2013, Dresden Initial License Exam, as Administered Admin JPMs
ML13354B850
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/02/2013
From: Walton R K
Operations Branch III
To:
Walton R K
Shared Package
ML11355A018 List:
References
Download: ML13354B850 (74)


Text

Exelon Nuclear Job Performance Measure

DETERMINE GENERATOR OPERATING LIMITS JPM Number:

A-N-1-R Revision Number: 0 0 Date: 0 8/13 EXAM MATERIAL

Developed By:

Instructor Date Approved By:

Facility Representative Date Job Performance Measure (JPM)

A-N-1-R Page 2 of 8 Revision Record (Summary)

Revision 0 0 New JPM for ILT 12

-1 (2013-301) NRC Exam.

Job Performance Measure (JPM)

A-N-1-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with Turbine load at 900 MW and Turbine Reactive load at 200 MVAR. NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

DOCUMENT PREPARATION

1. Provide a clean copy of DOP 6400-08.

Job Performance Measure (JPM)

A-N-1-R Page 4 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 Generator is operating at 900 MWe and 200MVARs.
3. Unit 2 Generator voltage regulator in service in automatic.
4. Unit 2 Generator H 2 pressure is 59 psig.
5. TSO has requested Unit 2 raise MVARs to 350 MVAR.

INITIATING CUE

1. The Unit supervisor has directed you to raise Unit 2 MVARs to 350 MVAR.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-1-R Page 5 of 8 JPM Start Time

_________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of DOP 6400-08. 1. Maintain system parameters within stability and operability curves for existing hydrogen pressure. Verifies TSO request can be performed within limits of Figure 2 or 4.

_____ _____ _____

  • 2. Use AUTO VOLTAGE ADJUST control switch to control system voltage within the "Target Voltage Schedule & Voltage Range" OR as directed by TSO.

Places the AUTO VOLTAGE ADJUST C/S to RAISE to raise MVAR to 350 MVAR. _____ _____ _____

CUE: After MVARs adjusted, a local operator on rounds informs the control room that the pressure regulator malfunctioned and H 2 pressure is now 50 PSIG.

  • 3. Ensure loading on Unit 2 is within Figure 2, Dresden Unit 2 Generator Capability Curves and Under Excitation Limiter Settings, Regulator In Service, AND/OR Figure 4, Dresden Unit 2 Generator Capability Curves (Expanded View) Regulator In Service. Verifies that current conditions are not within the limits of figure 2 or 4 and recommends lowering MVARs to < 300 MVAR

. _____ _____ _____

CUE: If required, As SRO, ask the examinee where they should leave MVARs, and verify their response is within the capability curve limits (JPM COMPLETE)

4. Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

_____ _____ _____

CUE: Acknowledge report of task completion.

Job Performance Measure (JPM)

A-N-1-R Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment END JPM Stop Time

_________

Job Performance Measure (JPM)

A-N-1-R Page 7 of 8 Operator's Name:

Job Title: RO JPM Title: Determine Generator Operating Limits Revision Number: 00

JPM Number:

A-N-1-R Task Number and Title: 299L029 , Conduct Shift Operations K/A Number and Importance: Generic 2.1.25 3.9/ 4.2

Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path

Yes No Perform SRO Only: Yes No Time Critical:

Yes No Estimated Time to Complete:

minutes Actual Time Used:

minutes

References:

DOP 64 00-08 , rev 30 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name (Print): Evaluator's Signature:

Date:

Job Performance Measure (JPM)

A-N-1-R Page 8 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 Generator is operating at 900 MWe and 200MVAR
s. 3. Unit 2 Generator voltage regulator in service in automatic.
4. Unit 2 Generator H 2 pressure is 59 psig.
5. TSO has requested Unit 2 raise MVARs to 350 MVAR.

INITIATING CUE

1. The Unit supervisor has directed you to raise Unit 2 MVARs to 350 MVAR.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure

REPORTABILITY DETERMINATION JPM Number:

A-N-1-S Revision Number: 0 1 Date: 0 8/13 EXAM MATERIAL

Developed By:

Instructor Date Approved By:

Facility Representative Date Job Performance Measure (JPM)

A-N-1-S Page 2 of 7 Revision Record (Summary)

Revision 0 0 Bank JPM. Revision 0 1 Revised for ILT 1 2-1 (201 3-301) NRC Exam

.

Job Performance Measure (JPM)

A-N-1-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. None Job Performance Measure (JPM)

A-N-1-S Page 4 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor

. 2. An event has occurred resulting in the following conditions:

Unit 2 is at 95% power.

The seven-day Tech Spec time clock is about to expire for the Unit 2 EDG being degraded.

