ML20308A747
Letter Sequence Withdrawal | |
---|---|
EPID:L-2020-LLR-0127, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 7 for Train a and B Component Cooling Water (CCW) Supply and Return Piping (Withdrawn, Closed) | |
Administration Questions
| |
MONTHYEARL-2020-104, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 7 for Train a and B Component Cooling Water (CCW) Supply and Return Piping2020-09-18018 September 2020
[Table View]Fifth Ten-Year Inservice Inspection Interval Relief Request No. 7 for Train a and B Component Cooling Water (CCW) Supply and Return Piping Project stage: Request L-2020-161, Notification to Withdraw Relief Request No. 72020-11-0202 November 2020 Notification to Withdraw Relief Request No. 7 Project stage: Request ML20308A7472020-12-0707 December 2020 Withdrawal of Request for Relief Concerning Train a and B Component Cooling Water Supply and Return Piping Project stage: Withdrawal 2020-12-07 |
ML20308A747 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 12/07/2020 |
From: | Ellen Brown Plant Licensing Branch II |
To: | Moul D Florida Power & Light Co |
Brown E | |
References | |
EPID L-2020-LLR-0127 | |
Download: ML20308A747 (2) | |
Similar Documents at Turkey Point | |
---|---|
Category:Code Relief or Alternative
MONTHYEARML22123A1922022-05-10010 May 2022
[Table view]Authorization of Relief Request Nos. 8 and 9 Regarding Extension of Inspection Interval for Reactor Pressure Vessel Welds ML22069A7112022-03-16016 March 2022 Authorization of Relief Request No. 10 Regarding Use of ASME Code Case N-513-4 for Extended Period for Intake Cooling Water Discharge Piping ML21302A0902021-10-29029 October 2021 Verbal Authorization by the Office Nuclear Regulation Relief Request No. 10 Use of ASME Code Case N-513-4 for Extended Period Not to Exceed Six Months L-2021-107, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request Nos. 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(l), Extension of Inspection Interval for Turkey Point Units 3 and 4 Reactor Pressure2021-05-13013 May 2021 Fifth Ten-Year Inservice Inspection Interval Revised Relief Request Nos. 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(l), Extension of Inspection Interval for Turkey Point Units 3 and 4 Reactor Pressure ML20308A7472020-12-0707 December 2020 Withdrawal of Request for Relief Concerning Train a and B Component Cooling Water Supply and Return Piping ML20287A5512020-11-0606 November 2020 Approval of Alternative to Use ASME Code Section XI IWA-4340 - for Repairs of Component Cooling Water System Piping ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML17213A8632017-08-29029 August 2017 Safety Evaluation for Relief Request No. PR-03, for the Fifth 10 Year Inservice Testing Interval Regarding Boric Acid Transfer Pump Testing Instrumentation L-2017-121, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-07-24024 July 2017 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML17122A1402017-05-10010 May 2017 Safety Evaluation for Relief Request No. 5 for Fifth 10-Year Inservice Inspection Interval ML17082A5102017-04-0606 April 2017 Verbal Authorization of Relief Request No. 5 for Repair of High Head Safety Injection Recirculation Test Line - Fifth 10-Year Inservice Inspection Interval L-2017-050, Fifth Ten-Year Lnservice Inspection Interval Relief Request No. 52017-03-22022 March 2017 Fifth Ten-Year Lnservice Inspection Interval Relief Request No. 5 ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16293A7782016-10-26026 October 2016 Turkey Point Nuclear Generating, Unit Nos. 3 and 4 - Safety Evaluation for Relief Request No. 4 for Fifth 10 Year Inservice Inspection Interval - Risk-Informed Inservice Inspection Program (CAC Nos. MF7277 and MF7278) ML16047A1182016-03-0909 March 2016 Safety Evaluation for Relief Request No. 3 for Fifth 10-Year Inservice Inspection Interval - Alternative for Examination of Snubbers (CAC Nos. MF6386 and MF6387) ML15352A1622015-12-23023 December 2015 Safety Evaluation for Relief Request No. 17, for the Fourth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations ML15328A2402015-12-11011 December 2015 Safety Evaluation for Relief Request No. 15, for the Fourth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations ML13329A1202014-01-14014 January 2014 SE for RR No. 11 for 4th 10-Year Inservice Inspection Interval - Alternative Through-Wall Sizing Requirements for Implementation of ASME Code, Section XI, Appendix V111, Supplement 10 (TAC Nos. MF1391-92) L-2012-381, Fourth Ten-Year Interval, Relief Request No. 102012-11-13013 November 2012 Fourth Ten-Year Interval, Relief Request No. 10 L-2012-193, Concrete Containment Inservice Inspection Program, Exempt Tendon Inspection Relief Request No.72012-06-0505 June 2012 Concrete Containment Inservice Inspection Program, Exempt Tendon Inspection Relief Request No.7 ML1030502252010-11-0505 November 2010 Verbal Authorization of Relief Request No. 9, Visual Examination of Containment Liner Repair ML0533903272005-12-0606 December 2005 Relief Request, Safety Evaluation for Temporary Non-Code Repair of Spent Fuel Pool Cooling Line ML0520901822005-08-15015 August 2005 Relief, Regarding Mechanical Clamping Device on Pressure Boundary Piping ML0503503632005-03-0303 March 2005 Relief Request 1, Authorization of ISI Interval ML0428204702004-10-0606 October 2004 Safety Evaluation for Relief Requests PR-01 and PR-04 L-2004-164, ASME Section Xl Relief Requests Nos. 34 and 35 Alternative Through-Wall Sizing Requirements and Alternative Ultrasonic Examination for Reactor Flange to Upper Shell Welds2004-07-22022 July 2004 ASME Section Xl Relief Requests Nos. 34 and 35 Alternative Through-Wall Sizing Requirements and Alternative Ultrasonic Examination for Reactor Flange to Upper Shell Welds ML0416100682004-06-0404 June 2004 Correction Ltr, RAI Regarding Fourth Interval Inservice Test Relief Requests ML0330404922003-10-31031 October 2003 Relaxation of the Requirements of Order (EA-03-009) Regarding Reactor Pressure Vessel Head Inspections ML0306203852003-04-25025 April 2003 Relief, Associated with Reactor Vessel Closure Head Repair L-2003-063, ASME Section XI Relief Request No. 33, Alternative Requirements for Implementation of Appendix Viii, Supplement 102003-03-10010 March 2003 ASME Section XI Relief Request No. 33, Alternative Requirements for Implementation of Appendix Viii, Supplement 10 L-2002-085, Alternative Examination for Reactor Pressure Vessel Nozzle Inner Radius Re-submittal of Relief Request No. 252002-05-0606 May 2002 Alternative Examination for Reactor Pressure Vessel Nozzle Inner Radius Re-submittal of Relief Request No. 25 L-2002-044, Resubmittal of Code Relief Requests Nos. 30 & 31, Relief Request No. 30 Revised to Remove Reference to ASME Section IX, Paragraph QW-4242002-03-0101 March 2002 Resubmittal of Code Relief Requests Nos. 30 & 31, Relief Request No. 30 Revised to Remove Reference to ASME Section IX, Paragraph QW-424 2022-05-10 Category:Letter MONTHYEARML24023A0342024-02-0505 February 2024
[Table view]Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05 |
Text
December 7, 2020 Mr. Don Moul Executive Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd.
Juno Beach, FL 33408
SUBJECT:
TURKEY POINT NUCLEAR GENERATING UNIT NO. 4 - WITHDRAWAL OF REQUEST FOR RELIEF CONCERNING TRAIN A AND B COMPONENT COOLING WATER SUPPLY AND RETURN PIPING (EPID L-2020-LLR-0127)
Dear Mr. Moul:
By letter dated September 18, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20266G309), you submitted Relief Request No. 7 for a modification in accordance with Section XI, IWA-4340 to repair certain sections of the degraded Turkey Point component cooling water supply and return piping by installing a proprietary repair device without removing the sections of degraded piping.
By letter dated November 2, 2020 (ADAMS Accession No. ML20307A407), you requested to withdraw the application from U.S. Nuclear Regulatory Commission (NRC) review. The NRC acknowledges your request to withdraw the application. The NRC staff activities on the review have ceased, and the associated Cost Activity Code number has been closed.
If you have any questions, please contact the Turkey Point Project Manager, Ms. Eva Brown at (301) 415-2315.
Sincerely,
/RA/
Eva A. Brown, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-251 cc: Listserv
ML20308A747 *via e-mail OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA* NRR/DORL/LPL2-2/BC*
NAME EBrown BAbeywickrama* UShoop DATE 11/03/2020 11/12/2020 12/07/2020