|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] |
Text
ACCESSION NBR:9906220113 DOC.DATE: 99/06/15 NOTARIZED:
NO DOCKET FAQIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUgH.NAME AUTHOR AFFILIATION LEV'INE,J.M.
Arizona Public Service Co.(formerly Arizona Nuclear Power RECZP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)C
SUBJECT:
Forwards response to re GL 96-05,"Periodic Verification of Design-Basis Capability of Safetyy-Related MOVs".No A commitments being made to NRC by ltr.T DISTRIBUTION CODE: A073D COPIES RECEIVED:LTR ENCL SIZE: TITLE: GL-96-05 Periodic Verif.of Design Basis Capability of Sa ety-Related E NOTES: STANDARDIZED PLANT Standardized plant.Standardized plant.05000528@05000529 05000530~RECIPIENT ID CODE/NAME LPD4-2 COPIES LTTR ENCL 1 1 RECIPIENT'ID CODE/NAME FIELDS,M COPIES LTTR ENCL 1 1 INTERNA C FILE CENTER NRR/HANSEN, RES/DST EXTERNAL: NOAC 01 1 1 1 1 1 1 1 1 1 1 AEOD/SOD/RAB NRR/DE/EMEB RES/DET/EZB/B RES/DST/PRAB NRC PDR 1 1 1 1 1 1 1 1 1 1 D 0'E NOTE TO ALL nRIDSn RECIPIENTS PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COP1ES RECE1VED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OP COPIES REQUIRED: LTTR 12 ENCL 12 4l~I~4 Palo Verde Nuclear Generating Station James M.Levine Senior Vice President Nuclear TEL (602)393-5300 FAX (602)393-6077 Mail Station 7602 P.O.Box 52034 Phoenix, AZ 85072-2034 102-04295-JML/SAB/JAP June 15, 1999 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
Reference:
1.Request for Additional Information, Letter dated March 17, 1999, Fields (NRC)to Levine (APS)
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Reponse to Request for Additional Information Regarding Generic Letter 96-05 Reference 1 requested APS to provide additional information to complete the GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, review for the Palo Verde Nuclear Generating Station.Enclosed is APS'esponse to your request for additional information.
No commitments are being made to the NRC by this letter.If you have any questions, please contact Scott A.Bauer at (623)393-5421.Sincerely, JML/SAB/JAP/mah Enclosure cc: E.W.Merschoff M.B.Fields J.H.Moorman 9906220iiS 9906i5 PDR ADQCK 05000528 P PDR Ct' ENCLOSURE RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 96-05, PERIODIC VERIFICATION OF DESIGN-BASIS CAPABILITYOF SAFETY-RELATED MOTOR-OPERATED VALVES 0>I I.t
~Each of the questions from the RAI is repeated below, followed by the APS response: In NRC Inspection Report No.50-528;,529,&.530/96-15, the NRC staff closed its review of the motor-operated valve (MOV)program implemented at the Palo Verde Nuclear Generating Station (Palo Verde)in response to.Generic Letter (GL)89-10,"Safety-Related Motor-Operated Valve Testing and Surveillance." In the inspection report, the NRC staff noted certain aspects of the licensee's MOV program that would be addressed over the long term.For example, the NRC staff noted that the licensee (1)had not completed its documentation of the final data reconciliation that forms the basis for GL 89-10 program completion; (2)intended to justify its use of hydrostatic testing.to determine valve-specific performance in the final program documentation; and (3)intended to revise the diagnostic test acceptance criteria to evaluate unwedging capability, extrapolated to design-basis conditions.
The licensee should describe the actions taken to address the specific long-term, aspects of the MOV program at Palo Verde that were noted in the NRC inspection report.APS Response: (1)The final data reconciliation is documented in Engineering Study 13-MS-B07.
The purpose of this study was to validate the design basis performance parameter bounding values used as inputs to Calculation 13-JC-ZZ-201,"MOV Thrust, Torque, and Actuator Sizing Calculation" for calculating the Generic Letter 89-10 MOVs'hrust/torque requirements to operate under design basis conditions.
