ML17313B078

From kanterella
Revision as of 20:22, 14 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included
ML17313B078
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/20/1999
From: MAULDIN D
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17313B079 List:
References
102-04345-JML-A, NUDOCS 9909270119
Download: ML17313B078 (10)


Text

SUBJECT:

Forwards rev 22 to"PVNGS Emergency Plan." Summary l description of changes, included.CATEGORY 1 IREGULAT Y INFORMATION DISTRIBUTION SYSTEM (RIDS)I ACCESSION NBR:9909270119 DOC.DATE: 99/09/20 NOTARIZED:

NO DOCKET I FACIAL:STN-50-528 Pal'o Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN.-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION MAULDIN,D.

Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)(862-c I DZSTRZBUTZON CODE: A045D COPTER RECEZVED:LTR ENCL SZSE:~9e T TITLE: OR Submittal:

Emergency Preparedness Plans, Implement'g Procedures, C E NOTES: STANDARDIZED PLANT 05000528 Standardized plant.05000529 Q Standardized plant.05000530 0 RECIPIENT ID CODE/NAME KALYANAM,N NTERNAL ILE CENTER EXTERNAL: NOAC COPIES LTTR ENCL 1 2 2 1 1 1 1 RECIPIENT ID CODE/NAME IRO/HAGAN,D.

DOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 D N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF.COPIES REQUIRED: LTTR 8 ENCL 8 i+[~i II IV Palo Verde Nuclear Generating Station David Mauidin Vice President Nuclear Engineering and Support TEL (623)3934553 FAX (623)3934077 Mail Station 7605 P.O.Box 52034 Phoenix, AZ 85072-2034 102-04345-JML/AKK/DGM September 20, 1999 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, D.C.20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 License Nos.NPF-41, NPF-51, NPF-74 PVNGS Emergency Plan, Revision 22 Arizona Public Service Company (APS)has revised the Emergency Plan in accordance with 10 CFR 50.54 (q)and 50.4.APS has determined that this revision does not decrease the effectiveness of the Emergency Plan.In accordance with 10 CFR 50.4 (b)(5), two copies will be forwarded to the Regional Administrator, Region IV, and one copy will be submitted to the PVNGS Senior Resident Inspector.

A summary description of changes to the Plan is provided in Enclosure 1.The revised Emergency Plan is provided in Enclosure 2.The implementation date of the revised Emergency Plan is September 15, 1999.No commitments are being made to the NRC by this letter.Should you have any further questions, please contact Ms.Angela K.Krainik, Director, Regulatory Affairs, at (623)393-5421.Sincerely, JML/AKK/DGM/kg

,9909270ff9 9'70920 c (>',PDR ADQCK 05000528I I'F PDR ii~.

U.S.Nuclear Regulatory Commission ATl N: Document Control Desk PVNGS Emergency Plan, Revision 22 Page 2

Enclosures:

1.Summary of changes to PVNGS Emergency Plan, Revision 22 2.PVNGS Emergency Plan, Revision 22 CC: E.W.Merschoff N.Kalyanam G.M.Good P.H.Harrell J.M.Moorman (all with Enclosures) i+[~I I f ENCLOSURE t

SUMMARY

OF CHANGES PVNGS EMERGENCY PLAN Revision 22 i+i~~Cy This table indicates every changed area of the PVNGS Emergency Plan, listed by page, section, and paragraph.

A revision bar to the right of the revised paragraph indicates major changes in the Emergency Plan.Page 14 69 71 72 73'84 Section 4.2.1.9 8.1 8.1.2 8.1.3 8.1.3 8.1 4 8.1.5 8.2 8.2 13.0 Revision 22 Changes to PVNGS Emergency Plan Change Changed title of the"Security Shift Team Leader" to-"Security Section Leader" Changed title of"Department Leader, Emergency Planning" to"Program Leader Emergency Planning" Changed title of"Department Leader, Emergency Planning'*

to"Program Leader Emergency Planning" Changed title of"Department.

Leader, Emergency Planning" to"Program Leader Emergency Planning" Changed title of"Department Leader, Emergency Planning" to"Program Leader Emergency Planning" Changed title of"Department Leader, Emergency Planning" to"Program Leader Emergency Planning" Revised the table.Updated the Implementing Procedure titles and numbers.

Ol i>II'J~'1 V