Unit 2 has initiated a shutdown since it is required to be in cold shutdown within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. INITIATING CUE

1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports.
2. Inform the Shift Manager when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the

local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-1-S Page 5 of 7 JPM Start Time

_________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of
  • 1. Determines the event is reportable per SAF 1.2 Determines the event is reportable per SAF 1.2, Plant Shutdown Required by Technical Specifications

_____ _____ _____

  • 2. Determines the time limit to report via ENS as soon as practicable, and in all cases within four hour of initiating the shutdown that is required by TS. Determines the time limit to report via ENS as soon as practicable, and in all cases within four hour of initiating the shutdown that is required by TS.

_____ _____ _____

3. Determines if plant shutdown is completed, submit a Licensee Event Report to the NRC within 60 days of discovery of the event.

Determines a LER is required to the NRC within 60 days of discovery of the event if plant shutdown is completed.

_____ _____ _____

4. Informs Shift Manager task is complete. Examinee notifies the Shift Manager. _____ _____ _____

CUE: Acknowledge report of task completion.

END JPM Stop Time

_________

Job Performance Measure (JPM)

A-N-1-S Page 6 of 7 Operator's Name:

Job Title:

SRO JPM Title: Reportability Determination Revision Number: 0 1

JPM Number:

A-N-1-S Task Number and Title: 299L001, Determine Reportability requirements as outlined in station Reportability manual

. K/A Number and Importance: Generic 2.1.10 2.7 / 3.9

Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path

Yes No Perform SRO Only: Yes No Time Critical:

Yes No Estimated Time to Complete:

10 minutes Actual Time Used:

minutes

References:

Reportability Manual LS

-AA-1110 , rev 19 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Y es No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name (Prin t): Evaluator's Signature:

Date:

Job Performance Measure (JPM)

A-N-1-S Page 7 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. An event has occurred resulting in the following conditions:

Unit 2 is at 95% power.

The seven-day Tech Spec time clock is about to expire for the Unit 2 ED G being degraded.

Unit 2 has initiated a shutdown since it is required to be in cold shutdown within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

INITIATING CUE

1. Determine the Reportability requirements, including the Event Classification and the Time Limit of any Notifications or Reports. 2. Inform the Shift Manager when the task is complete.

Exelon Nuclear Job Performance Measure

DETERMINE HEAT STRESS ACTIONS JPM Number:

A-N-2-R Revision Number: 0 0 Date: 0 8/13 EXAM MATERIAL

Developed By:

Instructor Date Approved By:

Facility Representative Date Job Performance Measure (JPM)

A-N-2-R Page 2 of 9 Revision Record (Summary)

Revision 0 0 New JPM for ILT 12

-1 (2013-301) NRC Exam

.

Job Performance Measure (JPM)

A-N-2-R Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a clean copy of SA-AA-111 Job Performance Measure (JPM)

A-N-2-R Page 4 of 9 INITIAL CONDITIONS 1. You are the Unit 2 Aux NSO.

2. The following conditions exist in the Drywell where work is being performed:

Dry Bulb Temperature is 110

°F Wet Bulb Globe Temperature (WBGT) is 101

°F Single PC's and scrubs are required The work involves inspections and moderate climbing The duration of the work will be 10 minutes

3. The WBGT in the area outside the Drywell bullpen is 78

°F INITIATING CUE

1. The Unit Supervisor has directed you to complete attachment 4 of SA

-AA-111 for the work to be performed in the Drywell.

2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Job Performance Measure (JPM)

A-N-2-R Page 5 of 9 Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-2-R Page 6 of 9 JPM Start Tim e: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of 1. Record the dry bulb temperature From initial conditions, dry bulb temp is 110°F. _____ _____ _____

2. Record the Wet Bulb Globe Temperature (WBGT)

From initial conditions, WBGT temp is 101°F. _____ _____ _____

  • 3. Classify the work environment (HT, VHT, EHT)

Determines the environment is HT based on an action time being calculated.

_____ _____ _____ 4. Record the metabolic rate (Low, Moderate, High)

Determines the metabolic rate is moderate per attachment 2.

_____ _____ _____

5. Record the clothing ensemble From initial conditions, Single PC's and scrubs are required. _____ _____ _____
  • 6. Record the Action Time Determines the action time is 20 minutes from per attachment 3.

_____ _____ _____

7. Record Check Time Frequency Determines the check time frequency to be 5

-10 min. _____ _____ _____

8. Record the Maximum Extended Action Time Determines Maximum Extended Action Time is 30 min. _____ _____ _____
  • 9. Record the Recovery Time Calculates the Recovery time is 30 min.

_____ _____ _____

10. Record the Cool Area location Determines that the area outside the Drywell Bullpen meets the requirements for a cool area.

_____ _____ _____

Job Performance Measure (JPM)

A-N-2-R Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment 11. Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

_____ _____ _____

CUE: Acknowledge report of task completion.

END JPM Stop Time

_________

Job Performance Measure (JPM)

A-N-2-R Page 8 of 9 Operator's Name:

Job Title: RO JPM Title:

Determine Heat Stress Actions Revision Number: 00

JPM Number:

A-N-2-R Task Number and Title: 299l029 , Conduct Shift Operations.

