ML17313A189

From kanterella
Revision as of 22:25, 14 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Suppl 1 to Special Rept 2-SR-97-01, SG Eddy Current Exam Seventh Refueling Outage, Sept 1997.Suppl Being Submitted to Provide Complete Results of SG Tube ISI
ML17313A189
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/25/1998
From: OVERBECK G R
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17313A190 List:
References
192-01009-GRO-D, 192-1009-GRO-D, 2-SR-97-001-01, 2-SR-97-1-1, NUDOCS 9802040419
Download: ML17313A189 (6)


Text

CATEGORY j.REGULA Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESSION NBR:9802040419 DOC.DATE: 98/01/25 NOTARIZED:

NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATION OVERBECK,G.R.

Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Dopument Control Branch (Document Control Desk)

SUBJECT:

Forwards suppl 1 to'Special Rept 2-SR-97-01,"SG Eddy Current Exam Seventh Refueling Outage," Sept 1997.Suppl being submitted to provide complete results of SG tube ISI.DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR L.ENCL J SIZE: 2+TITLE: OR Submittal:

Inservice/Testing/Relief from ASME Code-GL-89 NOTES:Standardized plant.2 A-04 0500052+RECIPIENT ID CODE/NAME PD4-2 LA CLIFFORD,J COPIES RECIPIENT LTTR ENCL'D CODE/NAME 1 1 PD4-2 PD 1 1 COPIES LTTR ENCL 1 1 INTERNAL: ACRS, CENTE 0'UDOCS-BSTRACT RES/DET/EIB EXTERNAL: LITCO ANDERSON NRC, PDR 1'1 1 1 1 1 1 1 1 1 1 AEOD/SPD/RAB NRR/DE/EMEB OGC/HDS2 RES/DET/EMMEB NOAC 1 1 1 1 1 0 1 1 1 1 D j 0 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 l T,E Cenm//ment.

Innntmrlnn.

&erpy.Palo Verde Nuclear Generating Station Gregg R.Overbectr Vice President Nuclear Production TEL 602/3934148 FAX 602/3934077 Mail Station 7602 P.O.Box 52034 Phoenix, AZ 85072-2034 192-01009-GRO/DGM/KR January 25, 1998 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, D.C.20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Unit 2 Docket No.STN 50-529 (License No.NPF-51)Special Report 2-SR-97-001-01.

Attached please find Supplement 1 to Special Report 2-SR-97-001 prepared and submitted pursuant to Technical Specifications (TS)Surveillance Requirement 4.4.4.5.b and TS 6.9.2.This supplement is being submitted to provide the complete results of the Steam Generator Tube Inservice Inspection.

A copy of the Special Report is being forwarded to the Regional Administrator, NRC Region IV.If you have any questions, please contact Daniel G.Marks, Section Leader, Nuclear Regulatory Affairs, at (602)393-6492.Sincerely, GRO/DGIVI/KR/mah Attachment cc: E.W.Merschoff (all with attachment)

K.E.Perkins J.H.Moorman J.W.Clifford IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

()."t g 1 98020404i9 980i25 PDR ADQCK 05000529 PDR

ATTACHMENT