ML053490198

From kanterella
Revision as of 12:08, 29 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Initial Examination Corporate Notification Letter No. 50-225/OL-06-01, Rensselaer Polytechnic Institute
ML053490198
Person / Time
Site: Rensselaer Polytechnic Institute
Issue date: 12/22/2005
From: Eresian W J
NRC/NRR/ADRA/DPR/PRTA
To: Stephens J
Rensselaer Polytechnic Institute
Eresian W, NRC/NRR/DPR/PRTA, 415-1833
Shared Package
ML053490190 List:
References
50-225/OL-06-01 50-225/OL-06-01
Download: ML053490198 (9)


Text

December 22, 2005Mr. Jonathan Stephens6 Garrison Lane Ballston Lake, NY 12019

SUBJECT:

INITIAL EXAMINATION CORPORATE NOTIFICATION LETTERNO. 50-225/OL-06-01, RENSSELAER POLYTECHNIC INSTITUTE

Dear Mr. Stephens:

We have made arrangements for the administration of operator licensing examinations at theRensselaer Polytechnic Institute reactor. The examinations are scheduled for the week of February 6, 2006.In order to meet this schedule, please furnish the material listed in Enclosure 1, "ReferenceMaterial for Reactor/Senior Reactor Operator Licensing Examinations (Non-Power)" at least 60 days prior to the examination date to the following address: (U.S. Postal Service)(Overnight Delivery)U.S. Nuclear Regulatory CommissionU.S. Nuclear Regulatory Commission ATTN: Warren EresianATTN: Warren Eresian Mail Stop O-12 G-13Mail Stop O-12 G-13 Washington, D.C. 2055511555 Rockville PikeRockville, MD 20852-2738Enclosure 2, "Facility Licensee Responsibilities for Written Examinations, describes yourresponsibilities for conducting written examinations. Enclosure 3 "Candidate Responsibilitiesfor the Written Examination" describes applicant responsibilities during the administration of thewritten examination. Please ensure that all applicants are aware of these rules. Your review of the written examination will be conducted in accordance with the proceduresspecified in Enclosure 4, "Facility Review of Written Examinations." Finally, signed senior reactor operator license applications certifying that all training has beencompleted must be submitted at least 14 days before the first examination dates. This will allow the chief examiner time to review the training and experience of the candidates, process the medical certifications, and process the applications. If the review cannot be completed in time to determine an applicant's eligibility, that applicant may not be permitted to sit for theexamination. Therefore, it is recommended that license applications be provided as soon aspossible to ensure an appropriate level of review. The NRC has copies of the applicationforms Personal Qualification Statement -- Licensee (NRC form 398) and Certificate of MedicalHistory by Facility Licensee (NRC form 396) available on the Internet in Adobe Acrobatformat. The forms are located at www.nrc.gov/reading-rm/doc-collections/forms/ nrc 398.pdf and www.nrc.gov/reading-rm/doc-collections/forms/nrc396.pdf respectively.

Mr. Jonathan Stephens This request is covered by Office of Management and Budget (OMB) Clearance Number3150-0018, which expires June 30, 2006. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send commentsregarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records Branch, (T-6 E-6), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to

<bjs1@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.If you have any questions regarding the examination procedures and requirements, pleasecontact me at 301-415-1833, or Internet e-mail wje@nrc.gov.Sincerely, /RA/Warren J. Eresian, Chief ExaminerResearch and Test Reactors Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-225

Enclosures:

1.Reference Material for NRC Operator Licensing Examinations 2.Facility Licensee Responsibilities for Written Examinations3.Applicant Responsibilities for Written Examinations4.Facility Review of Written Examinations Prior to Administration Mr. Jonathan Stephens This request is covered by Office of Management and Budget (OMB) Clearance Number3150-0018, which expires June 30, 2006. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send commentsregarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records Branch, (T-6 E-6), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to

<bjs1@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.If you have any questions regarding the examination procedures and requirements, pleasecontact me at 301-415-1833, or Internet e-mail wje@nrc.gov.Sincerely, /RA/Warren J. Eresian, Chief ExaminerResearch and Test Reactors Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-225

Enclosures:

1.Reference Material for NRC Operator Licensing Examinations (Non-Power)2.Administration of Written Examinations 3.Procedures for Administration of Written Examinations4.Facility Review of Written Examinations Prior to AdministrationDISTRIBUTION

PUBLICPRTA r/f BThomas Facility File (EBarnhill) O-6 F-2WEresianMarvin Mendonca, PM ADAMS ACCESSION #: ML053490198TEMPLATE #: NRR-079OFFICE:PRTA:CEDIRF/IROB:LAPRTA:BCNAME:WEresianEBarnhillBThomasDATE:12/15/200512/21/200512/22/2005C = COVERE = COVER & ENCLOSUREN = NO COPYOFFICIAL RECORD COPY ENCLOSURE 1REFERENCE MATERIAL FOR NRC OPERATORLICENSING EXAMINATIONS (NON-POWER)1.Training materials should include all substantive written material used for preparingapplicants for initial RO and SRO licensing. The written material should include learning objectives if available and the details presented during lectures, rather than outlines. Training materials should be identified, bound, and indexed. Training materials should include the following: System descriptions including descriptions of all operationally relevant flowpaths, components, controls and instrumentation. System training material should draw parallels to the actual procedures used for operating and applicable system. Complete and operationally useful descriptions of all safety-system interactions,secondary interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure. Training material used to clarify and strengthen understanding of emergencyoperating procedures. 2.Complete Procedure Index (including temporary procedures).

3.All administrative procedures as applicable to reactor operation or safety.

4.All integrated plant procedures, normal or general operating procedures and procedures forexperiments. 5.All emergency procedures, emergency instructions, abnormal or special procedures.

6.Standing orders or procedures changed by reactor supervision and important orders orchanges that are safety related and may supersede the regular procedures. 7.Applicable procedures (procedures that are run frequently).

8.Fuel-handling and core-loading procedures and initial core-loading procedure, whenappropriate. 9.Any annunciator/alarm procedures, as applicable. 10.Radiation protection manual, radiation control manual or procedures.

11.Emergency plan implementing procedures.

12.Safety Analysis Report, Technical Specifications and interpretations, if available.

13.System operating procedures, including experiments.

14.Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams, asapplicable. 15.Technical Data Book, and/or plant curve information as used by operators and facilityprecautions, limitations, and set points for the facility. 16.Questions and answers specific to the facility training program which may be used in the writtenor operating examinations (voluntary by facility licensee). 17.Additional material as requested by the examiners to develop examinations that meet therequirements of the Non-power Reactor Examiner Standards and Regulations. The above reference material should be approved final issues and so marked. If a facility hasnot finalized some of the material, the Chief Examiner should verify with the facility that themost complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination.

ENCLOSURE 2FACILITY LICENSEE RESPONSIBILITIES FOR THE WRITTEN EXAMINATION1.The facility licensee is responsible for providing a single room for the administration of thewritten examination. The location of this room and supporting restroom facilities should besuch as to prevent contact with all other facility personnel during the written examination. 2.Minimum spacing is necessary to ensure examination integrity as determined by the ChiefExaminer (i.e., one applicant per table, with a three-foot space between tables). 3.The facility may make arrangements subject to chief examiner review, if the applicants areto have lunch, coffee or other refreshments. These arrangements shall comply with Item 1 above.4.The facility licensee may provide pads of 8-1/2 by 11 inch lined paper in unopened packagesfor each applicant's use in completing the examination. The examiner will distribute these pads to the applicants as needed. 5.Applicants may bring pens, pencils, calculators and slide rules into the examination room. Only black ink or dark pencils should be used for writing answers to questions. 6.The Chief Examiner must approve any wall charts, models, or other training materialspresent in the examination room. No other equipment or reference material will be allowedunless provided by the examiner. 7.The facility staff will be provided a copy of the written examination with answer key at thebeginning of the administration of the written examination. The facility staff may startreviewing the examination immediately. The facility staff will then have five (5) working daysto provide formal written comments with supporting documentation regarding written examination questions and answers to the Chief Examiner. Please NOTE: All arrangements are subject to Chief Examiner review.

