|
---|
Category:Code Relief or Alternative
MONTHYEARML22123A1922022-05-10010 May 2022 Authorization of Relief Request Nos. 8 and 9 Regarding Extension of Inspection Interval for Reactor Pressure Vessel Welds ML22069A7112022-03-16016 March 2022 Authorization of Relief Request No. 10 Regarding Use of ASME Code Case N-513-4 for Extended Period for Intake Cooling Water Discharge Piping ML21302A0902021-10-29029 October 2021 Verbal Authorization by the Office Nuclear Regulation Relief Request No. 10 Use of ASME Code Case N-513-4 for Extended Period Not to Exceed Six Months L-2021-107, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request Nos. 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(l), Extension of Inspection Interval for Turkey Point Units 3 and 4 Reactor Pressure2021-05-13013 May 2021 Fifth Ten-Year Inservice Inspection Interval Revised Relief Request Nos. 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(l), Extension of Inspection Interval for Turkey Point Units 3 and 4 Reactor Pressure ML20308A7472020-12-0707 December 2020 Withdrawal of Request for Relief Concerning Train a and B Component Cooling Water Supply and Return Piping ML20287A5512020-11-0606 November 2020 Approval of Alternative to Use ASME Code Section XI IWA-4340 - for Repairs of Component Cooling Water System Piping ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML17213A8632017-08-29029 August 2017 Safety Evaluation for Relief Request No. PR-03, for the Fifth 10 Year Inservice Testing Interval Regarding Boric Acid Transfer Pump Testing Instrumentation L-2017-121, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-07-24024 July 2017 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML17122A1402017-05-10010 May 2017 Safety Evaluation for Relief Request No. 5 for Fifth 10-Year Inservice Inspection Interval ML17082A5102017-04-0606 April 2017 Verbal Authorization of Relief Request No. 5 for Repair of High Head Safety Injection Recirculation Test Line - Fifth 10-Year Inservice Inspection Interval L-2017-050, Fifth Ten-Year Lnservice Inspection Interval Relief Request No. 52017-03-22022 March 2017 Fifth Ten-Year Lnservice Inspection Interval Relief Request No. 5 ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16293A7782016-10-26026 October 2016 Turkey Point Nuclear Generating, Unit Nos. 3 and 4 - Safety Evaluation for Relief Request No. 4 for Fifth 10 Year Inservice Inspection Interval - Risk-Informed Inservice Inspection Program (CAC Nos. MF7277 and MF7278) ML16047A1182016-03-0909 March 2016 Safety Evaluation for Relief Request No. 3 for Fifth 10-Year Inservice Inspection Interval - Alternative for Examination of Snubbers (CAC Nos. MF6386 and MF6387) ML15352A1622015-12-23023 December 2015 Safety Evaluation for Relief Request No. 17, for the Fourth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations ML15328A2402015-12-11011 December 2015 Safety Evaluation for Relief Request No. 15, for the Fourth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations ML13329A1202014-01-14014 January 2014 SE for RR No. 11 for 4th 10-Year Inservice Inspection Interval - Alternative Through-Wall Sizing Requirements for Implementation of ASME Code, Section XI, Appendix V111, Supplement 10 (TAC Nos. MF1391-92) L-2012-381, Fourth Ten-Year Interval, Relief Request No. 102012-11-13013 November 2012 Fourth Ten-Year Interval, Relief Request No. 10 L-2012-193, Concrete Containment Inservice Inspection Program, Exempt Tendon Inspection Relief Request No.72012-06-0505 June 2012 Concrete Containment Inservice Inspection Program, Exempt Tendon Inspection Relief Request No.7 ML1030502252010-11-0505 November 2010 Verbal Authorization of Relief Request No. 9, Visual Examination of Containment Liner Repair ML0533903272005-12-0606 December 2005 Relief Request, Safety Evaluation for Temporary Non-Code Repair of Spent Fuel Pool Cooling Line ML0520901822005-08-15015 August 2005 Relief, Regarding Mechanical Clamping Device on Pressure Boundary Piping ML0503503632005-03-0303 March 2005 Relief Request 1, Authorization of ISI