K/A Number and Importance: Generic.

Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method: Simulate Alternate Path

Yes No Perform SRO Only: Yes No Time Critical:

Yes No Estimated Time to Complete: minutes Actual Time Used:

minutes

References:

procedure , rev ## EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name (Print): Evaluator's Signature:

Date:

Job Performance Measure (JPM)

A-N-2-R Page 9 of 9 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The following conditions exist in the Drywell where work is being performed:

Dry Bulb Temperature is 110

°F Wet Bulb Globe Temperature (WBGT) is 101

°F Single PC's and scrubs are required The work involves inspections and moderate climbing The duration of the work will be 10 minutes

3. The WBGT in the area outside the Drywell bullpen is 78

°F INITIATING CUE

1. The Unit Supervisor has directed you to complete attachment 4 of SA

-AA-111 for the work to be performed in the Drywell.

2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure

AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS JPM Number: A

-N-2-S Revision Number: 0 1 Date: 08/13 EXAM MATERIAL

Developed By:

Instructor Date Approved By:

Facility Representative Date Job Performance Measure (JPM)

A-N-2-S Page 2 of 8 Revision Record (Summary)

Revision 0 0 Bank JPM. Revision 01 Revised for ILT 12-1 (2013-301) NRC Exam

.

Job Performance Measure (JPM)

A-N-2-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures

. 2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Clean copy of LS-AA-119.

Job Performance Measure (JPM)

A-N-2-S Page 4 of 8 INITIAL CONDITIONS

1. You are the Shift Manager.
2. Both units are operating at near rated power.
3. It is Monday 10/21/13 @ 0 6 00 4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
5. Another SRO will not be able to come in until 1 300. 6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
7. No other Licensed individual is available to fill the Safety Related position.
8. The Unit 2 SRO working shift 1 is Steve Smith

. 9. Steve is ready and willing to work the overtime and will work until 1 3 00. 10. Steve is NOT fatigued and IS mentally alert.

11. Steve's Employee ID# is: 987654.
12. Safety-related work WILL be performed by Steve during the shift

. 13. Steve is NOT scheduled to work Tuesday 10/22/13 through Thursday 10/24/13. 14. Steve was on a 7 day vacation, prior to the following worked hours and shifts that count towards 10 CFR 26 Work Hour Limits, so far this week:

Shift Tue 10/15/13 Wed 10/16/13 Thu 10/17/13 Fri 10/18/13 S at 10/19/13 Sun 10/20/1 3 Mon 10/21/13 1 (2300-0700) 8 8 8 8 8 8 8 2 (0700-1500) 4 4 4 3 (1500-2300) INITIATING CUE

1. Complete LS-AA-119, attachment 1, section 1 - Request paperwork for Steve Smith

. 2. The Operations Director will complete sections 2

- 4 of LS-AA-119.

Job Performance Measure (JPM)

A-N-2-S Page 5 of 8 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-2-S Page 6 of 8 JPM Start Time

_________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of LS

-AA-119.

  • 1. Reviews procedure to determine what limits will be exceeded. Determines that overtime would exceed:

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 days.

_____ _____ _____

  • 2. Properly fills out Attachment 1 , Section 1

- Request portion. Critical areas are:

Planned Waiver Start: 10/21/13 / 11 00 Planned Waiver End:

10/21/13 / 1 3 00 Planned Waiver Duration:

2 h our s > 72 in any 7 days.

checked Submitted by

name, signature, date, and time.

_____ _____ _____

3. Forwards paperwork to the Operations Director.

Forwards paperwork to the Operations Director or designee. _____ _____ _____

END JPM Stop Time

_________

Job Performance Measure (JPM)

A-N-2-S Page 7 of 8 Operator's Name: Job Title:

SRO JPM Title: AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS Revision Number: 0 1

JPM Number: A-N-2-S Task Number and Title:

299L057 , Perform administrative duties to ensure overtime restrictions are not exceeded. K/A Number and Importance: Generic.1.5 2.9 / 3.9 Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path

Yes No Perform SRO Only: Yes No Time Critical:

Yes No Estimated Time to Complete:

15 minutes Actual Time Used:

minutes

References:

LS-AA-119 , rev 10 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name (Print): Evaluator's Signature:

Date:

Job Performance Measure (JPM)

A-N-2-S Page 8 of 8 INITIAL CONDITIONS

1. You are the Shift Manager.
2. Both units are operating at near rated power.
3. It is Monday 10/21/13 @ 0 6 00 4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
5. Another SRO will not be able to come in until 1 300. 6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
7. No other Licensed individual is available to fill the Safety Related position.
8. The Unit 2 SRO working shift 1 is Steve Smith

. 9. Steve is ready and willing to work the overtime and will work until 1 3 00. 10. Steve is NOT fatigued and IS mentally alert.