This study documents.
the test data used as the basis to validate the performance parameter bounding value.(2)Valve Factor assumptions in some cases utilize test data acquired under hydrostatic differential pressure (DP)test conditions.
In this type of test, the valve is positioned closed and the upstream side of the disc is pressurized relative to the downstream of the disc.Diagnostic test results show a dynamic loading region, following unwedging, during which time the disc is stroking against the differential pressure.From this dynamic loading region a Valve Factor value is determined, and in some cases, applied to flowing dynamic conditions for determining the minimum thrust requirement to overcome the DP.Figure 2-18 of EPRI Report TR-103229-V1 compares the friction coefficients determined under hydrostatic DP.conditions to those determined under flowing conditions.
A best-fit line of the data illustrates the close similarity between the results using the two different test methods for determining friction coefficients.
Based upon this comparison, use of hydrostatic data as the test basis for the opening Valve Factor is justified.
(3)'A design allowable unwedging thrust limit has been developed and applied to GL 89-10 gate valves.The design allowable unwedging,thrust limit is based on the limiting thrust/torque rating of the Motor Operated Valve (MOV)valve, actuator or motor.The 4>ll I*
~valve and actuator torque limits are based on the vendor stress/weak link reports.By adjusting the design allowable unwedging thrust limit for test equipment and transducer error, a controlled static unwedging setpoint is established to check against the unwedging thrust during static testing of MOVs.In a letter dated March 18, 1997, in response to GL 96-05, the licensee reported that (1)actuator output degradation margin would not be included for MOVs that use the Electric Power Research Institute's (EPRI)MOV Performance Prediction Model (PPM);and (2)that MOVs with large calculated margins would not be dynamically tested in the future and would not have any additional valve degradation margin added to the design-basis requirements.
The Joint Owners Group (JOG)MOV Periodic Verification Program consists of three.phases: (1)the interim MOV static diagnostic testing program;(2)an MOV dynamic testing program over the next 5 years;and (3)the long-term periodic test program.The NRC staff considers a licensee's commitment to the JOG program to include all three phases unless otherwise specified.
Where a licensee that has committed to implement the JOG program proposes to implement a different approach, the licensee will be expected to notify the NRC and to provide justification for the proposed alternative approach.Arizona Public Service Company's letter of March 18, 1997, implies that the JOG long-term program might not be followed for some MOVs.The licensee should clarify its commitment to the JOG program or justify its long-term periodic verification program for those MOVs that will not follow the JOG program recommendations.
APS Response: PVNGS intends to fully implement the recommendations of the JOG program, as explained in the letter dated July 19, 1998,"Response to Safety Evaluation for Joint Owners'roup Program on Periodic Verification of Motor-Operated Valves." In a letter dated July 19, 1998, the licensee updated its commitment to implement the JOG MOV Periodic Verification Program and stated that the interim MOV static diagnostic test program differs in some respects from the program described in Revision 2 of Combustion Engineering Owners Group (GEOG)Topical Report MPR-1807.For example, the licensee's interim MOV static diagnostic test program allows all valves to be tested only once every two refueling outages as compared to the every outage frequency recommended by the JOG interim MOV static diagnostic test program for high-risk valves with low margins.The licensee also noted that the two-cycle frequency could be extended based on valve performance and available margins.In the NRC safety evaluation dated October 30, 1997, on GEOG Topical Report MPR-1807 describing the JOG program, the NRC staff stated that MOVs with scheduled
)0 test frequencies beyond 5 years will need to be grouped with other MOVs that will be tested on frequencies less than 5 years in order to validate assumptions for the longer test intervals.
The NRC staff stated that this review must include both valve thrust (or torque)requirements and actuator output capability.
The licensee should describe how its MOV static diagnostic testing program will satisfy this condition of the NRC safety evaluation on the GEOG topical report.APS Response: Static diagnostic testing remains on a 2 cycle (36 month)frequency.
There are a few exceptions, which are justified and documented in accordance with station procedures and meet the existing Generic Letter 89-10 guidelines.