Interval ML0428204702004-10-0606 October 2004 Safety Evaluation for Relief Requests PR-01 and PR-04 L-2004-164, ASME Section Xl Relief Requests Nos. 34 and 35 Alternative Through-Wall Sizing Requirements and Alternative Ultrasonic Examination for Reactor Flange to Upper Shell Welds2004-07-22022 July 2004 ASME Section Xl Relief Requests Nos. 34 and 35 Alternative Through-Wall Sizing Requirements and Alternative Ultrasonic Examination for Reactor Flange to Upper Shell Welds ML0416100682004-06-0404 June 2004 Correction Ltr, RAI Regarding Fourth Interval Inservice Test Relief Requests ML0330404922003-10-31031 October 2003 Relaxation of the Requirements of Order (EA-03-009) Regarding Reactor Pressure Vessel Head Inspections ML0306203852003-04-25025 April 2003 Relief, Associated with Reactor Vessel Closure Head Repair L-2003-063, ASME Section XI Relief Request No. 33, Alternative Requirements for Implementation of Appendix Viii, Supplement 102003-03-10010 March 2003 ASME Section XI Relief Request No. 33, Alternative Requirements for Implementation of Appendix Viii, Supplement 10 L-2002-085, Alternative Examination for Reactor Pressure Vessel Nozzle Inner Radius Re-submittal of Relief Request No. 252002-05-0606 May 2002 Alternative Examination for Reactor Pressure Vessel Nozzle Inner Radius Re-submittal of Relief Request No. 25 L-2002-044, Resubmittal of Code Relief Requests Nos. 30 & 31, Relief Request No. 30 Revised to Remove Reference to ASME Section IX, Paragraph QW-4242002-03-0101 March 2002 Resubmittal of Code Relief Requests Nos. 30 & 31, Relief Request No. 30 Revised to Remove Reference to ASME Section IX, Paragraph QW-424 2022-05-10
[Table view] Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] Category:Safety Evaluation
MONTHYEARML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML22307A1152022-11-28028 November 2022 Authorization of Relief Request No. 10 Part II Related to Repair of Intake Cooling Water Discharge Piping (EPID L-2022-LLR-0032) (Non-Proprietary) ML22028A0662022-05-24024 May 2022 Issuance of Amendment Nos. 296 and 289 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology (EPID L-2021-LLA-0070)- Non-Proprietary ML22123A1922022-05-10010 May 2022 Authorization of Relief Request Nos. 8 and 9 Regarding Extension of Inspection Interval for Reactor Pressure Vessel Welds ML22069A7112022-03-16016 March 2022 Authorization of Relief Request No. 10 Regarding Use of ASME Code Case N-513-4 for Extended Period for Intake Cooling Water Discharge Piping ML21032A0202021-02-26026 February 2021 Issuance of Amendment Nos. 295 and 268 Concerning Extension of Containment Leak Rate Testing Frequency ML20198M4982021-01-27027 January 2021 Issuance of Amendment Nos. 294 and 267 Regarding Emergency Action Level Scheme Upgrade (EPID L-2019-LLA-0271) (L-2019-203) ML20287A5512020-11-0606 November 2020 Approval of Alternative to Use ASME Code Section XI IWA-4340 - for Repairs of Component Cooling Water System Piping ML20237F3852020-10-20020 October 2020 Issuance of Amendment Nos. 293 and 286 Regarding Containment Atmospheric Radioactivity Ventilation Isolation and Leakage Detection System ML20104B5272020-04-16016 April 2020 Issuance of Exigent Amendment No. 291 Concerning the Deferral of Steam Generator Inspections ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19266A5852019-12-17017 December 2019 Issuance of Amendment Nos. 289 and 283 Technical Specification Applicability to Equipment Shared Between Units and Exception to Technical Specification 4.0.4 ML19031C8912019-08-15015 August 2019 Issuance of Amendment Nos. 288 and 282 Regarding Revised Reactor Core Safety Limit to Reflect WCAP-17642-PA Revision 1 ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19064A9032019-03-27027 March 2019 Issuance of Amendments Regarding Transition License Conditions for Reactor Coolant Pump Seals ML18354A6732019-03-18018 March 2019 Issuance of Amendments Regarding Technical Specifications Changes to Modify Emergency Diesel Generator Partial-Load Rejection Surveillance Requirement ML18270A4292018-12-0303 