RA-21-0145, Revision to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method
From kanterella
Letter Sequence Request | |
---|---|
EPID:L-2022-LLR-0010, SLC Manual Revision to Loes and 16.11-2 (Approved, Closed) | |
Initiation Administration Questions
| |
MONTHYEARRA-21-0145, Revision to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method2021-04-24024 April 2021
[Table View]Revision to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method Project stage: Request RA-21-0144, Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant2022-01-20020 January 2022 Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant Project stage: Request ML22041A5312022-02-10010 February 2022 NRR E-mail Capture - Catawba Nuclear Station Unit 2 - Acceptance of Requested Licensing Action Use of Alternative Requirements of ASME Code for Embedded Flaw Repair Method on Reactor Vessel Closure Head Penetration 74 EPID L-2022-LLR-0010 Project stage: Acceptance Review RA-22-0180, Supplement to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant2022-07-0707 July 2022 Supplement to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant Project stage: Supplement ML22200A0302022-07-0707 July 2022 SLC Manual Revision to Loes and 16.11-2 Project stage: Request ML22195A2432022-07-19019 July 2022 Request for Withholding Information from Public Disclosure Regarding Reactor Vessel Closure Head Repair Alternative Project stage: Withholding Request Acceptance ML22213A2532022-08-31031 August 2022 Authorization and Safety Evaluation for Alternative Request RA-21-0144 to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method Project stage: Approval 2022-02-10 |
ML21114A000 | |
Person / Time | |
---|---|
Site: | Catawba |
Issue date: | 04/24/2021 |
From: | Simril T Duke Energy Carolinas |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RA-21-0145 | |
Download: ML21114A000 (20) | |
Similar Documents at Catawba | |
---|---|
Category:Letter type:RA
MONTHYEARRA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-01-10010 January 2024
[Table view]Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report2023-11-16016 November 2023 End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report2023-09-25025 September 2023 Refuel 27 (C1 R27) Inservice Inspection (ISI) Report RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks2023-08-28028 August 2023 Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications2023-06-19019 June 2023 License Amendment Application to Revise Control Room Cooling Technical Specifications RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0105, Duke Energy Carolinas, LLC (Duke Energy) - Core Operating Limits Report (COLR) for Unit 1 Cycle 28 Reload Core2023-05-0404 May 2023 Duke Energy Carolinas, LLC (Duke Energy) - Core Operating Limits Report (COLR) for Unit 1 Cycle 28 Reload Core RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0042, Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change2023-04-24024 April 2023 Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change RA-23-0091, Submittal of Emergency Action Level (EAL) Technical Basis Document, Revision 42023-04-13013 April 2023 Submittal of Emergency Action Level (EAL) Technical Basis Document, Revision 4 RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-23-0084, Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Rev. 42023-03-29029 March 2023 Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Rev. 4 RA-23-0083, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 22023-03-16016 March 2023 Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 2 RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2023-02-0202 February 2023 Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0608, Refuel 25 (C2R25) Inservice Inspection (ISI) Report2023-01-25025 January 2023 Refuel 25 (C2R25) Inservice Inspection (ISI) Report RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-01-23023 January 2023 Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab2022-12-0505 December 2022 Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab RA-22-0331, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 12022-11-22022 November 2022 Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 1 RA-22-0266, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core2022-09-19019 September 2022 Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core RA-22-0201, Refuel 24 Steam Generator Tube Inspection Report Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-07-21021 July 2022 Refuel 24 Steam Generator Tube Inspection Report Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections RA-22-0220, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks2022-07-19019 July 2022 Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks RA-22-0218, Emergency Action Level (EAL) Technical Basis Document, Revision 32022-07-14014 July 2022 Emergency Action Level (EAL) Technical Basis