MONTHYEARML22076A0502022-03-17017 March 2022 and Salem Generating Station, Units 1 and 2 - Annual Property Insurance Status Report LR-N21-0015, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2021-03-25025 March 2021 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N19-0014, Stations - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2019-03-25025 March 2019 Stations - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N18-0041, Annual Property Insurance Status Report2018-04-0505 April 2018 Annual Property Insurance Status Report RS-17-045, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2017-03-30030 March 2017 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N17-0043, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2017-03-29029 March 2017 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N17-0041, Annual Property Insurance Status Report2017-03-24024 March 2017 Annual Property Insurance Status Report LR-N16-0043, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-02-29029 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) LR-N15-0167, PSEG Nuclear Llc'S Fifth Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA2015-08-26026 August 2015 PSEG Nuclear Llc'S Fifth Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12 NL-15-1620, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-26026 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) LR-N15-0048, Salem, Units 1 and 2, Hope Creek - Annual Property Insurance Status Report2015-03-30030 March 2015 Salem, Units 1 and 2, Hope Creek - Annual Property Insurance Status Report ML15089A4262015-03-30030 March 2015 Annual Property Insurance Status Report LR-N15-0023, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)2015-02-18018 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) ML15051A2702015-02-18018 February 2015 PSEG Nuclear Llc'S Fourth Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-1 ML15030A2472014-09-22022 September 2014 Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A' ML15030A1632014-09-22022 September 2014 Remedial Action Progress Report First Quarter 2014 ML15030A2422014-09-22022 September 2014 Appendix a, Mass Flux Calculations ML15030A2432014-09-22022 September 2014 Figure 1, Site Location Map ML15030A2442014-09-22022 September 2014 Figure 2, Station Layout Map ML15030A2452014-09-22022 September 2014 Figure 3, Salem Generating Station Layout Map ML15030A2462014-09-22022 September 2014 Figure 4, Station Shallow Groundwater Elevation Contours - February 2014 ML15030A2482014-09-22022 September 2014 Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B' ML15030A2492014-09-22022 September 2014 Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C' ML15030A2502014-09-22022 September 2014 Figure 8,Salem Generating Station Hydrogeologic Cross Section D-D' ML15030A2752014-09-22022 September 2014 Figure 10, Precipitation Measurements ML15030A2962014-09-22022 September 2014 Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014) ML15030A2982014-09-22022 September 2014 Table 06A, Groundwater Tritium Analytical Results for Well AC ML15030A2992014-09-22022 September 2014 Table 06B, Groundwater Analytical Results for Well AC ML15030A3002014-09-22022 September 2014 Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results ML15030A3012014-09-22022 September 2014 Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results ML15030A2512014-09-22022 September 2014 Figure 9, Salem Generating Station Hydrogeologic Cross Section E-E' ML15030A2952014-09-22022 September 2014 Table 04, Groundwater Measurements and Elevations - First Quarter 2014 ML15030A2942014-09-22022 September 2014 Table 03, Effluent Data Tritium Activity ML15030A2842014-09-22022 September 2014 Table 02, Sample Collection Schedule - First & Second Quarter 2014 ML15030A2832014-09-22022 September 2014 Table 01, Well Construction Details ML15030A2822014-09-22022 September 2014 Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2812014-09-22022 September 2014 Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2802014-09-22022 September 2014 Figure 14, Historic Tritium Recovered Through Well Field Operation ML15030A2792014-09-22022 September 2014 Figure 13, Tritium Isoconcentration Map - March 2014 ML15030A2762014-09-22022 September 2014 Figure 11, Station Wind Summary - Q1 2014 LR-N14-0187, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-08-26026 August 2014 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) LR-N14-0033, PSEG Nuclear Llc'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Order Number EA-12-051)2014-02-25025 February 2014 PSEG Nuclear Llc'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Order Number EA-12-051) LR-N14-0027, PSEG Nuclear Llc'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)2014-02-25025 February 