December 2018 Issuance of Amendments Nos. 284 and 278 Regarding Adoption of Risk-Informed Completion Times in Technical Specifications (CAC Nos. MF5455 and MF5456; EPID L-2014-LLA-0002) ML18255A3602018-11-14014 November 2018 Issuance of Amendments Regarding Technical Specifications Changes to Address Non-Conservative Actions for Containment and Control Room Ventilation Functions ML18130A4662018-06-12012 June 2018 Amendments Regarding Technical Specifications Pertaining to IST Program and ISI Program Requirements and Surveillance Frequency Control Program Applicability ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML18071A0802018-04-0606 April 2018 Correction to Safety Evaluation for Amendment Nos. 278 and 273 Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations (CAC Nos. MF9903 and MF9904; EPID L-2017-LLA-0254) ML18019A0782018-03-19019 March 2018 Issuance of Amendments Regarding the Elimination of Certain Technical Specification Reporting Requirements (CAC Nos. MF9601 and MF9602; EPID L-2017-LLA-0213) ML18018A5592018-02-20020 February 2018 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations (CAC Nos. MF9903 and MF9904; EPID L-2017-LLA-0254) ML17228A5632017-10-26026 October 2017 Issuance of Amendments Regarding Technical Specifications for High-Range Noble Gas Effluent Monitors ML17209A3192017-09-28028 September 2017 Issuance of Amendments Regarding Technical Specifications for Auxiliary Feedwater Actuation ML17213A8632017-08-29029 August 2017 Safety Evaluation for Relief Request No. PR-03, for the Fifth 10 Year Inservice Testing Interval Regarding Boric Acid Transfer Pump Testing Instrumentation ML17172A1152017-08-0303 August 2017 Turkey Point Nuclear Plant Generating Unit Nos. 3 and 4 - Issuance of Amendments Regarding Technical Specifications for Control Room Emergency Ventilation System (CAC Nos. MF8221 and MF8222) ML17122A1402017-05-10010 May 2017 Safety Evaluation for Relief Request No. 5 for Fifth 10-Year Inservice Inspection Interval ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML16335A1952017-02-14014 February 2017 Issuance of Amendments Regarding Technical Specifications for Auxiliary Feedwater Pumps ML17004A2922017-02-0909 February 2017 Issuance of Amendments Regarding Technical Specifications for Snubbers ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16279A4552016-10-28028 October 2016 Turkey Point Nuclear Generating Station Units 3 & 4 - Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16293A7782016-10-26026 October 2016 Turkey Point Nuclear Generating, Unit Nos. 3 and 4 - Safety Evaluation for Relief Request No. 4 for Fifth 10 Year Inservice Inspection Interval - Risk-Informed Inservice Inspection Program (CAC Nos. MF7277 and MF7278) ML16120A4732016-06-20020 June 2016 Issuance of Amendments Regarding Technical Specifications for Moderator Temperature Coefficient Measurements ML16004A0192016-04-26026 April 2016 Issuance of Amendments Regarding Technical Specification Figure for the Boric Acid Tank Minimum Volume ML16040A3732016-03-29029 March 2016 Issuance of Amendments Regarding Technical Specifications for Communications and the Manipulator Crane ML16047A1182016-03-0909 March 2016 Safety Evaluation for Relief Request No. 3 for Fifth 10-Year Inservice Inspection Interval - Alternative for Examination of Snubbers (CAC Nos. MF6386 and MF6387) ML16008B0722016-02-25025 February 2016 Issuance of Amendments Regarding Technical Specifications for Facility Staff Qualifications for Licensed Operators ML16011A4402016-02-0101 February 2016 Safety Evaluation for Relief Request No. 2 for the Fifth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations of the Regenerative Heat Exchanger Welds (MF6384-MF6385) ML16011A2052016-01-22022 January 2016 Safety Evaluation for Relief Request No. PR-02, for the Fifth 10-Year Inservice Testing Interval Regarding Requirements for the Quarterly Testing of the Residual Heat Removal Pumps (CAC Nos. MF6388 & MF6389) ML15352A1622015-12-23023 December 2015 Safety Evaluation for Relief Request No. 17, for