MONTHYEARML20216D9541999-07-28028 July 1999 Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) ML20202J0891999-02-0303 February 1999 Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant ML20196J3501998-12-0404 December 1998 SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20196F9251998-11-25025 November 1998 Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant ML20195K4211998-11-17017 November 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) ML20195E1051998-11-13013 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 ML20155H5801998-11-0303 November 1998 Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI ML20155H5321998-11-0303 November 1998 Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting ML20154L6591998-10-14014 October 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 ML20153D2591998-09-21021 September 1998 SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement ML20236V8181998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant ML20236X5881998-07-29029 July 1998 Safety Evaluation Supporting Amend 245 to License DPR-59 ML20154L9201998-07-10010 July 1998 SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively ML20198S3031998-01-14014 January 1998 Supplemental SE Accepting RG 1.97,rev 2 Recommendations for Containment Isolation Valve Position Indication Instrumentation at NPP ML20128G2441993-02-0909 February 1993 Correction to NRC SE Associated W/Ts Amend 184,dtd 921217. SE Restates Portion of Section 2.0 ML20126F4771992-12-23023 December 1992 Safety Evaluation Granting Licensee Relief from ASME Code Requirements for Repair of RWCU Equalizing Line Until Next Refueling Outage ML20059K4331990-09-13013 September 1990 Safety Evaluation Accepting Util 881110,890328 & 900129 Submittals Re IGSCC Insp & Repair for Facility Reload 8/ Cycle 9 Refuel Outage ML20056B4011990-08-20020 August 1990 Safety Evaluation Approving Licensee Relief Request R14 & Denying Requests R15 & R5A Re Hydrostatic Test Requirements ML20058P4331990-08-13013 August 1990 Safety Evaluation Accepting ATWS Recirculation Pump Trip Sys Design Mod ML20206F5701988-11-18018 November 1988 Safety Evaluation Re Compliance w/10CFR50.62 ATWS Rule Re Alternate Rod Injection & Recirculating Pump Trip Sys ML20206D5231988-11-10010 November 1988 Safety Evaluation Supporting 880309 Request for Relief from Hydrostatic Test Requirement for HPCI & Rcic,Provided That Alternative Testing Performed ML20148B1001988-03-14014 March 1988 Safety Evaluation Accepting Util Justification for Deviations from Reg Guide 1.97 for post-accident Monitoring Variables ML20236G5801987-10-27027 October 1987 Safety Evaluation Supporting Util 850930,860827 & 1208 Submittals of Second 10-yr Inservice Insp Program Plan & Associated Relief Requests from ASME Code Insp Requirements ML20238E1461987-09-0808 September 1987 Safety Evaluation of Util 870415 Proposed Design for Standby Liquid Control Sys.Design Meets Requirements of 10CFR50.62 Re ATWS ML20237L5241987-09-0101 September 1987 Safety Evaluation Supporting Util 831109,840629 & 850702 Responses to Generic Ltr 83-28,Items 2.1 & 4.5.2 Re Equipment Classification & Vendor Interface & Reactor Trip Sys Reliability, Respectively ML20236J8151987-07-30030 July 1987 Safety Evaluation Re Insps for & Repairs of IGSCC During Reload 7/Cycle 8 Refueling Outage.Facility Can Be Safely Operated for One 18-month Fuel Cycle in Present Configuration ML20212F9421986-12-31031 December 1986 Safety Evaluation Supporting Amend to License DPR-59, Changing Tech Specs Re Second Level of Undervoltage Protection ML20214R5871986-11-24024 November 1986 Safety Evaluation Accepting Util Actions to Ensure Structural Integrity of Vacuum Breakers in Mark I Containments ML20210T3101986-10-0202 October 1986 Safety Evaluation Accepting Util 860228 Submittal of Rev 2 to Offsite Dose Calculation Manual on Interim Basis ML20205E3601986-08-0606 August 1986 Safety Evaluation on Util 830806,1109 & 840330 Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1. Licensee Complied W/All Items ML20210K5571986-04-18018 