2014 PSEG Nuclear Llc'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) LR-N13-0175, PSEG Nuclear Llc'S First Six-Month Status Report for the Salem in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-2013-08-25025 August 2013 PSEG Nuclear Llc'S First Six-Month Status Report for the Salem in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12- LR-N13-0176, PSEG Nuclear Llc'S First Six-Month Status Report for Salem in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)2013-08-25025 August 2013 PSEG Nuclear Llc'S First Six-Month Status Report for Salem in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) RS-13-100, Report on Status of Decommissioning Funding for Reactors2013-04-0101 April 2013 Report on Status of Decommissioning Funding for Reactors LR-N13-0059, NRC Decommissioning Funding Status Report2013-03-26026 March 2013 NRC Decommissioning Funding Status Report LR-N12-0329, PSEG Nuclear Llc'S Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2012-10-31031 October 2012 PSEG Nuclear Llc'S Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) LR-N12-0331, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (EA-12-051)2012-10-31031 October 2012 Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (EA-12-051) LR-N12-0087, Annual Property Insurance Status Report2012-03-21021 March 2012 Annual Property Insurance Status Report 2022-03-17
[Table view] |
Text
_Outside of Scope BRANCH 3 DAILY r" STATUS ST U BOLD items are new Outside of Scope f-ALEM ONE:, Weekend Coverage:
AL 1=(9X)>0.10:
Outside of Scope AFW PiDing Degiradation
Background
- Buried AFW piping to the 12 and 14 S/Gs appears to have significant d The preliminary guided wave inspection results indicatethat the ASME Thepipe is schedule 80 4" inside diameter carbon steel piping with a c applied. The piping run of concern involves about 150 ft of pipe that is the out side of containment to 17 ft deep in a covered area adjacent to kdnfrmnatin in in.accordance with the Fro'orn of Informa!ton Act.Exemptions 5 t'Q-~ssz, ac)n4QS.4119110 tinn UUUI USm .......7 AL2=(2of3)>0.11 AL3=(lX)>0.13 egradation of the protective coating and piping.Class3? piping is degraded bellow minwall.0al tar type coating that appears to been hand buried at depths ranging from 4 ft adjacent to the containment.
- EOC -Unit 2 has greater margin -it is a newer plant and is presumably in better condition; documentation exists that proves the piping was opened and inspected
-16 years ago andfound to be in pristine condition; ISI code gives more allowance to an operating unit (they can take credit for up to 90% of the yield stress). DRS reviewed photographs and has no immediate safety concerns.
There were no similar inspections of Unit 1 AFW piping.* On each unit there are three safety-related systems with buried piping (ASW, SW and control air)o Control air coating in tact, PSEG will document the inspection.
o Control air small leak. PSEG cut out and replaced.
Will evaluate the failure mechanism (believe it was repeatedly stepped on).o No previous UT inspections for service water piping, previously focused on seals for bell and spigot joints (as of end of outage all will have been replaced).
Based on SW piping OE the current concern would be groundwater corrosion of the metal bands between concrete layers.* PSEG evaluating past operability for Unit, 1 using finite element analysis.
Results will be used to determine if MC 0309 entry conditions are met (if-piping was inop needI to perform an MC 0309 review). PSEG determined they have an acceptable bounding analysis Using 0.152" thickness at 1275 psig for Unit 1 and plan to implement an AFW design change through 50,59, PSEG expects the finite element analysis (FEA) to be completed and 3rd party reviewed on 4/19. PSEG will use the FEA results to support past operability for Unit 1, cycle operability for Unit 1, and to determine any need for additional review of the pipe condition at Unit 2.Update as of 4/1`9 atQ0730* Followiwng replacement of about 80 ft of shallow Piping PSEG removdV tehesupports for the piping that was not~replaced and ide~ntified a section under a pipe supolrt clamp th~at was, well below miinimum~
wall (.077). Based on' the this .d~isco6ove&ýQ pSG~lans to replace all the deep pipe and.,the remainder of the shallow pipe on the 14 hea~der, Questions and Concerns* Design change to support 1275 psig* Unit 2 EOC (operability based on differences)
- Replacement plan and schedule Information Needs* Finite element analysis* Past operability review for Unit 1* Operability determination for Unit 2* Design records for as installed piping on Unit 1 & 2* Previous ASME required flow or pressure drop tests for Inits 1 & 2 I I r VuLs Iue ulScp Outside of Scope Status Board Items:.Salem AFW buried piping (PRIORITY)