the Fourth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations ML15350A2032015-12-23023 December 2015 Safety Evaluation for Relief Request No. 16, for the Fourth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations ML15328A2402015-12-11011 December 2015 Safety Evaluation for Relief Request No. 15, for the Fourth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations ML15328A1082015-12-0909 December 2015 Safety Evaluation for Relief Request No. PR-01, for the Fifth 10-Yeaer Inservice Testing Interval Regarding Requirements for the Quarterly Testing of the Boric Acid Transfer Pumps 2024-07-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy P.O. Box 14000 Juno Beach, FL 33408-0420 Mm:h 9, 2016
SUBJECT:
TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4-SAFETY EVALUATION FOR RELIEF REQUEST NO. 3 FOR FIFTH 10-YEAR INSERVICE INSPECTION INTERVAL -ALTERNATIVE FOR EXAMINATION OF SNUBBERS (CAC NOS. MF6386 AND MF6387)
Dear Mr. Nazar:
By application dated June 8, 2015, as supplemented by letter dated December 4, 2015, Florida Power & Light Company (the licensee) submitted Relief Request No. 3 for the fifth 10-year inservice inspection (ISi) interval of Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). Pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Paragraph 55a(a)(z)(1 ), the licensee requested the U.S. Nuclear Regulatory Commission (NRC) to authorize an alternative to the snubber visual examination requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code,Section XI, 2007 Edition with Addenda through 2008, as amended by 10 CFR, Section 50.55a. The licensee proposed to perform the visual examination of snubbers and associated attachment hardware in accordance with its Snubber Program. The NRC staff reviewed the subject request and, as set forth in the enclosed safety evaluation, concludes that the licensee adequately addressed all regulatory requirements in 1 O CFR 50.55a(a)(z)(1 ). Accordingly, the NRC staff authorizes Relief Request No. 3 at Turkey Point for the remainder of the fifth 10-year ISi interval, which is currently scheduled to end on February 21, 2024, for Unit 3 and on April 14, 2024, for Unit 4. All other requirements of 10 CFR 50.55a, the ASME BPV Code,Section XI, and the ASME Operation and Maintenance Code for which relief was not specifically requested and approved, remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
M. Nazar If you have any questions regarding this issue, please contact the project manager, Ms. Audrey Klett, at (301) 415-0489 or by e-mail at Audrey.Klett@nrc.gov. Docket Nos. 50-250 and 50-251
Enclosure:
Safety Evaluation cc w/encl.: Distribution via Listserv Sincerely, Benjamin G. Beasley, Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST NO. 3 FIFTH 10-YEAR INSERVICE INSPECTION INTERVAL FLORIDA POWER & LIGHT COMPANY TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 DOCKET NOS. 50-250 AND 50-251
1.0 INTRODUCTION
By application dated June 8, 2015,1 as supplemented by letter dated December 4, 2015,2 Florida Power & Light Company (the licensee) submitted Relief Request No. 3 (RR No. 3) for the fifth 10-year inservice inspection (ISi) intervals at Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). Pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Paragraph 55a(a)(z)(1 ), the licensee requested the U.S. Nuclear Regulatory Commission (NRC) to authorize an alternative to the snubber visual examination requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code,Section XI, 2007 Edition with Addenda through 2008, as amended by 10 CFR, Section 50.55a. The licensee proposed to perform the visual examination of snubbers and associated attachment hardware in accordance with its Snubber Program in lieu of the ASME BPV Code,Section XI, Subarticle IWF-2500 requirements. By electronic mail (email) dated October 1, November 13, and November 16, 2015,3 the NRC staff issued a request for additional information (RAI) to the licensee. By letter dated December 4, 2015, the licensee responded to the NRC staff's request.