April 1986 Safety Evaluation Supporting Util Request for Relief from First 10-yr Inservice Insp Requirements for Class 1,2 & 3 Components ML20137S9901985-09-26026 September 1985 Safety Evaluation Accepting MSIV Leakage Control Sys,Per GDC 54, Piping Sys Penetrating Containment ML20134D2071985-08-0909 August 1985 Safety Evaluation of Util 831109 & 840629 Responses to Generic Ltr 83-28,Item 1.1, Post-Trip Review (Program Description & Procedure). Program & Procedures Acceptable ML20133F0011985-07-30030 July 1985 Safety Evaluation Accepting Util 831109 & 840629 Responses to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing ML20129E1721985-07-0101 July 1985 Safety Evaluation Re Radiological Consequences of Hypothetical LOCA While Purging Containment at Power. Radiological Consequences Acceptable ML20129E1411985-07-0101 July 1985 Safety Evaluation Supporting Demonstration of Containment Purge & Vent Valve Operability.Info Submitted Demonstrates Ability of 20-inch & 24-inch Purge & Vent Valves to Close Against Buildup of Containment Pressure During Dba/Loca ML20127E7221985-06-17017 June 1985 SER Supporting Util 840629 Response to Generic Ltr 84-09, Recombiner Capability Requirements of 10CFR50.44(c)(3)(ii) ML20127B3251985-06-10010 June 1985 Interim Safety Evaluation Approving Util 830630 Procedures Generation Package (PGP) for Emergency Operating Procedures Upon Resolution of Exceptions Noted in Section 2.PGP Submitted Per Generic Ltr 82-33 Re Suppl 1 to NUREG-0737 ML20127C7961985-06-0606 June 1985 Safety Evaluation Re Insp & Repair of RCS Piping.Plant Can Be Safely Returned to Operation in Present Configuration for Duration of Cycle 7 ML20140G5731975-07-15015 July 1975 Safety Evaluation Supporting Tech Spec Changes to License DPR-59 to Revise Suppression Pool Water Temp Limits 1999-07-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with ML20216D9541999-07-28028 July 1999 Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with1999-06-0202 June 1999 Annual Summary of Changes,Tests & Experiments for 1997/1998. with JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML20202J0891999-02-0303 February 1999 Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20198F9991998-12-0404 December 1998 Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant ML20196J3501998-12-0404 December 1998 SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with ML20196F9251998-11-25025 November 1998 Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant ML20195J7521998-11-18018 November 1998 Rev 7 to Jaf Colr ML20195K4211998-11-17017 November 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) ML20195E1051998-11-13013 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 ML20197G6221998-11-0606 November 1998 Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp ML20155H5321998-11-0303 November 1998 Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting ML20155H5801998-11-0303 November 1998 Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20155C2821998-10-30030 October 1998 Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant ML20154L6591998-10-14014 October 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20153D2591998-09-21021 September 1998 SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement ML20153B5611998-09-0101 September 1998 Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant ML20237E8361998-08-25025 August 1998 Rev 6 to Colr ML20237E9471998-08-0808 August 1998 Rev 6 to Colr JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant ML20236X5881998-07-29029 July 1998 Safety Evaluation Supporting Amend 245 to License DPR-59 ML20236V8181998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant ML20153B5781998-07-28028 July 1998 Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement ML20236X3831998-07-14014 July 1998 Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 ML20154L9201998-07-10010 July 1998 SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP ML20202G9081998-02-0606 February 1998 Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] |
Text
.