11. Steve's Employee ID# is: 987654.
12. Safety-related work WILL be performed by Steve during the shift

. 13. Steve is NOT scheduled to work Tuesday 10/22/13 through Thursday 10/24/13. 14. Steve was on a 7 day vacation, prior to the following worked hours and shifts that count towards 10 CFR 26 Work Hour Limits, so far this week:

Shift Tue 10/15/13 Wed 10/16/13 Thu 10/17/13 Fri 10/18/13 Sat 10/19/13 Sun 10/20/13 Mon 10/21/13 1 (2300

-0700) 8 8 8 8 8 8 8 2 (0700

-1500) 4 4 4 3 (1500

-2300) INITIATING CUE

1. Complete LS

-AA-119, attachment 1, section 1

- Request paperwork for Steve Smith. 2. The Operations Director will complete sections 2

- 4 of LS-AA-119.

Exelon Nuclear Job Performance Measure

PERFORM APRM FLOW BIAS CALIBRATION CHECK JPM Number:

A-N-3-R Revision Number: 0 0 Date: 0 8/13 EXAM MATERIAL

Developed By:

Instructor Date Approved By:

Facility Representative Date Job Performance Measure (JPM)

A-N-3-R Page 2 of 8 Revision Record (Summary)

Revision 0 0 New JPM for ILT 12

-1 (2013-301) NRC Exam

.

Job Performance Measure (JPM)

A-N-3-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a clean copy of DOS 0500-26, CRSP Unit Status sheet and Operator Aid 74

Job Performance Measure (JPM)

A-N-3-R Page 4 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 is at full power.
3. The plant process computer is currently unavailable.

INITIATING CUE

1. The Unit Supervisor has directed you to perform DOS 0500

-26, APRM FLOW BIAS CALIBRATION CHECK.

2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-3-R Page 5 of 8 JPM Start Time

_________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of DOS 0500-26, CRSP Unit Status sheet and Operator Aid 74 CUE: When the examinee states they will check FI 2-260-5A(B) and RBM 7/8 provide them with the appropriate supplied picture

.

  • 1. IF the process computer is NOT available, THEN obtain recirc pump flow for each loop from 2 A(B) PP FLOW, FI 2-260-5A(B) AND calculate Total Drive Flow Determines that A and B recirc pump flows are 16 Mlbm/hr and calculated total drive flow is 32 Mlbm/hr. _____ _____ _____
2. Record Rated Drive Flow (WDRATED) from the CRSP Unit Status sheet Enters 32.89 Mlbm/hr from the CRSP Unit Status sheet. _____ _____ _____
  • 3. Calculate Drive Flow (%)

Calculates drive flow percentage to be 97.29%

_____ _____ _____

4. Record the percent FLOW

(%) indicated on RBM CH 7 RPS CH A, at Panel 902(3)

-37 Determines percent FLOW on RBM CH 7 RPS CH A is 97% _____ _____ _____

5. Record the percent FLOW (%) indicated on RBM CH 8 RPS CH B, at Panel 902(3)

-37 Determines percent FLOW on RBM CH 8 RPS CH B is 97% _____ _____ _____

  • 6. Verify the values recorded in Steps 4 AND 5 are LESS THAN OR EQUAL TO the Desired Setting per Operator Aid Unit 2(3) APRM/RBM Flow Converter Setting vs. Total Drive Flow, for WD% value calculated in Step 3 Using Operator aid, Determines values are greater than Desired Settings. Acceptance criteria no t met. _____ _____ _____

Job Performance Measure (JPM)

A-N-3-R Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment 7. Contact the QNE AND IMD to perform DIS 0700

-02, APRM/RBM Flow Instrumentation Total Drive Flow Adjustment States that the QNE AND IMD would be contacted to perform APRM/RBM Flow Instrumentation Total Drive Flow Adjustment

_____ _____ _____

8. Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

_____ _____ _____

CUE: Acknowledge report of task completion.

END JPM Stop Time

_________

Job Performance Measure (JPM)

A-N-3-R Page 7 of 8 Operator's Name:

Job Title: RO JPM Title: APRM Flow Bias Calibration Check Revision Number: 00

JPM Number:

A-N-3-R Task Number and Title: 215L0007 , Perform Unit 2(3) power range monitoring system surveillance K/A Number and Importance: Generic 2.2.14 3.9 / 4.3

Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Pa th: Yes No Perform SRO Only: Yes No Time Critical:

Yes No Estimated Time to Complete:

minutes Actual Time Used:

minutes

References:

DOS 0500-26 , rev 00; Operator Aid #74, rev 09 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name (Print): Evaluator's Signature:

Date:

Job Performance Measure (JPM)

A-N-3-R Page 8 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 is at full power.
3. The plant process computer is currently unavailable.

