richard Ledford / 3/24/03 Z T Taylor / 3/25/03 Charles W Bovd/3/25/03 Work Control Coordinator Programmatic Support Manager Work Control Superintendent Effective Date Effective Date Effective Date 03131/2003 03/31/2003 03/31/2003

.1 I Issued by: RH Ledford

Title:

Work Control Coordinator 04/16/03

WPG 1.5, Emergency Plan for Work Control Group, Rev.0 DOCUMENT REVISION DESCRIPTION REVISION NO. PAGES or SECTIONS REVISED AND DESCRIPTION Rev.0 Initial distribution effective, previously MD 9.2. Revised title, added reference to NSD 117, added additional detail for Evacuation Coord responsibilities in Section 5.0, (I a,b,c) and (5).

04/16/03 ii

WPG 1.5, Emergency Plan for Work Control Group, Rev.0 OCONEE NUCLEAR STATION WORK PROCESS GUIDELINE WPG 1.5 Emergency Plan for Work Control Organization Note: Copies of all changes to this WPG must be forwarded to the Emergency Planning Group within 7 working days of approval.

1.0 Purpose

The purpose of this directive is to provide Emergency Plan response instructions to Work Control Group employees in the event of a station emergency or drill.

2.0

References:

1. NSD 114, Site Assembly/Evacuation
2. NSD 117, Emergency Response Organization, Staffing, Training, and Responsibilities
3. Oconee Response Procedures RP/OIB/1000/10, RP/01B/1000/19, and RP/O/B/1000/25 3.0 Site Assembly When a Site Assembly occurs, all members of and visitors to the Work Control Group, with the exception of the Work Control Emergency Response Organization, will report immediately to their Work Control offices for accountability. Work Control personnel shall swipe their security badges in the card reader in their designated areas. Members of the Work Control (WC)

Emergency Response Organization will report attendance and report to their assigned response positions.

Work Control personnel inside the protected area who cannot reach their assembly area within 30 minutes of Site Assembly shall call their supervisor immediately for accountability and proceed to their card reader and swipe their badges as soon as possible. If an individual is at the Oconee Complex, Oconee Office Building, or Operations Training Center when the assembly horn sounds, it is acceptable to telephone their supervisor to report accountability.

During scheduled day-shift working hours (normally 7:00 to 17:30 Monday to Thursday), each Work Control Manager/designee and supervisor are responsible for accounting for their respective employees and reporting to the Work Control Group Admin or designee within 10 minutes of Site Assembly initiation. The information provided to the WC Group Admin should include the number of people accounted for, the number unaccounted for, and the names of any missing.

04116/03 I

WPG 1.5, Emergency Plan for Work Control Group, Rev.O The WC Group Admin will in turn compile an "unaccounted for" number (not names) for Work Control which MUST be reported to Security, ext. 5050, within 20 minutes of the Site

> Assembly. Security will follow-up with the WC Group Admin later to gather the names of missing individuals to initiate a search. Attention should be given to possible visitors from the General Office or other off-site affiliations.

Should a site assembly occur after normal working hours, Work Control employees shall report to their assigned assembly area. If a Work Control supervisor/manager is present, the supervisor/manager will call Security, ext. 5050, and report accountability. If no Work Control supervisor/manager is present, the employee(s) will call directly to Security, ext. 5050, and report accountability within 20 minutes of the Site Assembly.

4.0 Work Control Emergency Response Organization 4.1 General Information:

1. Work Control Emergency Response personnel will be notified after normal working hours via Emergency Pager or Community Alert Network (CAN) emergency telephone notification system. The CAN message will be either BLUE ECHO for an actual emergency condition or BLUE DELTA for a drill. To respond to the CAN phone notification, enter the system password of "1,2,3,4", then answer the questions by pressing "6" for No, "9"for Yes.
2. Personnel listed on the emergency weekly duty roster must be "fit for duty" for the period of time they are assigned the pager for their area of responsibility. Being fit for duty is not construed to mean total abstinence. Being fit for duty means the individual is capable of performing his/her job without impairment.
3. Personnel should use RWP 33 and obtain an MG, then frisk prior to entering the TSC/OSC for drill or emergency response.