,. f " %,, *
.: c, UNITED STATES g# f '- NUCLEAR REGULATORY. COMMISSION
-;% Qf 'f- C WASHINGTON. D. C 20555
+
s j SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO GENERIC LETTER 83-28, ITEMS 3.1.1, 3.1.2, 3.2.1, 3.2.2, AND 4.5.1 POWER AUTHORITY OF THE STATE OF NEW YORK l
JAMES A. FITZPATRICK NUCLEAR POWER PLANT l i/CKET N0. 50-333 i 1.0. Introduction On February 25, 1983, both of the scram circuit breakers at Unit 1 of the Salem Nuclear Power Plant failed to open upon an automatic reactor trip l signal from the reactor protection system. This incident occurred during '
the plant startup, and the reactor was tripped manually by the operator about 30 seconds after the initiation of the automatic trip signal. The ,
failure of the circuit breakers has been determined to be related to the !
sticking of the undervoltage trip attachment. Prior to this incident, on February 22, 1983, at 'Jnit 1 of the Salem Nuclear Power Plant, an automatic, trip signal was generated due to a steam generator low-low level during plant startup. In this case, the reactor was tripped manually by the operator almost coincidentally with the automatic trip.
Following these incidents, on February 28, 1983, the NRC Executive Director for Operations (EDO), directed the staff to investigate and report on the generic implications of these occurrences at Unit 1 of the Salem Nuclear Power Plant. The results of the staff's inquiry into the genericimplicationsoftheSalemIincidentsarereportedinNUREG-1000, Gencric Implications of ATWS Events at the Salem Nuclear Power Plant."
As a result of this investigation, the Director, Division of Licensing, Office of Nuclear Reactor Regulation requested (by Generic Letter 83-28 l dated July 8,1983) all licensees of operating reactors, applicants for an operating license, and holders of construction permits to respond to car-tain generic concerns. These concerns are categorized into four areas:
(1) Post-Trip Review, (2) Equipment Classification and Vendor Interface, (3) Post-Maintenance Testing, and (4) Reactor Trip Systera (RTS) Reliabi-lity Improvements. Within each of these areas, various specific actions were delineated.
This safety evaluation (SE) addresses the following actions of Generic Letter 83-28:
3.1.1 and 3.1.2, Post-Maintenance Testing (Reactor Trip System Components) 3.2.1 and 3.2.2, Post-Maintenance Testing (All Other Safety-Related Components) -
4.5.1, Reactor Trip System Reliability (System Functiohal Testing)
$$getggggg gg88 ga ,
P L
I _ _ _ _ _ . _ . - _
9 2
By letters dated September 6, 1983; November 9, 1983, and March 30, 1984, 1 New York Power Authority (Licensee) described their planned and completed ,~
i actions regarding the above items for the James A. Fitzpatrick Nuclear l Power-Plant. -
2.0. Evaluation 2.1. General Generic Letter 83-28 included various NRC staff positions regarding the specific actions to be taken by operating reactor licensees and operating license applicants. The Generic Letter 83-28 positions
. and discussions of licensee compliance regarding Actions 3.1.1, -
3.1.2, 3.2.1, 3.2.2, and 4.5.1 for Fitzpatrick are presented in the sections that follow.
2.2. Actions 3.1.1 and 3.1.2, Post-Maintenance,, Testing (Reactor Trip System Components)
Position Licensees and applicants shall submit the results of their review of test and maintenance procedures and Technical Specifications to assure that post-maintenance operability testing of safety-related components in the reactor trip system (RTS) is required to be conducted and that the testing demonstrates that the equipment is capable of performing its safety functions before being returned to i service.
Licensees and applicants shall submit the results of their check of j vendor and engineering recommendations (regarding safety-related components in the RTS) to ensure that any appropriate test guidance is included in the test and maintenance procedurps or the Technical Specifications, where required.
Discussion By a letter dated November 9,1983, the licensee indicated that its reviews of procedures, technical specifications, and vendor recom-mendations were completed to assure that post-maintenance testing of safety related components in the reactor trip system was required to be performed. The licensee further stated that the BWR Owners Group would provide additional information with respect to the generic in-plications of the Salem ATW5 event,'and that revisions or additions
.to post-maintenance testing programs or procedures would be completed
- after receipt of final recommendations of a Nuclear Utility Task Action Committee (NUTAC) and the vendor group.