INITIATING CUE

1. The Unit Supervisor has directed you to perform DOS 0500

-26, APRM FLOW BIAS CALIBRATION CHECK.

2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure

DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW JPM Number:

A-N-3-S Revision Number: 0 0 Date: 0 8/13 EXAM MATERIAL

Developed By:

Instructor Date Approved By:

Facility Representative Date Job Performance Measure (JPM)

A-N-3-S Page 2 of 8 Revision Record (Summary)

Revision 0 0 Modified JPM for ILT 12

-1 (2013-301) NRC Exam

.

Job Performance Measure (JPM)

A-N-3-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 6600-01 Job Performance Measure (JPM)

A-N-3-S Page 4 of 8 INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor

. 2. The Unit 3 EDG was run for a normal even month surveillance.

3. No maintenance was performed on the Unit 3 EDG.
4. The Unit 3 NSO has completed DOS 6600

-01, DIESEL GENERATOR SURVEILLANCE TEST S for the Unit 3 EDG

. INITIATING CUE

1. Verify the Unit 3 EDG surveillance has been completed correctly.
2. Review the surveillance and determine the operability of the Unit 3 EDG.
3. Inform the Shift Manager when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-3-S Page 5 of 8 JPM Start Time

_________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of DOS 6600-01 NOTE: Other unidentified errors exist. Only items marked as critical are required.
  • 1. Verify D/G has operated for > 60 minutes with a load of 2340 to 2600 kW Recognizes that the diesel ran for less than 6 0 minutes. Acceptance criteria not met.

_____ _____ _____

  • 2. Diesel fuel oil day tank level > 29.5 inches (for U2 or U3 EDG) Recognizes that Diesel fuel oil day tank level is less than 29.5 inches Acceptance criteria not met. _____ _____ _____
  • 3. Verify D/G START AIR A1/A2 RECEIVER TANK pressure in Step 3.a.(16) is greater than D/G START AIR B1/B2 RECEIVER TANK in Step 3.a.(16) Recognizes that A1/A2 RECEIVER TANK pressure is not greater than B1/B2 RECEIVER TANK pressure. Acceptance criteria not met. _____ _____ _____
4. IF air pressure between banks has equalized, THEN initiate an Issue Report to repair check valve.

Recognizes that an issue report needs to be generated to repair the check valve.

_____ _____ _____

5. Verify 'A' compressor stops between 245 and 260 psig.

Recognizes that the 'A' compressor stopped > 260 psig. _____ _____ _____

6. IF Compressor "A" OR "B" stop pressures are NOT within expected range (224 t o 260 psig), THEN contact the Plant Engineering System Manager AND initiate an Issue Report.

Recognizes that compressor 'A' did not stop within the expected range (265 psig), the System Engineer needs to be contacted.

_____ _____ _____

Job Performance Measure (JPM)

A-N-3-S Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment 7. Notify System Engineer that 'A' compressor did not stop at the expected band.

Notifies System Engineer that 'A' compressor did not start at the expected band.

_____ _____ _____

  • 8. Declare D/G Operable Recognizes that the Acceptance Criteria for the Unit 3 EDG is not met and determines the EDG is inoperable. _____ _____ _____
9. Informs Shift Manager task is complete. Examinee notifies the Shift Manager. _____ _____ _____

CUE: Acknowledge report of task completion.

END JPM Stop Time

_________

Job Performance Measure (JPM)

A-N-3-S Page 7 of 8 Operator's Name:

Job Title:

SRO JPM Title: DECLARE EDG OPERABLE AFTER SURVEILLANCE REVIEW Revision Number: 00

JPM Number:

A-N-3-S Task Number and Title: 264L009 , Perform Surveillance Testing K/A Number and Importance: Generic 2.2.12 3.7 / 4.1

Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path

Yes No Perform SRO Only: Yes No Time Critical:

Yes No Estimated Time to Complete:

15 minutes Actual Time Used:

minutes

References:

DOS 6600-01 , rev 123 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name (Print): Evaluator's Signature:

Date:

Job Performance Measure (JPM)

A-N-3-S Page 8 of 8 INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor. 2. The Unit 3 EDG was run for a normal even month surveillance.
3. No maintenance was performed on the Unit 3 EDG.
4. The Unit 3 NSO has completed DOS 6600

-01, DIESEL GENERATOR SURVEILLANCE TESTS for the Unit 3 EDG

. INITIATING CUE

1. Verify the Unit 3 EDG surveillance has been completed correctly.
2. Review the surveillance and determine the operability of the Unit 3 EDG.
3. Inform the Shift Manager when the task is complete.

Exelon Nuclear Job Performance Measure

DETERMINE ACTIONS FOR A FIRE JPM Number:

A-N-4-R Revision Number: 0 0 Date: 0 8/13 EXAM MATERIAL

Developed By:

Instructor Date Approved By:

Facility Representative Date Job Performance Measure (JPM)

A-N-4-R Page 2 of 7 Revision Record (Summary)

Revision 0 0 New JPM for ILT 12

-1 (2013-301) NRC Exam

.