Document, Revision 3 RA-22-0205, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks2022-07-11011 July 2022 Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks RA-22-0180, Supplement to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant2022-07-0707 July 2022 Supplement to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant RA-22-0195, Response to Request for Additional Information (RAI) for the Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue for the Safety Injection Nozzle2022-06-29029 June 2022 Response to Request for Additional Information (RAI) for the Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue for the Safety Injection Nozzle RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes2022-05-24024 May 2022 Duke Energy Common Emergency Plan, Revision 2, Summary of Changes RA-22-0148, 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory2022-05-16016 May 2022 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-22-0149, Supplement to the Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-28028 April 2022 Supplement to the Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System RA-22-0028, Annual Report of Changes Pursuant to 10 CFR 50.462022-04-27027 April 2022 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-22-0029, Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 20212022-04-27027 April 2022 Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021 RA-22-0115, Request for Acceptance of Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue (EAF) for the Safety Injection Nozzle2022-04-21021 April 2022 Request for Acceptance of Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue (EAF) for the Safety Injection Nozzle RA-22-0102, Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology2022-04-0707 April 2022 Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-0707 April 2022 Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System 2024-01-10 Category:Report MONTHYEARRA-22-0180, Supplement to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant2022-07-0707 July 2022
[Table view]Supplement to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant RA-22-0115, Request for Acceptance of Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue (EAF) for the Safety Injection Nozzle2022-04-21021 April 2022 Request for Acceptance of Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue (EAF) for the Safety Injection Nozzle RA-21-0144, Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant2022-01-20020 January 2022 Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant RA-19-0245, of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology2021-10-25025 October 2021 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology RA-21-0145, Revision to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method2021-04-24024 April 2021 Revision to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method RA-21-0133, Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method2021-04-23023 April 2021 Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method ML20150A3322020-04-23023 April 2020 Revision of Slc'S 16-11-2, 16-11-7 and Loes RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.462019-05-30030 May 2019 Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 CNS-17-043, Report 16C4437-RPT-002, Revision 0, 50.54(f) NTTF 2.1 Seismic High Frequency Confirmation for Catawba Nuclear Station.2017-07-0707 July 2017 Report 16C4437-RPT-002, Revision 0, 50.54(f) NTTF 2.1 Seismic High Frequency Confirmation for Catawba Nuclear Station. CNS-17-036, Mid-Cycle Power Uprate Ascension Startup Report2017-06-29029 June 2017 Mid-Cycle Power Uprate Ascension Startup Report CNS-17-022, Summary of 10CFR 50.54(q) Evaluation2017-04-25025 April 2017 Summary of 10CFR 50.54(q) Evaluation ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report CNS-15-101, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants2015-12-11011 December 2015 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants ML15238A7392015-08-24024 August 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask CNS-15-049, Submittal of 2013/2014 10 CFR 50.59 Summary Report of Changes, Tests, Experiments, and Evaluations2015-05-11011 May 2015 Submittal of 2013/2014 10 CFR 50.59 Summary Report of Changes, Tests, Experiments, and Evaluations ML15096A5132015-04-27027 April 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Revaluations Relating to Recommendation 2.1 of the NTTF Review ML15093A4212015-03-31031 March 2015 Submittal of CNEI-0400-281, Revision 0, Core Operating Limits Reports for Cycle 21 Reload Core, Calculation CNC-1553.05-00-0621 CNS-15-031, Commitment Change Evaluation Report for 20142015-03-24024 March 2015 Commitment Change Evaluation Report for 2014 CNS-14-129, Transmittal of Industry High Density Polyethylene (Hdpe) Test Results2014-12-0808 December 2014 Transmittal of Industry High Density Polyethylene (Hdpe) Test Results