ML003716758
ML003716758 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 04/24/2000 |
From: | NRC Region 4 |
To: | |
References | |
-RFPFR | |
Download: ML003716758 (6) | |
Text
JPM- ANO-2-JPM-NRC-PZR02 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 8 DATE:
SYSTEM/DUTY AREA
3.7 SRO:
3.5 KA
REFERENCE:
010 A4.01 APPROVED FOR ADMINISTRATION TO
- RO: X SRO:
X TASK LOCATION
- INSIDE CR:
X OUTSIDE CR:
BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE
SIMULATOR:
Perform LAB:
POSITION EVALUATED
- RO:
SRO:
ACTUAL TESTING ENVIRONMENT
- SIMULATOR:
X PLANT SITE:
LAB:
TESTING METHOD
- SIMULATE:
PERFORM:
X APPROXIMATE COMPLETION TIME IN MINUTES
- 6 Minutes REFERENCE(S):
OP 2103.005 Rev 027-02-0 and AOP 2203.028 EXAMINEE'S NAME
SSN: - -
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN HIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time
Stop Time
Total Time SIGNED__________________________________
DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-PZR02 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.JPM INITIAL TASK CONDITIONS
- 100% Power Operation.
A power escalation has been completed.
Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.
TASK STANDARD
- Spray Valve (2CV-4651)isolated.
THIS IS AN ALTERNATE SUCCESS PATH JPM.
TASK PERFORMANCE AIDS
- OP 2103.005 section 7.0 and AOP 2203.028.
SIMULATOR SETUP
- Run CASE FILE JPM03. This will open 'A' spray valve 100% and trip the breaker when the valve indicates intermediate position.
The following malfunctions/overrides need to be triggered (case file JPM03 will do all of them):
Set T5 file to sprayvlv this will trigger T5 when 2CV-4651 red light is energized.
T5 2CV-4651_
a value = 1.0 T5 2HS-4651-3 false (green light)
T5 2 HS-4651-5 false (red light)
JPM- ANO-2-JPM-NRC-PZR02 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP 'A' spray valve, 2CV-4651." CRITICAL ELEMENTS (C)
- 2, 3, 4, 5 PERFORMANCE CHECKLIST STANDARDS (Circle One) 1.Verify spray valve, 2CV
-4651, isolation valves 2CV
-4655 AND 2CV-4656 are OPEN.
On panel 2C04 verified red lights ON, green lights OFF for 2CV
-4655 and 2CV-4656. N/A SAT UNSAT (C)2.Place RCP 'A' spray valve MAN/AUTO select switch
(2HS-4651B) to MANUAL.On panel 2C04, rotated 2HS
-4651B in the CCW direction to MANUAL. N/A SAT UNSAT (C)3.Energize all available Backup Heaters.On panel 2C04 placed the following handswitches to ON:
Place 2HS-4643 to ON
Place 2HS-4644 to ON
Place 2HS-4645 to ON
Place 2HS-4646 to ON
AND Observed the red light ON and green light OFF above each of the
above backup heater handswitches.
N/A SAT UNSAT EXAMINER'S NOTE:
When 2CV-4651 is taken to open, the valve will open 100% and then trip the breaker.(C)4.Open 2CV-4651, RCP 'A' spray valve partially.
On panel 2C04 WHEN RCS pressure starts increasing, throttled 2CV
-4651 to the open position.
N/A SAT UNSAT EXAMINER'S NOTE:
The following step may be completed after entering the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM.
JPM- ANO-2-JPM-NRC-PZR02 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)(C)5.Close PZR Spray Block Valves.
On panel 2C04, placed handswitch for 2CV-4655 and 2CV-4656 to "CLOSE".Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-
4656. N/A SAT UNSAT END JPM- ANO-2-JPM-NRC-PZR02 PAGE 5 OF 6 JOB PERFORMANCE MEASURE QUESTION: ANSWER:
JPM- ANO-2-JPM-NRC-PZR02 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
100% Power Operation.
A power escalation has been completed. Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.
INITIATING CUE:
The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP 'A' spray valve, 2CV-4651
."