ML18016A222

From kanterella
Revision as of 06:52, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Application for Amend to License NPF-63,revising TS 3/4.8.1, AC Sources - Operating & Associated Bases to Clarify Intent of Ts,Per NUREG-1431,Rev 1
ML18016A222
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/29/1997
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18016A223 List:
References
RTR-NUREG-1431 HNP-97-164, NUDOCS 9711030256
Download: ML18016A222 (5)


Text

CATEGORY 1~REGULRT(N INFORMATION DISTRIBUTION STEM (RIDE)ACCESSION-NBR:9711030256

, DOC.DATE: 97/10/29 NOTA'RIZED:

YES FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.

Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control.Branch (Document Control Desk)DOCKET 05000400

SUBJECT:

Application for amend to License NPF-63,revising TS 3/4.8.1,"AC Sources-Operating" a associated bases to clarify intent of TS,per NUREG-1431.

DISTRIBUTION CODE: ROOZD COFZES RECEIVED:LTR i ENCL J SIZE: TITLE: OR Submittal:

General Distribution NOTES:Application for permit renewal filed.05000400 E RECIPIENT ID CODE/NAME PD2-1 LA ROONEY,V INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 RECIPIENT ID CODE/NAME PD2-1 PD FILE CENTER 1 NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1 1 1 1 1'1 1 1 1 1 1 D U E N NOTE TO ALL MRIDS" RECIPlENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

'N Carolina Power&Light Company PO Box 165 New Hill NC 27562 William R.Robinson Vice President Harris Nuclear Plant OCT 28>SS7 SERIAL: HNP-97-164 10 CFR 50.90 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT TECHNICAL SPECIFICATION 3/4.8.1, A.C.SOURCES-OPERATING

Dear Sir or Madam:

In accordance with the Code of Federal Regulations, Title 10, Part 50.90, Carolina Power&Light Company (CP&L)requests a revision to the Technical Specifications (TS)for the Harris Nuclear Plant (HNP).The proposed amendment revises TS 3/4.8.1,"A.C.Sources-Operating" and associated Bases to clarify the intent of this TS.This change is consistent with NUREG-1431, Revision 1,"Standard Technical Specifications, Westinghouse Plants," dated April 1995.Specifically, the proposed amendment revises the following action statements:

TS 3.8.1.1.a.3, TS 3.8.1.1.b.4, and TS 3.8.1.1.d.2 and associated Bases.Enclosure 1 provides a description of the proposed changes and the basis for the changes.Enclosure 2 details, in accordance with 10 CFR 50.91(a), the basis for the Company's determination that the proposed changes do not involve a significant hazards consideration provides an environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).

Therefore, pursuant to 10 CFR 51.22(b), no environmental assessment is required for approval of this amendment request.Enclosure 4 provides page change instructions for incorporating the proposed revisions. provides the proposed Technical Specification pages.9'7ii030256 97i02'P PDR ADOCK 05000400 P PDR~h AA(4sO IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 5413 Shearon Harris Road New Hill NC Tel 919 362-2502 Fax 919 362-2095 Document Control Desk HNP-97-164/

Page 2 COL.requests that.the proposed amendment be issued such.that implementation will occur'-within 60 days of issuance'to allow time for'procedure revision and'orderly incorporation into copies of the Technical Specifications.

Please refer any questions regarding this submittal to Mr.J.H.Eads at (919)362-2646.S'rely, MSE/mse

Enclosures:

1.Basis for Change Request 2.10 CFR 50.92 Evaluation 3.Environmental Considerations 4.Page Change Instructions 5.Technical Specification Pages W.R.Robinson W.R.Robinson, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief;and the sources of his information are employees, contractors, and agents of Carolina Power 8c Light Company.My commission expires:~-g Mr.J.B.Brady, NRC Sr.Resident Inspector Mr.Mel Fry, Acting Director, N.C.DEHNR Mr.V.L.Rooney, NRC Project Manager Mr.L.A.Reyes, NRC Regional Administrator Notary (al)~~~f OZ Rl5~~~4'.Ygq~~"~~PUBLIC aP~<taessc4<~~

Document Control Desk HNP-97-164/

Page 3 bc: Ms.D.B.Alexander Mr.H.K.Chernoff (RNP)Mr.B.H.Clark Mr.G.W.Davis Mr.J.W.Donahue Mr.O'.J.Dorman (BNP)Mr.W.D.Johnson Mr.H.W.Habermeyer, Jr.Mr.W.J.Hindman'r.

R.M.Krich Ms.W.C.Langston (PE8cRAS File)Mr.R.D.Martin Mr.W.S.Orser Mr.D.L.Tibbitts Mr.C.A.VanDenburgh Nuclear Records File: HNP Licensing File: H-X-0511