ENCLOSURE 3CANDIDATE RESPONSIBILITIES FOR THE WRITTEN EXAMINATION1.You must provide a picture identification. 2.You must not review your examination until instructed to do so by the examiner/proctor.

3.Cheating on the examination means an automatic denial of your application and could resultin more severe penalties. 4.When you have completed your examination, you must sign the statement at the bottom ofthe cover sheet, prior to handing in the examination to the examiner/proctor.5.Only one applicant may leave the room for a trip to the restroom. You must avoid allcontact with anyone outside the examination room to avoid even the appearance or possibility of cheating. NOTE: The examiner/proctor may modify this requirement to onlyone applicant of each sex.6.Use black ink or dark pencil only to facilitate legible reproductions. 7.Print your name in the blank provided in the upper right-hand corner of the examinationcover sheet and each answer sheet. 8.Mark your answers on the answer sheet provided.

9.The point value for each question is shown in [brackets] after the question. 10.If the intent of a question is unclear, ask questions of the examiner only.

11.When turning in your examination, assemble the completed examination with examinationquestions, examination aids and answer sheets. In addition, turn in all scrap paper. 12.You must achieve a grade of 70 percent or greater in each category to pass theexamination. 13.There is a time limit of one hour per section of the examination. A one section examinationhas a one hour time limit, a two section examination has a two hour time limit and a three section examination has a three hour time limit.14.After turning in your examination, leave the examination area (DEFINE THE AREA). If youare observed in this area while the examination is still in progress, your license may be denied or revoked.

ENCLOSURE 4FACILITY REVIEW OF WRITTEN EXAMINATIONS PRIOR TO ADMINISTRATION1.At the option of the Program Director, New, Research and Test Reactors (RNRP), thefacility may review the written examination up to two weeks prior to its administration. This review may take place at the facility or at an NRC office. The Chief Examiner will coordinate the details of the review with the facility. An NRC examiner will always be present during the review. The examination or written notes will NOT be retained by thefacility. Whenever this option of examination review is utilized, the facility reviewers will sign thefollowing statement prior to being allowed access to the examination. a.Pre-Examination Security AgreementI ______________________ acknowledge that I have acquired specialized knowledgeconcerning the examination scheduled for _________________ at

___________________ as of the date of my signature below. I agree that I will notknowingly divulge any information concerning this examination to any unauthorized persons. I understand that I am not to participate in any instruction involving those applicants scheduled to be administered the above examination from this date until after the examination has been administered. I further understand that violation of the conditions of this agreement may result in the examinations being cancelled and/or enforcement action against myself or the facility licensee by whom I am employed orrepresent.

______________________________________Signature/DateIn addition, the facility staff reviewers will sign the following statement after the writtenexamination has been administered. b.Post-Examination Security Agreement I _________________ did not, to the best of my knowledge, divulge any informationconcerning the examinations administered during the week of

____________________________ at ____________________ or any instruction to those applicants who were administered the examination from the date I entered intothis security agreement until the completion of examination administration.

__________________________________ Signature/Date 2.Regardless of whether the above examination review option is exercised, immediatelyfollowing the administration of the written examination, the facility staff is provi ded amarked-up copy of the examination and the answer key. The copy of the written examination includes pen and ink changes made to questions during the examination administration. If the facility did not review the examination prior to its administration, they will have five (5)working days from the day of the written examination to submit formal comments. If the facility reviewed the examination prior to its administration, any additional comments mustbe given to an examiner prior to his/her leaving the facility. These comments will be addressed to the Chief Examiner by the Reactor Supervisor. Comments not submitted within the required time frame will be considered for inclusion in the grading process on acase-by-case basis. This may cause delays in grading the examinations.3.The following format should be used for submittal of specific comments: a.Listing of NRC question, answer and referenceb.Facility comment/recommendationc.Reference (to support facility comment)NOTES:1.No change to the examination will be made without a reference to support thefacility comment. Any supporting documentation that was not previouslysupplied, should be provided. 2.Comments made without a concise facility recommendation will not beaddressed. 3.A two-hour post examination review may be held at the discretion of the ChiefExaminer. If this review is held, the facility staff should be informed that onlywritten comments that are properly supported will be considered in the grading ofthe examination.