ML18219D832

From kanterella
Revision as of 13:28, 16 August 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Confirming Verbal Report on 2/23/1978, Concerning Both Engineered Safeguard Fans Were Inoperable for a Period of 3 Hours & 14 Minutes
ML18219D832
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/23/1978
From: Shaller D
Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co), American Electric Power Service Corp, American Electric Power Company
To: James Keppler
NRC/RGN-III
References
Download: ML18219D832 (3)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM<RIDS), DISTRIBUTION FOR INCOMING MATERIAL 50-315 REC: KEPPLER J G NRC ORG: SHALLER D V IN 8(MI PWR DOCDATE: 02/23/78 l3ATE RCVD: 02/27f 78 COPIES RECEIVED LTR 1 ENCL 0 DOCTYPE: I ETTER NOTARIZED:

NO

SUBJECT:

CONFIRMING VERBAL REPT TO NRC ON 02/23/78 CONCERNING BOTH ENGINNERED SAFEGUARD FANS WERE INOPERABLE FOR A PERIOD OF THREE HOURS AND 14 MINUTES...

ADVISING FOLLOWUP REPT WILL BE SUBMITTED BY 03/07/78.PLANT NAME: COOK-UNIT 1 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL: DISTRIBUTION OF'THIS MATERIAL IS AS FOLLOWS+++++>>>>+>>>>>>>+

INCIDENT REPORTS (DISTRIBUTION CODE AQ02)FOR ACTION: BR (4+LTR ONLY<4)INTERNAL: FXTERNAL: REG FILE+~~l TR ONLY(SCHROEDER/IPPOLITQ~4~LTR ONLY(1)NOVAK/CHECK++LTR ONLY(i>KNIGHT4+LTR ONLY<1)HANAUER~HILTR ONLY(l>EISENHUT++LTR ONLY(i)SHAO++LTR ONLY(l)KREGER/J.COLLINS<+LTR ONLY<1)K SEYFRIT/IE+~LTR QNLY(i)LPDR'S ST.JQSEPHr MI++LTR ONLY<1)TI C+4~LTR ONLY (1>NSIC<+LTR ONLY<1)ACRS, CAT B++LTR ONLY(16>NRC PDR%%LTR ONLY<1)MIPC+~LTR ONLY(3)HOUSTON~~+I.

TR ONLY<1)GRIMES++LTR ONLY'(1>BUTLER+4LTR ONLY(3.)TEDESCO+4ILTR ONLY(i>BAER44LTR ONLY<i)VOLLMER/BUNCH++LTR ONLY(1>ROSA++LTR ONLY (1)COPIES ViOT REGULATORY SURIIITTED PER I GUIDE 10.1 DISTRIBUTION:

LTR 45 ENCL 0 SIZE:%4M%%%%%%%%%%%%4%%%%8M%4%%%%0F+0FRM%%

THE ENI3 CONTROL NBR: 780590041 4h-f 0 a~b II'I 8 g 8~~srksn~ecerio swor y SEC III:I",uZ~IIZV I.,'"!:Zjl

~II..gIIIIt IIIIDIAItIA 8 NICHIGAN PONEB COPSPAiJJY DONALD C.COOK NUCLEAR PLANT P.O.Box 458, Bridgman, Michigan 49106 February 23, 1978 Nr.J.G.Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Hr.Keppler:

iso Pj l rg)ly 8'perating License DPR-58 Docket No.50-315 This is to confirm our verbal report to NRC Region III Inspector, Hr.K.R.Baker, at 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on February 23, 1978.At that time we reported that both Engineered Safeguard Fans were inoperable for a period of three hours and 14 minutes.A followup report will be submitted by Harch 7, 1978, as required by Regulatory Guide 1.16, Revision 4, Section 2.a.Sincerely, D.Y.Shaller Plant Hanager/bab cc: J.E.Dolan R.ll.Jurgensen G.E.Lien R.Kilburn R.J.Yollen BPI K.R.Baker RO:III R.C.Callen HPSC P.H.Steketee, Esq.R.Halsh, Esq.G.Charnoff, Esq.G.Olson J.H.Hennigan PNSRC J.F.Stietzel Dir., IE (40 copies)Dir., NIPC (4 copies)78O59004i o.'