2.0 REGULATORY EVALUATION
Paragraph 50.55a(g)(4) of 10 CFR states that throughout the service life of a boiling or pressurized water-cooled nuclear power facility, components (including supports) that are classified as ASME Code Class 1, Class 2, and Class 3 must meet the requirements, except design and access provisions and preservice examination requirements, set forth in Section XI of editions and addenda of the ASME BPV Code, or the ASME Operation and Maintenance (OM) Code for snubber examination and testing, that become effective subsequent to editions specified in paragraphs (g)(2) and (3) of this section and that are 1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15181A251. 2 ADAMS Accession No. ML 15351A405. 3 ADAMS Accession Nos. ML 15274A287, ML 16041A106, and ML 16041A109. respectively Enclosure incorporated by reference in paragraph (a)(1 )(ii) or (iv) for snubber examination and testing of this section, to the extent practical within the limitations of design, geometry, and materials of construction of the components, except where alternatives have been authorized pursuant to 10 CFR 50.55a(z). Pursuant to 10 CFR 50.55a(z)(1 ), alternatives to requirements may be authorized by the NRC if the licensee demonstrates that the proposed alternatives provide an acceptable level of quality and safety. A proposed alternative must be submitted and authorized prior to implementation. Section 50.55a of 10 CFR allows the NRC to authorize alternatives and to grant relief from ASME Code requirements upon making the necessary findings. Paragraph 50.55a(b)(3)(v)(B) states that the licensee must comply with the provisions for examining and testing snubbers in Subsection ISTD of the ASME OM Code when using the 2006 Addenda and later editions and addenda of Section XI of the ASME BPV Code. Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the NRC to authorize the alternative requested by the licensee for the remainder of the fifth 10-year ISi intervals. Accordingly, the NRC staff reviewed and evaluated the licensee's request pursuant to 10 CFR 50.55a(z)(1 ). The code of record for the fifth 10-year ISi intervals is the ASME Code,Section XI, 2007 Edition with Addenda through 2008, as amended by 1 O CFR 50.55a.
