Response to Request for Information: Operator Licensing Examination Data
ML072990069
Person / Time
Site: Pilgrim
Issue date: 10/18/2007
From: Bethay S J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.07.083, RIS-07-017
Download: ML072990069 (3)


Text

S'En tergy--Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Stephen J. Bethay Director, Nuclear Assessment October 18, 2007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

SUBJECT:

Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Response to Request for Information:

Operator Licensing Examination Data LETTER NUMBER: 2.07.083

Dear Sir or Madam:

On July 12, 2007, the NRC issued Regulatory Issue Summary (RIS) 2007-17, "Preparation and Scheduling of Operator Licensing Examinations." This RIS requested information from licensees regarding proposed licensed operator examinations schedules and estimated number of applicants in order to assist the NRC in planning resources.

Accordingly, enclosed is the requested information on the completed NRC Form 536.There are no commitments contained in this letter.Please contact me at (508) 830-7800, if there are any questions regarding this subject.Sincerely, Stephen J. Bethay Director, Nuclear Assessment MJG/dl

Enclosure:

Completed NRC Form 536 cc: Mr.. Samuel J. Collins:,Regional Administrator, Region.I U.S.. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station Enclosure to ENO Letter 2.07.083 Completed NRC Form 536 (1 page)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch 5 3), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Entergy, Pilgrim Nuclear Power Station One A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09 CY 11 CY CY ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 11 CY CY NUMBER OF REACTOR 3 6 OPERATORS NUMBER OF SENIOR REACTOR 8 4 ,OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR 2 OPERATORS

-UPGRADE NUMBER OF SENIOR REACTOR 0 OPERATORS

-LIMITED PROPOSED DATES PRIMARY DATE 03/23/2009 01/21/2011 ALTERNATE DATE 03/30/2009 01/28/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 07 CY 09 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0. 0 0 12 CANDIDATES NRCýFORM.536 (8-2005)PRINTED ON RECYCLED PAPER