05000339/LER-1999-002-03, :on 990922,containment Liner Through Wall Defect Was Noted.Caused by Corrosion.Pressure Test Was Performed.With1999-10-21021 October 1999
- on 990922,containment Liner Through Wall Defect Was Noted.Caused by Corrosion.Pressure Test Was Performed.With
ML20217N9281999-10-20020 October 1999
Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised
ML20217H3631999-10-14014 October 1999
Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su
ML18152A2811999-10-12012 October 1999
Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619
05000339/LER-1999-001-03, :on 990915,failure to Lock Open Loop SV Breakers as Intended by TSs Was Noted.Caused by Failure to Update Operating Procedures.Procedure ARs Were Initiated & Approved for Maint Procedure 1/2-MOP-5.92.With1999-10-12012 October 1999
- on 990915,failure to Lock Open Loop SV Breakers as Intended by TSs Was Noted.Caused by Failure to Update Operating Procedures.Procedure ARs Were Initiated & Approved for Maint Procedure 1/2-MOP-5.92.With
ML20212J9251999-10-0101 October 1999
Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant
ML20217D6851999-09-30030 September 1999
Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With
05000338/LER-1999-006-01, :on 990904,potential for Safegurads Exhaust Flow to Bypass Charcoal Filter,Was Discovered.Caused by Degraded Damper.Plant Issue Rept Submitted for B Train of Savs Flow Rate.With1999-09-28028 September 1999
- on 990904,potential for Safegurads Exhaust Flow to Bypass Charcoal Filter,Was Discovered.Caused by Degraded Damper.Plant Issue Rept Submitted for B Train of Savs Flow Rate.With
05000338/LER-1999-002, :on 990213,unsecured Isolation Valve,Was Discovered.Caused by Valve Configuration.Unsecured Bit Manual Bypass Isolation Valve Was Verified Closed & Chain & Lock Secured Valve Tee Handle.With1999-09-17017 September 1999
- on 990213,unsecured Isolation Valve,Was Discovered.Caused by Valve Configuration.Unsecured Bit Manual Bypass Isolation Valve Was Verified Closed & Chain & Lock Secured Valve Tee Handle.With
ML20211N2611999-09-0808 September 1999
Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable
ML20216E5011999-08-31031 August 1999
Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with
ML20211J2421999-08-31031 August 1999
Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2
ML20211J2561999-08-31031 August 1999
Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2
ML18152B3831999-08-23023 August 1999
Safety Evaluation Granting Relief Request from ASME Section XI Requirements for Containment Insp
ML20210T0791999-08-13013 August 1999
Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable
ML20210S1411999-07-31031 July 1999
Monthly Operating Repts for July 1999 for North Anna Power Station.With
ML20210Q9931999-07-31031 July 1999
Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud
ML20209E5641999-06-30030 June 1999
Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With
ML20195G1901999-05-31031 May 1999
Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with
05000338/LER-1999-004, :on 990413,position Switch for Suction Supply Dampers to CR Emergency Fan Was Discovered Out of Position. Cause Could Not Be Determined.Station Entered Action Statement for TS 3.7.7.1.With1999-05-11011 May 1999
- on 990413,position Switch for Suction Supply Dampers to CR Emergency Fan Was Discovered Out of Position. Cause Could Not Be Determined.Station Entered Action Statement for TS 3.7.7.1.With
ML20206L4831999-05-10010 May 1999
SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping
ML20206Q6671999-04-30030 April 1999
Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With
05000338/LER-1999-003, :on 990331,potential Loss of HHSI Pumps, Occurred Due to Postulated Main CR Fire.Caused by Incomplete Understanding of Time Sensitivity of Actions Required to Avoid Potential Loss.Procedure Revised.With1999-04-27027 April 1999
- on 990331,potential Loss of HHSI Pumps, Occurred Due to Postulated Main CR Fire.Caused by Incomplete Understanding of Time Sensitivity of Actions Required to Avoid Potential Loss.Procedure Revised.With
ML20206C0151999-04-22022 April 1999
Safety Evaluation Supporting Amends 219 & 200 to Licenses NPF-4 & NPF-7,respectively
ML20205S0391999-04-21021 April 1999
SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii)
ML18152B6451999-04-13013 April 1999
SER Accepting Util Reactor Pressure Vessel Fluence Methodology for Surry Power Stations,Units 1 & 2 & North Anna Power Station,Units 1 & 2 Subject to Listed Limitations
ML20205K3041999-03-31031 March 1999
Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With
05000338/LER-1999-002, :on 990213,isolation Valve Was Unsecured. Caused by Valve Configuration.Unsecured Valve Verified to Be Closed & Chain & Lock Placed in Manner That Would Secure Valve Tee Handle.With1999-03-11011 March 1999
- on 990213,isolation Valve Was Unsecured. Caused by Valve Configuration.Unsecured Valve Verified to Be Closed & Chain & Lock Placed in Manner That Would Secure Valve Tee Handle.With
ML20207H4451999-03-0202 March 1999
Safety Evaluation Supporting Amends 218 & 199 to Licenses NPF-4 & NPF-7,respectively
ML20207K5921999-02-28028 February 1999
Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With
ML20207E1731999-02-18018 February 1999
Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year
05000338/LER-1999-001-01, :on 990106,RCS Leak Rate Missed Surveillance Was Noted.Caused by Computer Malfunction.Computer Malfunction Affecting VCT & Pzr Level Inputs Was Corrected. with1999-01-22022 January 1999
- on 990106,RCS Leak Rate Missed Surveillance Was Noted.Caused by Computer Malfunction.Computer Malfunction Affecting VCT & Pzr Level Inputs Was Corrected. with
ML20205A0241998-12-31031 December 1998
Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With
ML20199C8781998-12-31031 December 1998
Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With
ML20198A3581998-12-10010 December 1998
Safety Evaluation Supporting Amends 216 & 197 to Licenses NPF-4 & NPF-7,respectively
ML20198J5561998-12-0303 December 1998
ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps
ML20198H9541998-12-0303 December 1998
Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant
ML20197G8551998-11-30030 November 1998
Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With
05000338/LER-1998-007-01, :on 981015,3B Casing Cooling Pump Failed to Develop Discharge Pressure & Recirculation.Caused by Air Binding.Subject Pump Was Vented of Air,Started & Tested Satisfactorily.With1998-11-12012 November 1998
- on 981015,3B Casing Cooling Pump Failed to Develop Discharge Pressure & Recirculation.Caused by Air Binding.Subject Pump Was Vented of Air,Started & Tested Satisfactorily.With
ML20196G1381998-11-0303 November 1998
Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit
ML20195D0571998-10-31031 October 1998
Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With
ML20155H0351998-10-30030 October 1998
Safety Evaluation Supporting Amends 215 & 196 to Licenses NPF-4 & NPF-7,respectively
ML20154L0691998-10-14014 October 1998
COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy
ML20155J6911998-10-0909 October 1998
Staff Response to Tasking Memorandum & Stakeholder Concerns
05000338/LER-1998-005-01, :on 980921,safety Valve Setpoints Were Noted Out of Tolerance.Caused by Setpoint Variance.Valves Were Disassembled,Inspected,Repaired as necessary,re-assembled & Tested Satisfactory.With1998-10-0707 October 1998
- on 980921,safety Valve Setpoints Were Noted Out of Tolerance.Caused by Setpoint Variance.Valves Were Disassembled,Inspected,Repaired as necessary,re-assembled & Tested Satisfactory.With
05000338/LER-1998-006-01, :on 980922,ESFA Occurred.Caused by Human Error. Safety Injection Signal Was Reset & Equipment Was Restored to Normal1998-10-0707 October 1998
- on 980922,ESFA Occurred.Caused by Human Error. Safety Injection Signal Was Reset & Equipment Was Restored to Normal
05000339/LER-1998-004-02, :on 980917,reactor Trip Was Noted.Caused by Lightning Strike.Operations Emergency Procedure 2-E-0, RT or SI Was Entered1998-10-0606 October 1998
- on 980917,reactor Trip Was Noted.Caused by Lightning Strike.Operations Emergency Procedure 2-E-0, RT or SI Was Entered
05000339/LER-1998-003-01, :on 980424,multiple Failures Occurred During Functional Testing of RCS Large Bore Snubbers.Cause Unknown. Large Bore Snubbers Replaced.With1998-10-0505 October 1998
- on 980424,multiple Failures Occurred During Functional Testing of RCS Large Bore Snubbers.Cause Unknown. Large Bore Snubbers Replaced.With
ML20154H4001998-09-30030 September 1998
Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With
05000338/LER-1998-004-01, :on 980902,motor Operated Valve Surveillance Was Missed.Caused by Personnel Error.Station Entered 24 H Action of TS 4.0.3 & Station Deviation Rept Was Initiated to Document Condition.With1998-09-22022 September 1998
- on 980902,motor Operated Valve Surveillance Was Missed.Caused by Personnel Error.Station Entered 24 H Action of TS 4.0.3 & Station Deviation Rept Was Initiated to Document Condition.With