3.0 TECHNICAL EVALUATION
ASME Code Components for RR No. 3 and Applicable Code Edition and Addenda The applicable components for RR No. 3 are ASME Code Class 1, 2, and 3, snubber attachment hardware (pin-to-pipe and pin-to-structure), excluding integral attachments. The components are ASME Examination Category F-A, item numbers F1.10, F1 .20, F1 .30, and F1 .40. The applicable ASME BPV Code,Section XI edition and addenda for Turkey Point's fifth 10-year ISi program is the 2007 Edition through the 2008 Addenda. The Turkey Point snubber program for the fifth 10-year ISi intervals is based on the the ASME OM Code, Subsection ISTD, 2004 Edition with Addenda through 2006, as required by 10 CFR 50.55a(b)(3)(v)(B). The examination requirements for supports and associated attachment hardware are specified in ASME BPV Code,Section XI, Subarticle IWF-2500. Table IWF-2500-1, Examination Category F-A requires that visual VT-3 examinations be performed on ASME Code Class 1, 2, and 3 piping and component supports. The examination and testing of snubbers is governed by the ASME OM Code, Subsection ISTD, in accordance with the ASME BPV Code,Section XI, Subsubarticle IWF-1220, and 10 CFR 50.55a(b)(3)(v)(B). When determining the boundaries for support examinations, Subparagraph IWF-1300(g) states that all integral and nonintegral connections within the boundary governed by IWF rules and requirements are included. The interface boundaries for the examination of snubber and snubber attachment hardware are further addressed in Subparagraph IWF-1300(h), which states, "The examination boundary of the support containing snubber shall not include the connection to the snubber assembly (pins)." These boundaries are shown graphically in Figure IWF-1300-1 (f). Licensee's Proposed Alternative The licensee proposed that a single program -the Turkey Point Snubber Program -maintain the schedule of the examination of snubbers and the associated attachment hardware. The licensee stated it will perform the visual examination of snubbers concurrently with the associated attachment hardware (pin-to-pipe and pin-to-structure, excluding integral attachments) per the Snubber Surveillance Procedure No. O-OSP-105.1, "Visual Inspection, Removal and Reinstallation of Mechanical Shock Arrestors." The licensee stated that examinations on integral attachments that are associated with snubber attachment hardware are not included in the scope of this request for relief and that the examination of these items will continue in accordance with the ASME BPV Code,Section XI. Licensee's Reason for the Proposed Alternative The licensee is required to perform VT-3 visual examinations on Class 1, 2, and 3 supports, including attachment hardware, per the ASME BPV Code,Section XI. The licensee is also required to perform visual examinations and testing on snubber assemblies (snubber program) in accordance with the the ASME OM Code, Subsection ISTD. When incorporating the requirements of Subsection ISTD into its Snubber Program, the licensee included the visual examination of snubber attachment hardware (pin-to-pipe and pin-to-structure, excluding integral attachments) along with the visual examination of the snubber assembly (pin-to-pin). Having two nearly identical sets of requirements for the visual examination of the snubber (pin-to-pin) and snubber attachment hardware would require the performance of redundant examinations and cause unnecessary confusion in sample selection, data collection and documentation of these examinations. It would increase the occupational radiation exposure and cause the unnecessary repetition of activities. The licensee stated that it will update Surveillance Procedure No. O-OSP-105.1, "Visual Inspection, Removal and Reinstallation of Mechanical Shock Arrestors," to include the visual examination of snubber attachment hardware (pin-to-pin and pin-to structure, excluding integral attachments). Licensee's Basis for the Proposed Alternative The licensee's proposed Snubber Program surveillance procedure O-OSP-105-1 provides the requirements for the visual examination of snubbers (pin-to-pin) and associated attachment hardware (pin-to-pipe and pin-to-structure, excluding integral attachments). This Snubber Program provides the requirements necessary to implement and administer a comprehensive snubber surveillance, testing, maintenance, and service life monitoring. Procedure No. O-OSP-105-1 includes the examination data sheets and drawings associated with the complete support assembly as required by the ASME BPV Code,Section XI, Article IWF, as well as of the ASME OM Code, Subsection ISTA, "General Requirements," and Subsection ISTD, "Preservice and lnservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Nuclear Power Plants."
