Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22123A19210 May 2022Authorization of Relief Request Nos. 8 and 9 Regarding Extension of Inspection Interval for Reactor Pressure Vessel WeldsProbabilistic Risk Assessment
Large early release frequency
ML22069A71116 March 2022Authorization of Relief Request No. 10 Regarding Use of ASME Code Case N-513-4 for Extended Period for Intake Cooling Water Discharge PipingUltimate heat sink
Through-Wall Leak
ML21302A09029 October 2021Verbal Authorization by the Office Nuclear Regulation Relief Request No. 10 Use of ASME Code Case N-513-4 for Extended Period Not to Exceed Six MonthsUltimate heat sink
Through-Wall Leak
L-2021-107, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request Nos. 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(l), Extension of Inspection Interval for Turkey Point Units 3 and 4 Reactor Pressure13 May 2021Fifth Ten-Year Inservice Inspection Interval Revised Relief Request Nos. 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(l), Extension of Inspection Interval for Turkey Point Units 3 and 4 Reactor PressureProbabilistic Risk Assessment
ML20308A7477 December 2020Withdrawal of Request for Relief Concerning Train a and B Component Cooling Water Supply and Return Piping
ML20287A5516 November 2020Approval of Alternative to Use ASME Code Section XI IWA-4340 - for Repairs of Component Cooling Water System PipingThrough-Wall Leak
ML18106B12125 April 2018Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination TechniquesHydrostatic
Nondestructive Examination
ML17213A86329 August 2017Safety Evaluation for Relief Request No. PR-03, for the Fifth 10 Year Inservice Testing Interval Regarding Boric Acid Transfer Pump Testing InstrumentationBoric Acid
L-2017-121, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography24 July 2017Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of RadiographyHydrostatic
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML17122A14010 May 2017Safety Evaluation for Relief Request No. 5 for Fifth 10-Year Inservice Inspection IntervalSafe Shutdown Earthquake
Operating Basis Earthquake
Through-Wall Leak
ML17082A5106 April 2017Verbal Authorization of Relief Request No. 5 for Repair of High Head Safety Injection Recirculation Test Line - Fifth 10-Year Inservice Inspection IntervalBoric Acid
Non-Destructive Examination
L-2017-050, Fifth Ten-Year Lnservice Inspection Interval Relief Request No. 522 March 2017Fifth Ten-Year Lnservice Inspection Interval Relief Request No. 5Boric Acid
Safe Shutdown Earthquake
Operating Basis Earthquake
Through-Wall Leak
ML16330A11815 December 2016NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201)Incorporated by reference
ML16293A77826 October 2016Turkey Point Nuclear Generating, Unit Nos. 3 and 4 - Safety Evaluation for Relief Request No. 4 for Fifth 10 Year Inservice Inspection Interval - Risk-Informed Inservice Inspection Program (CAC Nos. MF7277 and MF7278)
ML16047A1189 March 2016Safety Evaluation for Relief Request No. 3 for Fifth 10-Year Inservice Inspection Interval - Alternative for Examination of Snubbers (CAC Nos. MF6386 and MF6387)Incorporated by reference
ML15352A16223 December 2015Safety Evaluation for Relief Request No. 17, for the Fourth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific ExaminationsNondestructive Examination
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML15328A24011 December 2015Safety Evaluation for Relief Request No. 15, for the Fourth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific ExaminationsVT-2
Incorporated by reference
ML13329A12014 January 2014SE for RR No. 11 for 4th 10-Year Inservice Inspection Interval - Alternative Through-Wall Sizing Requirements for Implementation of ASME Code, Section XI, Appendix V111, Supplement 10 (TAC Nos. MF1391-92)Incorporated by reference
DM weld
L-2012-381, Fourth Ten-Year Interval, Relief Request No. 1013 November 2012Fourth Ten-Year Interval, Relief Request No. 10
L-2012-193, Concrete Containment Inservice Inspection Program, Exempt Tendon Inspection Relief Request No.75 June 2012Concrete Containment Inservice Inspection Program, Exempt Tendon Inspection Relief Request No.7
ML1030502255 November 2010Verbal Authorization of Relief Request No. 9, Visual Examination of Containment Liner RepairNondestructive Examination
ML0533903276 December 2005Relief Request, Safety Evaluation for Temporary Non-Code Repair of Spent Fuel Pool Cooling LineTime of Discovery
Nondestructive Examination
Liquid penetrant
ML05209018215 August 2005Relief, Regarding Mechanical Clamping Device on Pressure Boundary Piping
ML0503503633 March 2005Relief Request 1, Authorization of ISI IntervalBoric Acid
Hydrostatic
VT-2
Incorporated by reference
ML0428204706 October 2004Safety Evaluation for Relief Requests PR-01 and PR-04Boric Acid
Incorporated by reference
L-2004-164, ASME Section Xl Relief Requests Nos. 34 and 35 Alternative Through-Wall Sizing Requirements and Alternative Ultrasonic Examination for Reactor Flange to Upper Shell Welds22 July 2004ASME Section Xl Relief Requests Nos. 34 and 35 Alternative Through-Wall Sizing Requirements and Alternative Ultrasonic Examination for Reactor Flange to Upper Shell WeldsDissimilar Metal Weld
ML0416100684 June 2004Correction Ltr, RAI Regarding Fourth Interval Inservice Test Relief Requests
ML03304049231 October 2003Relaxation of the Requirements of Order (EA-03-009) Regarding Reactor Pressure Vessel Head InspectionsThrough-Wall Leakage
ML03062038525 April 2003Relief, Associated with Reactor Vessel Closure Head RepairNondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
L-2003-063, ASME Section XI Relief Request No. 33, Alternative Requirements for Implementation of Appendix Viii, Supplement 1010 March 2003ASME Section XI Relief Request No. 33, Alternative Requirements for Implementation of Appendix Viii, Supplement 10Dissimilar Metal Weld
L-2002-085, Alternative Examination for Reactor Pressure Vessel Nozzle Inner Radius Re-submittal of Relief Request No. 256 May 2002Alternative Examination for Reactor Pressure Vessel Nozzle Inner Radius Re-submittal of Relief Request No. 25
L-2002-044, Resubmittal of Code Relief Requests Nos. 30 & 31, Relief Request No. 30 Revised to Remove Reference to ASME Section IX, Paragraph QW-4241 March 2002Resubmittal of Code Relief Requests Nos. 30 & 31, Relief Request No. 30 Revised to Remove Reference to ASME Section IX, Paragraph QW-424Boric Acid
Non-Destructive Examination
Hydrostatic
Nondestructive Examination
Liquid penetrant
Through-Wall Leak
Dissimilar Metal Weld