4.2 Emergency Response Positions:

When members of the Work Control Emergency Response Organization are notified via P.A. System announcement, Community Alert Network activation, or Pager activation that the Technical Support Center/Operational Support Center (TSC/OSC) is to be activated, the following Emergency Response positions shall be staffed by the Work Control Group:

1. Emergency Coordinator: When assigned Duty as the Emergency Coordinator, the Supt. of Work Control shall report to the TSC as soon as possible after notification, but must complete turnover and assume the Emergency Coordinator position within 75 minutes of the Emergency declaration. As Emergency Coordinator, report to the TSC and direct TSC activities per RP/O/B/1000119, TSC Emergency Coordinator Procedure. Assigned Duty will require maintaining Fitness for Duty requirements and 04/16/03 2

WPG 1.5, Emergency Plan for Work Control Group, Rev.0 carrying an Emergency Pager at all times. Work Control will staff a minimum I Emergency Coordinator.

2. OSC Manager: When assigned Duty as the OSC Manager, the designated Manager shall report to the OSC as soon as possible after notification, but within 75 minutes of the Emergency Declaration. The OSC Manager shall report to the OSC and direct OSC activities per RP/O/B/1000/25, OSC Coordinator Procedure. (Ihe Primary OSC is located in the Operations Center at the rear of the Unit 3 Control Room. The Alternate OSC is in Room 316A in the Oconee Office Building.) Assigned Duty will require maintaining Fitness for Duty requirements and carrying an Emergency Pager at all times. Work Control will staff a minimum 5 OSC Managers per NSD 117.
3. OSC Technical Assistant: Two Work Staff personnel designated as Technical Assistants should report to the OSC as soon as possible after notification of the Emergency Declaration. OSC Technical Assistants I & II shall report to the OSC and implement activities per RP/O/B/1000/25, Enclosures 4.1 and 4.2. The OSC Technical Assistant's primary responsibilities are to: keep the OSC Logbook; fill out the OSC Status Sheets; and maintain the OSC Status Board. They shall provide other assistance to the OSC Manager as required. The Assistants will be notified by duty pager or Community Alert Network (CAN), but need to meet Fitness for Duty requirements when responding.
4. FMT Driver Work Control will staff a minimum of 5 FMT Drivers per NSD 117.

5.0 Evacuation of Station Personnel The acting OSC Manager must establish 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coverage for all TSCIOSC positions manned by Work Control prior to releasing the Work Control staff:

Should it become necessary to evacuate the non-essential employees in the Work Control Group, the following guidelines are to be used:

I. An Evacuation Coordinator for Work Control personnel will be named. The Evacuation Coordinator will be made aware of the need for evacuation and which evacuation plan to use by hearing the announcement over the PA system. Evacuation can only occur after Site Assembly. The following information will be needed:

a. Assembly location(s) of groups you are responsible for.
b. Phone numbers to contact groups you are responsible for.
c. If the Evacuation Coordinator is not a Site Assembly Coordinator you will need to contact correct person for this information.
2. Evacuation will be accomplished in accordance with Station Procedure RP/I/B/1000/10 (Procedure for Emergency Evacuation/Relocation of Site Personnel).
3. The Work Control Evacuation Coordinator will ensure that assigned personnel are informed of their designation as being either essential or non-essential per instructions from the OSC/TSC. All personnel designated as essential will remain on site in the event 04/16/03 3

WPG 1.5, Emergency Plan for Work Control Group, Rev.0 of a Station Evacuation. All personnel designated as non-essential will be directed to follow all evacuation instructions if a Station Evacuation is announced.

4. The TSC Offsite Communicator will initiate evacuation/relocation with a PA announcement identifying the applicable evacuation/relocation plan in effect. RP may also enter this information on computer for distribution to Group Evacuation Coordinators at their site assembly location. It can be accessed through DAE/Oconee Information Library/Evac Plan ONS. Evacuation Coordinator should reference NSD-1 14 Appendix C-1 for additional details.
5. The Evacuation Coordinator will ensure that all sections within the group are aware which Evacuation/Relocation plan is in effect and have received Evacuation/Relocation instructions.
6. Evacuation Coordinator will report status of Evacuation/Relocation to phone mail 5094.

6.0 ATTACHMENTS None 04/16103 4