The licensee stated that examinations are performed by VT-3 certified personnel in accordance with the ASME BPV Code,Section XI, Subarticle IWF-2300. The licensee stated that findings identified during examinations that fail to meet specified criteria from Article IWF and Subsection ISTD are entered into its corrective action program, and findings associated with the snubber (pin-to-pin) are evaluated in accordance with the ASME OM Code. The licensee stated that findings between the pin-to-structure and pin-to-pipe are evaluated in accordance with the ASME Section XI, Article IWF. The licensee stated that examination of integral attachments will be in accordance with the ASME BPV Code,Section XI, Table IWB-2500-1 (Examination Category B-K), Table IWC-2500-1 (Examination Category C-C) and Table IWD-2500-1 (Examination Category D-A). The licensee stated that the visual examination criteria established in Procedure No. O-OSP-105-1 meets the examination criteria specified in the ASME BPV Code,Section XI, Table IWF-2500-1. The licensee stated that this procedure requires the visual examination of snubber (pin-to-pin), and snubber attachments, support attachments and attachments to the supporting foundation, including nuts, bolts, studs, welds, pins spacers, and embedment. Duration of Proposed Alternative The licensee requested to implement the alternative requirements during the fifth 10-year ISi intervals, which began on February 22, 2014, for Unit 3, and on April 15, 2014, for Unit 4. NRC Staff Evaluation The Turkey Point snubber program for the fifth 10-year ISi intervals is based on the ASME OM Code, 2004 Edition with 2005 and 2006 addenda; whereas the visual inspection of attachments for snubber attachment hardware (i.e., pin-to-pipe and pin-to structure, excluding integral attachments) is based on the ASME BPV Code,Section XI, 2007 Edition with 2008 Addenda. Snubbers (pin-to-pin) were removed from the ASME BPV Code,Section XI in the 2006 Addenda. The 2007 Edition through the 2008 Addenda of the ASME BPV Code,Section XI contains Figure IWF-1300-1 (f) that depicts the examination boundaries for snubber (pin-to-pin) and attachments (see Figure 1 below). Figure 1 Alvo <<Kduded from Section XI examinations lndudhlg piv<>l and clevis pins Clevis pin f'ieAon red eye UW.Cldl*I The component supports include snubbers {pin-to-pin) and their attachment hardware (pin-to-pipe and pin-to-structure), excluding the integral attachments. The examination and inspection of the snubbers (pin-to-pin) are to be performed per Subsections ISTA and ISTD of the ASME OM Code. However, examinations and inspections of support attachment hardware (pin-to-pipe and pin-to-structure, excluding integral attachments) are to be performed as specified in paragraphs IWF-1220 and IWF-2000 of the ASME BPV Code,Section XI. The licensee stated that having two similar sets of requirements for the visual examination and inspection for the same component supports (i.e., one for snubbers and another for their attachments and hardware), would require the performance of redundant examinations and cause unnecessary confusion in sample selection, data collection, and documentation of these examinations. In order to eliminate the duplication of effort of tracking two different examination boundaries for one component, the licensee proposed to perform the visual examination of snubbers (pin-to-pin) and associated attachment hardware (pin-to-pipe and pin-to-structure, excluding integral attachments) per the Snubber Program in lieu of a separate procedure containing the requirements specified in Subarticle IWF-2500 of the ASME BPV Code,Section XI. NRC staff reviewed the licensee's application and RAI response and found the proposed inservice examination of both snubbers and attachment hardware per the Snubber Program is acceptable because of the following reasons. (1) The ASME BPV Code,Section XI, 2007 Edition including the 2008 Addenda, Figure IWF-1300-1 (f) specifies the boundaries for the visual examination of snubbers {pin-to-pin) and snubber attachment hardware (pin-to-pipe and pin-to-structure, excluding integral attachments). Examination requirements for snubbers (pin-to-pin) are located in the ASME OM code. Examination requirements for snubber attachment hardware are located in the ASME BPV Code,Section XI. The licensee proposed to perform the visual examination of snubbers and associated attachment hardware (pin-to-pipe and pin-to-structure, excluding integral attachments) along with snubber (pin-to-pin) visual examination in the Snubber Program. (2) Incorporating inservice examination of both snubbers and their attachments into one program provides a better understanding of the condition of the snubber and its associated attachments, without sacrificing any quality and safety. (3) Paragraph IWA-2213 requires the use of VT-3 for visual examination of snubbers' associated attachment hardware (pin-to-pipe and pin-to-structure, excluding integral attachments); whereas Subsection ISTA-1500 requires the use of the owner's specified method for visual examination of snubbers. The licensee states that it will be using VT-3 qualified personnel for both snubbers and associated attachments. Performing both visual examinations of a snubber and its attachments under the Snubber Program using VT-3 qualified personnel to perform examinations provides a sufficient understanding of the snubber and its attachments to demonstrate the existence of an acceptable level of quality and safety. (4) Visual examination of the snubber and associated attachments will be performed at the same time to save time and radiation dose.