Job Performance Measure (JPM)

A-N-4-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a copy of DOA 0010-10 and DOA 0010

-S1 Job Performance Measure (JPM)

A-N-4-R Page 4 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A fire is burning at the Lift Station, no explosion has occurred.
3. Hazmat and rescue response are not required.
4. The Fire brigade has been alerted and is attempting to combat the fir e unsuccessfully.
5. A dedicated outside line is not available.

INITIATING CUE

1. The Unit supervisor has directed you to enter and execute DOA 0010

-10, FIRE-EXPLOSION.

2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue. Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-4-R Page 5 of 7 JPM Start Time

_________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of DOA 0010-10. Provide the examinee with the supplied copy of DOA 0010

-S1 when requested.

  • 1. Notify Coal City Fire Protection District. (Refer to DOA 0010-S1, Key Phone Numbers for DOA 0010 Block Procedures.)

From DOA 0010

-S1 determines that 815

-942-0336 is the number needed to contact the CCFPD. _____ _____ _____

  • 2. Dial 815-942-0336 and communicate the details of the fire. Dials 815-942-0336 and communicates the location of the fire.

_____ _____ _____

CUE: If requested by the examinee, the TSO can not contact the Coal City Fire Department because they are currently dealing with grid instabilities.

3. Notifies TSO via direct line for major fire.

Notifies the TSO from a control room phone using the TSO direct line button and provides call back phone number.

_____ _____ _____

4. Notify Security Shift Supervisor that outside fire department will be responding AND request assistance in providing access to affected area if necessary.

Notifies the Security Shift Supervisor that the CCFPD will be responding to the Lift Station.

_____ _____ _____

5. Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

_____ _____ _____

CUE: Acknowledge report of task completion.

END JPM Stop Time

_________

Job Performance Measure (JPM)

A-N-4-R Page 6 of 7 Operator's Name:

Job Title: RO JPM Title: DETERMINE ACTIONS FOR A FIRE Revision Number: 00

JPM Number:

A-N-4-R Task Number and Title: 295L009, Respond to a fire/explosion K/A Number and Importance: Generic 2.4.27 3.4 / 3.9

Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path

Yes No Perform SRO Only: Yes No Time Critical:

Yes No Estimated Time to Complete:

minutes Actual Time Used:

minutes

References:

DOA 0010-10 , rev 18; DOA 0010

-S1, rev 14 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name (Print): Evaluator's Signature:

Date:

Job Performance Measure (JPM)

A-N-4-R Page 7 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A fire is burning at the Lift Station, no explosion has occurred.
3. Hazmat and rescue response are not required.
4. The Fire brigade has been alerted and is attempting to combat the fir e unsuccessfully.
5. A dedicated outside line is not available.

INITIATING CUE

1. The Unit supervisor has directed you to enter and execute DOA 0010

-10, FIRE-EXPLOSION.

2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure

SELECT PERSON NEL FOR RADIATION WOR K JPM Number:

A-N-4-S Revision Number: 00 Date: 08/13

Developed By:

Instructor Date Approved By:

Facility Representative Date Job Performance Measure (JPM)

A-N-4-S Page 2 of 10 Revision Record (Summary) Revision 0 0 Modified JPM for ILT 12

-1 (2013-301) NRC Exam.

Job Performance Measure (JPM)

A-N-4-S Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Markup a copy of an RWP for the Unit 3 RWCU Pump Room. 2. Markup a survey map for the Unit 3 RWCU Pump Room.
3. Clean copy of RP

-AA-203.

Job Performance Measure (JPM)

A-N-4-S Page 4 of 10 INITIAL CONDITIONS

1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
2. Five NLOs are available this shift.

None of the five have received dose at any location other than Dresden Station.

None of the five have received dose since midnight on any RWPs other than 10004555. 3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:

Name DDE dose received on RWP 10004555 Today Annual TEDE dose To Date Alex 4 0 mrem 1 550 mrem Dan 5 mrem 1 950 mrem Mike 0 mrem 1 920 mrem Sue 45 mrem 1 8 50 mrem Tom 10 mrem 1 7 50 mrem 4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:

45 minutes total in the area near the following two valves: 3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump) 15 minutes total in the area near the following one valve: 3-1201-128A 'A' RWCU Pump Suction (at 'A' RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.

Job Performance Measure (JPM)

A-N-4-S Page 5 of 10 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use: UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be

performed. The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-4-S Page 6 of 10 JPM Start Time

_________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of the RWP and survey map of the RWCU pump room and the supplied copy of RP

-AA-203. The following steps may be performed in any order.

1. Reviews Survey Maps to determine area dose rates.

Reviews the survey maps and determines area dose rates to be 50 mr/hr for the first group of 2 valves and 160 mr/hr for the remaining valve. _____ _____ _____

NOTE: The following calculations should be made:

2 valve clearance projected dose = 0.