None of these exceptions extend the testing frequency beyond 5 years.A proceduralized program for extending frequencies has not been implemented and is awaiting the completion of a risk ranking and the availability of sufficient supporting trend data.PVNGS has stated that the JOG program will be implemented, which includes the requirements from the NRC safety evaluation for extending test frequencies.
The JOG program specifies that the methodology and discrimination criteria for ranking MOVs according to their safety significance are the responsibility of each participating licensee.In a letter dated March 18, 1997, the licensee stated that it was developing a new risk ranking study that uses a blend of probabilistic and deterministic methods that will be used to adjust test frequencies, test methods, and maintenance schedules.
As:Palo Verde's units are pressurized water reactors (PWRs)designed by Combustion Engineering (CE), the licensee should describe the methodologies used for risk ranking MOVs at Palo Verde in detail, and provide a list of the high-risk MOVs at Palo Verde, if any.In responding to this request, the licensee might apply insights from the guidance provided in the Westinghouse Owners Group (WOG)Engineering Report V-EC-1658-A (Revision 2, dated August 13, 1998),"Risk Ranking Approach for Motor-Operated Valves in Response to Generic Letter 96-05," and the NRC safety evaluation dated April 14, 1998, on the WOG methodology for risk ranking MOVs at Westinghouse-designed PWR nuclear plants.The licensee could also obtain insights from an MOV risk-ranking methodology developed by the Boiling Water Reactor Owners Group.APS Response: As described in APS'etter dated July 19, 1998,"Response to Safety Evaluation for Joint Owner's Group Program on Periodic Verification of Motor-Operated Valves (in response to Generic Letter 96-05)," PVNGS does not currently use risk ranking criteria in establishing static test frequencies.
PVNGS is in the early stages of developing a
i+[0's C I)C
~formal risk ranking of GL 89-10 MOVs, which takes advantage of recent improvements in the PVNGS PRA model as well as.industry experience in this area.For GL 89-10 motor operated valves modeled in the PVNGS PRA model, contribution to risk will be calculated using both the Level 1 and Level 2 PRA models.An expert panel will review these results along with additional appropriate input (such as fire and shutdown risk studies)to develop a final risk ranking.The PVNGS methodology will be similar to the methodology used by the Westinghouse Owners Group, with the exception of the cross-comparison of results.The CEOG is currently considering whether to perform a cross-comparison of GL 89-10 MOV risk ranking between CE plants.The availability of cross-comparison information for PVNGS is dependent on the outcome of GEOG's decision.When the process is complete and the results have been reviewed and approved by the expert panel, PVNGS would be able to supply a-list of high risk valves to the NRC.The licensee should briefly describe its plans for the use of test data from the motor control center (MCC)including (1)correlation of new MCC test data to existing direct force measurements; (2)interpretation of changes in MCC test data to changes in MOV thrust and torque performance; (3)consideration of system accuracy's and sensitivities to MOV degradation for both output and operating performance requirements; and (4)validation of MOV operability using MCC testing.APS Response: PVNGS currently does not use MCC testing, and there are no current plans to buy test equipment or implement a MCC test program.The JOG program focuses on the potential age-related.
increase in the thrust or torque required to operate valves under their design-basis conditions.
In the NRC safety evaluation dated October 30, 1997, on the JOG program, the NRC staff specified that licensees are responsible for addressing the thrust or torque delivered by the MOV motor actuator and its potential degradation.
The licensee should describe the plan at Palo Verde for ensuring adequate ac and dc MOV motor actuator output capability, including consideration of recent guidance in Limitorque Technical Update 98-01 and its Supplement 1.APS Response: The guidance from Limitorque Technical Update 98-01 and Supplement 1 have been incorporated into the calculation for establishing MOV thrust setpoints, and the GL 89-10 MOVs have been evaluated for continued operability.
To ensure the safety-related MOVs will remain operable until the next scheduled static test, any MOVs that are found outside the expected thrust/torque setpoint range are i+[e)'1 w4
~evaluated in accordance with station procedures.
In addition, the MOV trending program will monitor the results of static testing to identify long term trends and the results of these trends will be incorporated into the MOV thrust/torque setpoints and/or maintenance practices as appropriate.
4l 4 rg 45