CNS-14-131, WCAP-17669-NP, Revision 0, Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate: Reactor Vessel Integrity and Neutron Fluence Evaluations2014-06-30030 June 2014 WCAP-17669-NP, Revision 0, Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate: Reactor Vessel Integrity and Neutron Fluence Evaluations ML14108A2012014-05-16016 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident CNS-14-045, Commitment Change Evaluation Report for 20132014-03-31031 March 2014 Commitment Change Evaluation Report for 2013 CNS-14-038, DUKCORP042-PR-001, Seismic Hazard & Screening Report in Response to the 50.54(f) Information Request Re Fukishima Near-Term Task Force Recommendation 2.1 Seismic2014-03-13013 March 2014 DUKCORP042-PR-001, Seismic Hazard & Screening Report in Response to the 50.54(f) Information Request Re Fukishima Near-Term Task Force Recommendation 2.1 Seismic ML14041A2952013-12-0202 December 2013 Document No. 1457690303-R-M-00005-0, Revision 0, NTTF 2.3 Seismic Peer Review Supplementary Report, Catawba Nuclear Station Unit 2. CNS-13-005, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology2013-11-14014 November 2013 License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology ML13276A5052013-09-25025 September 2013 Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 2 of 2 ML13276A5042013-09-25025 September 2013 Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 1 of 2 ML14353A0282013-04-30030 April 2013 WCAP-16083-NP, Revision 1, Benchmark Testing of the Ferret Code for Least Squares Evaluation of Light Water Reactor Dosimetry ML13162A0702013-03-14014 March 2013 1457690303-R-M-00004-0, NTTF 2.3 Seismic Peer Review Supplementary Report ML13162A0722012-11-18018 November 2012 1457690303-R-M-00003-0, NTTF 2.3 Seismic Peer Review Report ML12167A0162012-06-21021 June 2012 Review of the 2011 Steam Generator Tube Inservice Inspection During Refueling Outage End of Cycle 19 ML12153A3292012-03-31031 March 2012 Attachment 6 - Duke Energy Methodology Report DPC-NE-1007, Revision 0, Conditional Exemption of the EOC Mtc Measurement Methodology (Non-proprietary) ML11327A1492011-11-22022 November 2011 Proposed Technical Specifications (TS) and Bases Amendment TS and Bases 3.7.8, Nuclear Service Water System (Nsws) ML11244A0552011-09-12012 September 2011 Review of the 2010 Steam Generator Tube Inspections During Refueling Outage 17 End of Cycle 17 ML11188A1082011-06-30030 June 2011 WCAP-17330-NP, Rev 1, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5). (Non-Proprietary) NEI 99-04, Catawba, Units 1 & 2, Submittal of Commitment Change Evaluation Report for 20102011-03-30030 March 2011 Catawba, Units 1 & 2, Submittal of Commitment Change Evaluation Report for 2010 ML1109603572011-03-30030 March 2011 Submittal of Commitment Change Evaluation Report for 2010 ML16102A1592010-09-30030 September 2010 DPC-NE-3002-A Rev 4b, UFSAR Chapter 15 System Transient Analysis Methodology. ML1028504722010-09-29029 September 2010 CNEI-0400-203, Revision 0, Appendix a Power Distribution Monitoring Factors ML1023001682010-08-16016 August 2010 Units 1 & 2 - Supplement 2 to License Amendment Request for Duke Energy Cyber Security Plan ML1028504742010-08-0505 August 2010 CNEI-0400-203, Revision 0, Catawba, Unit 2 Cycle 18 Core Operating Limits Report ML1016700892010-06-10010 June 2010 Stations, Units 1 and 2 - Report Pursuant to 10 CFR 50.46, Changes to or Errors in an ECCS Evaluation Model ML1019304172010-05-0606 May 2010 Tritium Database Report ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML1011802492010-04-22022 April 2010 2009 10CFR50.59 Summary Report ML1017303842009-08-25025 August 2009 Westinghouse LTR-SGMP-09-109 NP-Attachment, Response to NRC Request for Additional Information on H*: RAI #4; Model F and Model D5 Generators. ML1017303912009-08-12012 August 2009 Westinghouse LTR-SGMP-09-100 NP-Attachment, Response to NRC Request for Additional Information on H*; Model F and Model D5 Steam Generators. ML1017303892009-05-31031 May 2009 WCAP-17072-NP, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model D5). ML16102A1582009-05-31031 May 2009 DPC-NE-3001-A, Rev 0a, Multidimensional Reactor Transients & Safety Analysis Physics Parameters Methodology. ML0904007952009-02-0404 February 2009 GSI-189 Action Plan, Feb. 09 Update, Publicly Available Version 2022-07-07 Category:Technical MONTHYEARRA-22-0180, Supplement to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant2022-07-0707 July 2022