75 hr x 4 0 mr/hr = 30 mrem 1 valve clearance projected dose = 0.25 hr x 1 40 mr/hr =

35 mrem Total projected dose for the job = 40 mrem + 30 mrem =

65 mrem

  • 2. Calculates that the projected dose that will be received for the task is 65 mrem. Determines the NLO's will receive 30 mrem on the first 2 valves and 35 on the next valve. _____ _____ _____

CUE: IF the candidate inquires whether or not any of the NLOs has received permission to exceed any dose limits, respond: "None of the Non Licensed Operators have received permission to exceed any limits".

NOTE: The following steps may be performed in any order.

  • 3. Determines that ALEX CAN NOT perform the job because he would exceed the 80 mrem dose alarm on RWP 10004555. Alex's total daily dose on RWP 10004555 would be 105 mrem. _____ _____ __

___

Job Performance Measure (JPM)

A-N-4-S Page 7 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

  • 4. Determines that Dan CAN NOT perform the job because he would exceed the 2000 mrem Exelon Annual limit. Dan's total Annual dose would be 2015 mrem. _____ _____ _____
  • 5. Determines that Mike CAN perform the job because no limits will be exceeded.

Mike's total RWP daily dose and Annual dose will remain below the limits.

_____ _____ _____

  • 6. Determines that Sue CAN NOT perform the job because she would exceed the 80 mrem dose alarm on RWP 10004555

. Alex's total daily dose on RWP 10004555 would be 110 mrem. _____ _____ _____

  • 7. Determines that Tom CAN perform the job because no limits will be exceeded.

Tom's total RWP daily dose and Annual dose will remain below the limits. _____ _____ _____

END JPM Stop Time

_________

Job Performance Measure (JPM)

A-N-4-S Page 8 of 10 Operator's Name:

Job Title:

SRO JPM Title: SELECT PERSONEL FOR RADIATION WORK

Revision Number: 0 0

JPM Number: A-N-4-S Task Number and Title:

29900LK119, Discuss the items to be considered prior to work authorization K/A Number and Importance: Generic.2.3.4 3.2 / 3.7

Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path

Yes No Perform SRO Only: Yes No Time Critical:

Yes No Estimated Time to Complete:

10 minutes Actual Time Used:

minutes

References:

RP-AA-203, rev 03 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name (Print): Evaluator's Signature: Date:

Job Performance Measure (JPM)

A-N-4-S Page 9 of 10 KEY EVALUATOR: The candidate must determine that dose for the task will be 65 mrem and determine that only two NLO s can receive the dose, necessary to compl ete the task. They are Mike and Tom. See the table below for projected job dose, 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> total dose on RWP 1000 4555, and total Annual TEDE dose for each Operator. Calculation:

2 valve s clearance (at RWCU Aux Pump) projected dose = 0.

75 hr x 40 mr/hr =

30mrem 1 valve clearance (at 'A' RWCU Pump) projected dose = 0.25hr x 1 4 0 mr/hr = 35mrem 30mrem + 35 mrem = 65 mrem projected job dose for clearance order hanging Name DDE dose received on RWP 10004555 today Annual TEDE dose as of Midnight To Date Projected dose on RWP 10004555 for the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period Projected Annual TEDE (including all dose from last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)

Alex 40 mrem 1 550 mrem (40 + 65 =)

105 mrem (1 550 + 65 =)

1 615 mrem Dan 5 mrem 1 950 mrem (5 + 65 =)

70 mrem (1 950 + 65 =)

20 15 mrem Mike 0 mrem 1 920 mrem (0 + 65 =) 65 mrem (1 920 + 65 =)

1985 mrem Sue 45 mrem 1 8 50 mrem (45 + 65 =)

1 10 mrem (1 850 + 65 =)

1915 mrem Tom 10 mrem 1 7 50 mrem (10 + 65 =)

75 mrem (1 750 + 65 =)

1 8 15 mrem The bolded values in the table exceed the applicable Company, RWP, or 10CFR limit.

Job Performance Measure (JPM)

A-N-4-S Page 10 of 10 INITIAL CONDITIONS

1. You are a Unit Supervisor and will be briefing NLOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555

. 2. Five NLOs are available this shift.

None of the five have received dose at any location other than Dresden Station. None of the five have received dose since midnight on any RWPs other than 10004555.

3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five NLOs to assist you in your planning:

Name DDE dose received on RWP 10004555 Today Annual TEDE dose To Date Alex 40 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 45 mrem 1850 mrem Tom 10 mrem 1750 mrem 4. The total expected stay time for each NLO will be 60 minutes. Based on past job history, it will breakdown as follows:

45 minutes total in the area near the following two valves: 3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump) 15 minutes total in the area near the following one valve: 3-1201-128A 'A' RWCU Pump Suction (at 'A' RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which NLO(s) CAN and which NLO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.

