Withdrawal of an Amendment Request for Extension of Refueling Water Storage Tank Allowed Outage Time
ML11301A034
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/07/2011
From: Mozafari B
Plant Licensing Branch II
To: Jefferson W
Carolina Power & Light Co
Mozafari B
References
TAC ME7039
Download: ML11301A034 (2)


Text

UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 December 7,2011 Mr. William Jefferson, Jr. Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -WITHDRAWAL OF AN AMENDMENT REQUEST FOR EXTENSION OF REFUELING WATER STORAGE TANK ALLOWED OUTAGE TIME (TAC NO. ME7039)

Dear Mr. Jefferson:

By letter dated September 2, 2011 (Agencywide Documents Access and Management System Accession No. ML11255A128), you applied for an amendment to Appendix A, Technical Specifications (TS) of Renewed Facility License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1. The proposed change would have revised the TS to extend the TS 3.1.2.6, "Borated Water Sources-Operating," Action b allowed outage time for restoring an inoperable refueling water storage tank (RWST) to operable status from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 7 days; and to extend the TS 3.5.4, "Refueling Water Storage Tank," action for restoring an inoperable RWST to operable status from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 7 days when performing purification in Modes 1 -4. Subsequently, by letter dated October 27,2011, you withdrew the amendment request. The purpose of this letter is to advise that the above-cited application is being treated as withdrawn.

Notice of consideration of issuance of the proposed amendment had not been published in the Federal Register.

Please feel free to contact me at 301-415-2020 or bye-mail to Brenda.Mozafari@nrc.gov if you have any questions.

Sincerely, IRA by EBrown forI Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 cc: Distribution via Listserv December 7, 2011 Mr. William Jefferson, Jr. Vice President Carolina Power &Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -WITHDRAWAL OF AN AMENDMENT REQUEST FOR EXTENSION OF REFUELING WATER STORAGE TANK ALLOWED OUTAGE TIME (TAC NO. ME7039)

Dear Mr. Jefferson:

By letter dated September 2, 2011 (Agencywide Documents Access and Management System Accession No. ML11255A128), you applied for an amendment to Appendix A, Technical Specifications (TS) of Renewed Facility License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1. The proposed change would have revised the TS to extend the TS 3.1.2.6, "Borated Water Sources-Operating," Action b allowed outage time for restoring an inoperable refueling water storage tank (RWST) to operable status from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 7 days; and to extend the TS 3.5.4, "Refueling Water Storage Tank," action for restoring an inoperable RWST to operable status from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 7 days when performing purification in Modes 1 -4. Subsequently, by letter dated October 27,2011, you withdrew the amendment request. The purpose of this letter is to advise that the above-cited application is being treated as withdrawn.

Notice of consideration of issuance of the proposed amendment had not been published in the Federal Register.

Please feel free to contact me at 301-415-2020 or bye-mail to Brenda.Mozafari@nrc.gov if you have any questions.

Sincerely, IRA by EBrown forI Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 cc: Distribution via Listserv Distribution:

PUBLIC Lp12-2 R/F RidsNrrDorlLpl2-2 RidsOgcRp RidsNrrDorlDpr RidsNrrLACSola RidsNrrPMShearonHarris RidsRgn2MailCenter RidsAcrsAcnw

_MaiICTR ADAMS Accession No'.. ML11301A034 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC LPL2-21PM NAME BMozafari CSoia DBroaddus BMozafari (EBrown for) DATE 11/16/11 11/15/11 12106111 12/07/11 OFFICIAL RECORD COPY