- . e e
- - - - - - - - - - - --, - - - - - _..-,-..,-....,n -
. . - - - - - . . - - , - - - , _ , . , _ - . . . - - - - - - - -----m ,, - , - - - - -
O i '
The licensee stated that a review of the Technical Specifications was c6mpleted to determine if any post-maintenance test requirements de- ,_
grade safety, and that the review did not identify any of such cases.
~< . ,
The licensee has completed a major revision of the Work Activity Con- 1 trol Procedure (WACP) 10.1.1, Procedure for Control of Maintenance, on January 31, 1986, which specified the testing requirements of the reactor trip system components before being returned to service fol-lowing maintenance.
i
)
Based on the above, the staff concluded that the licensee has compli- )
ed with the NRC staff position for actions 3.1.1 and 3.1.2 of Generic l Letter 83-28.
2.3. Actions 3.2.1 and 3.2.2, Post-Maintenance Testing (All Other
'Saifety-Related Nmponents)
Position
~
Licensees and applicants shall submit a report documenting the ex-
- tanding of test and maintenance procedures and Technical Specifica-tions review to assure that post-maintenance operability testing of all safety-related equipment is required to be conducted and that the testing demonstrates that the equipment is capable of performing its safety functions before being returned to service.
Licensees and applicants shall submit the results of their check of vendor and engineering recommendations (all other safety-related com-ponents) to ensure that any appropriate test guidance is included in
, the test and maintenance procedures or the Technical Specifications, I where required.
l Discussion s l
In letters of September 6, 1983, November 9, 1983, and March 30, 1984, the licensee indicated that a program was implemented to incorporate both current and future vendor and/or engineering recommendations into test performance, maintenance, post-maintenance tests or techni-cal specifications. .
Safety-related maintenance work and subsequent post-maintenance test-ing requirements were addressed in the station procedure WACP 10.1.1, Procedure for Control of Maintenance, Revision 10, January 31, 1986. .
, The licensee also stated that Operations Department standing Order i i number 18 and the procedure WACP 10.1.1 provided instructions and >
guidance to the Shift Supervisor and Quality Control Personnel on test performance, inspection and acceptance, assuring that all
- i . safety-related equipment is operable when .it is returned to service.
G .
l
(
- _ . . - - - . . _ , - . _ . . ---a.
~
j
- AllG 66 4
4 Based on the above and the licensee's commitment to incorporate any future vendor recommendations into the station procedures, the staff concluded that the licensee. has . complied with.the NRC staff position
_for actions 3.2.1 and 3.2.2 for Generic Letter 83-28. .
2.4. kction 4.5.1. Reactor Trip System Reliability (System Functional Testina)
Position On-line functional testing of the reactor trip system, including in-dependent testing of the diverse trip features, shall be performed on all plants. The diverse trip features to be tested include the- i breaker undervoltage and shunt trip features on Westinghouse, 86W and CE plants; the circuitry used for power interruption with the silicon controlled rectifters on B&W plants; and the scram pilot valve and backup scram valves (including all initiating circuitry) on GE plants.
Discussion -
i In a letter dated November 9,1983, the licensee stated that the re-liability of the reactor trip system is demonstrated by the on-line functional tests and calibrations required by Technical specification Table 4.1-1, in conjunction with control red scram time testing. The i licensee indicated that the tests periodically demonstrate function and reliability of the entire reactor trip system. The Itcensee fur-ther stated that the design of the backup scram valves does not permit a qualitative on-line test and they are not required to be
. tested by Technical Specifications.
Justification for not making modifications to permit on-line testing has been reviewed separately by the staff under. Action Item 4.5.2 of Generic Letter 83-28, and the staff found that'such modifications are not required.
I l Based on the above, the staff concluded that the licensee has com-i plied with the NRC staff position for Action 4.5.1 of Generic Letter l ss-2s.
3.0. Conclusion Based upon the foregoing discussions, the staff concludes that the Itcensee has complied with Actions 3.1.1, 3.1.2, 3.2.1, 3.2.2, and 4.5.1 of Generic Letter 83-28.
l Dated:
~
l.- . Principal Contributor:
1
[~ J. Chung, Division of Reactor Safety, Region !
l l .