[Table view]Supplement to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant RA-21-0144, Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant2022-01-20020 January 2022 Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant RA-19-0245, of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology2021-10-25025 October 2021 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology RA-21-0145, Revision to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method2021-04-24024 April 2021 Revision to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method RA-21-0133, Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method2021-04-23023 April 2021 Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method ML20150A3322020-04-23023 April 2020 Revision of Slc'S 16-11-2, 16-11-7 and Loes CNS-17-036, Mid-Cycle Power Uprate Ascension Startup Report2017-06-29029 June 2017 Mid-Cycle Power Uprate Ascension Startup Report CNS-14-129, Transmittal of Industry High Density Polyethylene (Hdpe) Test Results2014-12-0808 December 2014 Transmittal of Industry High Density Polyethylene (Hdpe) Test Results CNS-14-038, DUKCORP042-PR-001, Seismic Hazard & Screening Report in Response to the 50.54(f) Information Request Re Fukishima Near-Term Task Force Recommendation 2.1 Seismic2014-03-13013 March 2014 DUKCORP042-PR-001, Seismic Hazard & Screening Report in Response to the 50.54(f) Information Request Re Fukishima Near-Term Task Force Recommendation 2.1 Seismic ML14041A2952013-12-0202 December 2013 Document No. 1457690303-R-M-00005-0, Revision 0, NTTF 2.3 Seismic Peer Review Supplementary Report, Catawba Nuclear Station Unit 2. CNS-13-005, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology2013-11-14014 November 2013 License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology ML13276A5042013-09-25025 September 2013 Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 1 of 2 ML13276A5052013-09-25025 September 2013 Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 2 of 2 ML14353A0282013-04-30030 April 2013 WCAP-16083-NP, Revision 1, Benchmark Testing of the Ferret Code for Least Squares Evaluation of Light Water Reactor Dosimetry ML13162A0702013-03-14014 March 2013 1457690303-R-M-00004-0, NTTF 2.3 Seismic Peer Review Supplementary Report ML13162A0722012-11-18018 November 2012 1457690303-R-M-00003-0, NTTF 2.3 Seismic Peer Review Report ML12153A3292012-03-31031 March 2012 Attachment 6 - Duke Energy Methodology Report DPC-NE-1007, Revision 0, Conditional Exemption of the EOC Mtc Measurement Methodology (Non-proprietary) ML11327A1492011-11-22022 November 2011 Proposed Technical Specifications (TS) and Bases Amendment TS and Bases 3.7.8, Nuclear Service Water System (Nsws) ML11244A0552011-09-12012 September 2011 Review of the 2010 Steam Generator Tube Inspections During Refueling Outage 17 End of Cycle 17 ML11188A1082011-06-30030 June 2011 WCAP-17330-NP, Rev 1, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5). (Non-Proprietary) ML16102A1592010-09-30030 September 2010 DPC-NE-3002-A Rev 4b, UFSAR Chapter 15 System Transient Analysis Methodology. ML1028504722010-09-29029 September 2010 CNEI-0400-203, Revision 0, Appendix a Power Distribution Monitoring Factors ML1028504742010-08-0505 August 2010 CNEI-0400-203, Revision 0, Catawba, Unit 2 Cycle 18 Core Operating Limits Report ML16102A1582009-05-31031 May 2009 DPC-NE-3001-A, Rev 0a, Multidimensional Reactor Transients & Safety Analysis Physics Parameters Methodology. ML0904007952009-02-0404 February 2009 GSI-189 Action Plan, Feb. 09 Update, Publicly Available Version CNS-16-017, DPC-NE-2005-A, Rev 4a, Thermal-Hydraulic Statistical Core Design Methodology.2008-12-31031 December 2008 DPC-NE-2005-A, Rev 4a, Thermal-Hydraulic Statistical Core Design Methodology. ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0814207582008-01-31031 January 2008 Offsite Dose Calculation Manual (Odcm), 2008, Revision 50 ML0721505862007-07-30030 July 2007 Transmittal of DPC-NF-2010-A, Nuclear Physics Methodology for Reload Design, Revision 2 ML0718002502007-04-30030 April 2007 ANP-10280NP, Revision 0, Poolside Postirradiation Examination of MOX Lead Assemblies. ML0627103142006-09-29029 September 2006 Review of Cycle 15 Steam Generator Tube Inservice Inspection Summary Reports ML0606704362006-02-28028 February 2006 LTR-CDME-06-17-NP, Steam Generator Tube Alternate Repair Criteria for the Portion of the Tube within the Tubesheet at Catawba 2 in Support of Cycle 15 Operation. ML0536301452005-12-31031 December 2005 LTR-CDME-05-180-NP, Rev 2, Steam Generator Tube Alternate Repair Criteria for the Portion of the Tube within the Tubesheet at Catawba 2. ML0409805552003-10-31031 October 2003 Population of Melcor Radionuclide (Rn) Classes: Origen Isotopic Depletion Calculation for High Burnup LOW-ENRICHED Uranium and WEAPONS-GRADE Mixed Oxide PWR Fuel Assemblies (Draft) ML0302903742003-01-21021 January 2003 Inservice Testing Program for Pumps & Valves - Manual Update, Sections 5.0 - 7.1 ML0302903572003-01-21021 January 2003 Inservice Testing Program for Pumps & Valves - Manual Update, Section 4.1, Ni - Ym ML0302900822003-01-21021 January 2003 Inservice Testing Program for Pumps & Valves - Manual Update, Detailed Description of Changes - Section 4.1 ML0215104912002-01-31031 January 2002 Offsite Dose Calculation Manual (ODCM) 2002, Revision 44 2022-07-07 |