(5) The licensee will update Procedure No. O-OSP-105-1 to include the visual examination of snubber attachment hardware (pin-to-pipe and pin-to-structure, excluding integral attachments). Licensee procedures will be enhanced to include the current practice of using VT-3 certified examiners. (6) The .licensee stated that while performing visual examination of snubbers and their attachments, any findings related to snubbers (pin-to-pin) will be evaluated in accordance with the ASME OM Code requirements and will not be subject to the ASME BPV Code,Section XI, Subsection IWF requirements for evaluation and expansion. The licensee stated that any findings identified from snubbers' attachments (pin-to-pipe and pin-to-structure, excluding integral attachments) will be evaluated in accordance with Subsection IWF of the ASME BPV Code,Section XI, which prescribes that corrective measures be taken (including scope expansion if applicable) during the same refueling outage. (7) The licensee stated that if Code Case OMN-13 is implemented for snubbers to extend the visual examination interval to the 10-year maximum allowable, the complete support assemblies would be examined every 10 years. Therefore, a larger population of visual examination is performed for snubbers' associated attachment hardware than required by the ASME BPV Code,Section XI, Table IWF-2500-1. (8) The licensee stated that for flaws or relevant conditions that are discovered within the IWF boundary and that are determined to require corrective measures, additional examinations will be performed in accordance with the requirements of Subsubarticle IWF-2430, "Additional Examinations." Flaws and relevant conditions discovered on the snubber will be evaluated per the ASME OM Code requirements. Based on this evaluation, the NRC staff finds that the licensee's proposed alternative for visual examination of snubbers and snubber attachment hardware using the Snubber Program provides an acceptable level of quality and safety.
4.0 CONCLUSION
As set forth in this safety evaluation, the NRC staff determines that RR No. 3 provides an acceptable level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1 ). Therefore, the NRC staff authorizes the use of RR No. 3 at Turkey Point for the remainder of the fifth 10-year ISi and snubber program intervals. For Unit 3, the fifth 10-year ISi interval began on February 22, 2014, and is scheduled to end on February 21, 2024. For Unit 4, the fifth 10year ISi interval began on April 15, 2014, and is scheduled to end on April 14, 2024. All other requirements of 10 CFR 50.55a, the ASME BPV Code,Section XI, and the ASME OM Code for which relief was not specifically requested and approved, remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector. Principal Contributor: Gurjendra S. Bedi Date: March 9, 2016 M. Nazar If you have any questions regarding this issue, please contact the project manager, Ms. Audrey Klett, at (301) 415-0489 or by e-mail at Audrey.Klett@nrc.gov. Sincerely, IRA/ Benjamin G. Beasley, Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosure:
Safety Evaluation cc w/encl.: Distribution via Listserv DISTRIBUTION: PUBLIC RidsNrrLABClayton RidsNrrPMTurkeyPoint GBedi, NRR ADAMS A ccess1on N o.: LPL2-2 R/F RidsACRS_MailCTR RidsNrrDorlDpr Rlyengar, EDO ML16047A118 RidsNrrDorllpl2-2 RidsRgn2MailCenter RidsNrrDeEpnb *B *1 1yema1 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DE/EPNB/BC* NAME A Klett BClayton DAiiey DATE 2/17/2016 2/16/2016 02/12/2016 OFFICE NRR/DORL/LPL2-2/BC NAME BBeasley DATE 3/9/2016 OFFICIAL RECORD COPY