Exelon Nuclear Job Performance Measure

AUTHORIZE USE OF KI JPM Number:

A-N-5-S Revision Number: 0 2 Date: 0 8/1 3

Developed By:

Instructor Date Approved By:

Facility Representative Date Job Performance Measure (JPM)

A-N-5-S Page 2 of 9 Revision Record (Summary)

Revision 0 1 Bank JPM. Revision 0 2 Revised for ILT 12-1 (2013-301) NRC Exam

.

Job Performance Measure (JPM)

A-N-5-S Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Two (2) marked up copies of EP

-AA-113-F-02. 2. Blank copy of EP

-AA-113. 3. Blank copy of EP

-AA-113-F-03.

Job Performance Measure (JPM)

A-N-5-S Page 4 of 9 INITIAL CONDITIONS

1. You are the Station Emergency Director.
2. A General Emergency has been declared.
3. There is an offsite release in progress.
4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
5. Containment is currently being challenged.
6. The TSC has NOT been activated, but the appropriate EAL has been declared.
7. An Emergency life saving operation MUST be performed.
8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
9. The operation requires two people to enter the field.
10. Clay Morrow , Employee ID
  1. 123456 and Jax Teller Employee ID
  1. 891011 have volunteered.
11. Clay and Jax have NEVER received an emergency exposure before.
12. Authorization for Emergency Exposure (EP

-AA-113-F-02 forms) have been filled out for Clay and Jax. INITIATING CUES

1. Execute section 4.4 of EP

-AA-113.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Job Performance Measure (JPM)

A-N-5-S Page 5 of 9 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-5-S Page 6 of 9 JPM Start Time

_________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the Examinee the provided copies of:

EP-AA-113-F-02, and EP-AA-113. 1. Applicant determines need for emergency action.

Emergency action is needed per initiating cue.

_____ _____ _____

CUE: If asked, Clay and Jax do NOT have any adverse reactions to KI.

2. Applicant recognizes per the initiating cue that authorization to take KI must also be completed prior to the emergency workers entering the space.

Recognizes that authorization to take KI must also be completed.

_____ _____ _____

  • 3. Determines there is or has been a Loss of Fuel Clad Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected to have a high iodine concentration. Determines KI must be issued.

Determines KI must be issued.

_____ _____ _____

CUE: When applicant determines KI must be issued, provide EP-AA-113-F-03 form and instruct applicant to complete form.

Job Performance Measure (JPM)

A-N-5-S Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

  • 4. Documents the decision to issue KI using THYROID BLOCKING AGENT AUTHORIZATION Form (EP-AA-113-F-03). BOTH individuals being authorized for KI and entering the space must be listed with their correct names and employee ID numbers: Clay Morrow 123456 Jax Teller

891011 _____ _____ _____ NOTE: If asked for Radiation Protection Manager to sign and date EP

-AA-113-F-03, enter name as "TIG TRAGER" and today's date in the appropriate blanks.

5. Notifies Occupational Health (Medical) Services Department promptly that KI is to be issued to Exelon Nuclear personnel or contractors.

Examinee states that he/she would notify OHS

. _____ _____ _____

NOTE: JPM is complete when applicant notifies OHS of KI use.

END JPM Stop Time

_________

Job Performance Measure (JPM)

A-N-5-S Page 8 of 9 Operator's Name:

Job Title: SRO JPM Title: AUTHORIZE USE OF KI Revision Number: 0 2

JPM Number: A-N-5-S Task Number and Title: 29900LK150 , Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.

K/A Number and Importance: Generic.2.4.

4 0 2.7 / 4.5

Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method: Simulate Alternate Path

Yes No Perform SRO Only: Yes No Time Critical:

Yes No Estimated Time to Complete:

20 minutes Actual Time Used:

minutes

References:

EP-AA-1 13-F-02, rev B; EP-AA-113-F-03, rev D; EP-AA-113 , rev 1 1 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name (Print): Evaluator's Signature:

Date:

Job Performance Measure (JPM)

A-N-5-S Page 9 of 9 INITIAL CONDITIONS

1. You are the Station Emergency Director.
2. A General Emergency has been declared.
3. There is an offsite release in progress.
4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS. 5. Containment is currently being challenged.
6. The TSC has NOT been activated, but the appropriate EAL has been declared. 7. An Emergency life saving operation MUST be performed.
8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
9. The operation requires two people to enter the field.
10. Clay Morrow , Employee ID
  1. 123456 and Jax Teller Employee ID
  1. 891011 have volunteered.
11. Clay and Jax have NEVER received an emergency exposure before.
12. Authorization for Emergency Exposure (EP

-AA-113-F-02 forms) have been filled out for Clay and Jax. INITIATING CUES

1. Execute section 4.4 of EP

-AA-113.