|
---|
Category:Annual Report
MONTHYEARML15110A2812015-04-0606 April 2015 Letter from Timothy M. Debey Revised (Corrected) the 2014 Annual Report for the U.S. Geological Survey Triga Non-Power Reactor Facility ML14051A5292014-01-30030 January 2014 Submittal of 2013 Annual Report for the U.S. Geological Survey Triga Reactor ML12030A0942012-01-23023 January 2012 Department of the Interior, Us Geological Survey - Annual Report for 2011 ML0703302122007-01-26026 January 2007 Submittal of Correction Page for the 2006 Annual Report of the U.S. Geological Survey Triga non-power Reactor Facility ML0702903702007-01-19019 January 2007 Us Geological Survey Triga Reactor Annual Report, January 1, 2006 - December 31, 2006 ML0601804752006-01-10010 January 2006 Submittal of Annual Report for U.S. Geological Survey Triga Non-Power Reactor Facility ML0502402642005-01-12012 January 2005 Submittal of Annual Report of the Geological Survey Triga Non-Power Reactor Facility ML0403002442004-01-14014 January 2004 Annual Report of the Us Geological Survey Triga Non-Power Reactor Facility, January 1 - December 31, 2003 ML0303003522003-01-22022 January 2003 Submittal of the Annual Report of the U.S. Geological Survey Triga 2015-04-06
[Table view] Category:Letter
MONTHYEARML24092A1542024-04-0404 April 2024 U.S. Geological Survey - Change of Facility Project Manager ML24092A0422024-03-28028 March 2024 U.S. Geological Survey Triga Reactor Annual Report Submittal in Accordance with Technical Specification 6.7.1 Rev. 00 for 2023 IR 05000274/20232022023-11-13013 November 2023 U.S. Geological - U.S. Nuclear Regulatory Commission Safety Inpsection Report No. 05000274/2023202 IR 05000274/20232032023-11-0909 November 2023 United States Geological Survey - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000274/2023203 (Public) IR 05000274/20232012023-02-27027 February 2023 United States Geological Survey - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000274/2023201 ML22026A4852022-03-0707 March 2022 Examination Confirmation Letter No. 50-274/OL-22-01, United States Department of Interior Geological Survey ML22053A1872022-02-22022 February 2022 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Reactor Administrator Succession IR 05000274/20212022021-10-0101 October 2021 U.S. Geological U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000274/2021202 IR 05000274/20212032021-09-30030 September 2021 United States Geological Survey - Nuclear Regulatory Commission Security Inspection Report No. 05000274/2021203 IR 05000274/20202012021-04-21021 April 2021 United States Geological Survey, U.S. Nuclear Regulatory Commission Routine Inspection Report05000274/2020201 - Cover Letter and Enclosure ML21090A1912021-03-29029 March 2021 U.S. Geological Survey Triga Reactor, Annual Report Submittal in Accordance with Technical Specification 6.7.1 Rev. 00 ML21082A2822021-03-23023 March 2021 Letter to R. Horton, USGS Denver Federal Center, from B. Smith, NRC, NRC Office of Investigations Report No. 4-2019-014 - Release of OI Synopsis IR 05000274/20212012021-03-12012 March 2021 U.S. Geological Survey NRC Non-Routine Inspection Report 05000274/2021201 ML20314A2922020-12-0303 December 2020 USGS Issuance of Amendment No. 14 to Renewed Facility Operating License No. R-113 for the USGS Triga Research Reactor Increasing the Special Nuclear Material Possession Limit ML20336A0202020-12-0101 December 2020 U.S. Geological Survey Triga Reactor - License Amendment Request LAR 14, Supplemental Information Letter 04 Provided in Response to Phone Call with NRC Project Manager at 0854 Mst on 2020-11-30 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20310A2962020-11-0505 November 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request LAR 14, Supplemental Information Letter 03 Provided in Resolution of Comments Presented by the State of Colorado During the Public M ML20310A3352020-11-0505 November 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Updated Physical Security Plan, Rev. Xxi ML20318A0882020-10-22022 October 2020 U.S. Geological Survey Trig a Reactor, License Amendment Request LAR 14, Supplemental Information Letter 01 Provided in Response to Audit Visit on 2020-10-15 Purpose ML20296A4902020-10-22022 October 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request LAR 14, Supplemental Information Letter 02 Provided in Response to Audit Visit on 2020-10-15 ML20295A5102020-10-21021 October 2020 U.S. Geological Survey - Regulatory Audit Report Proposed License Amended No. 14 to Increase the Special Nuclear Material Possession Limit ML20233A9962020-10-0909 October 2020 Us Geological Survey - Issuance of Amendment No. 13 to Renewed Facility Operating License No. R-113 to Amend Technical Specifications 3.1.3 and 4.1 for the Us Geological Survey Triga Research Reactor ML20279A5912020-10-0606 October 2020 U.S. Geological Survey - Regulatory Audit Proposed License Amendment No. 14 Tt Increase the Special Nuclear Material Possession Limit ML20279A3052020-10-0505 October 2020 U.S. Geological Survey - Acceptance of the Application for Proposed License Amendment No. 14 Increase in the Special Nuclear Nuclear Material Possession Limit ML20275A2672020-10-0101 October 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-02, LAR 14, Rev. 00 ML20199M1672020-07-20020 July 2020 NRC Letter and SER Authorizing USGS to Use an Alternate A2 Value ML20183A1622020-07-0202 July 2020 U.S. Geological Survey - Acceptance of the Application for a License Amendment Exception to TS 3.1.3 and 4.1 to Allow Fewer than 110 Fuel Elements When Either Shutdown or Operating at a Power Level Not Greater than 5 Kilowatts ML20177A6102020-06-25025 June 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01, Supplemental Information Provided in Response to ML20176A465 ML20161A1272020-06-0404 June 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01, Revision 01 ML20134J1082020-05-13013 May 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01 ML20157A0752020-05-0707 May 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Reactor Supervisor Appointment ML20136A3362020-04-21021 April 2020 Us Dept. of Interior, Geological Survey (Usgs), Submittal of Corrected 2019 Annual Report ML20134J1162020-04-10010 April 2020 7 of the Emergency Plan for the U.S. Geological Survey Triga Reactor (Gstr) Facility (License R-113, Docket 50-274) ML20087H0192020-03-0202 March 2020 Us Dept of Interior, Geological Survey (USGS) - Submittal of 2019 Annual Report ML19206A0622019-07-11011 July 2019 Us Dept of the Interior, Us Geological Survey Follow-Up on August 9, 2018 Letter Request for Approval for Use of Alternative A2 Value for Isotope Br-80m Under Appendix a to 10 CFR 71 ML19066A0542019-02-25025 February 2019 U.S. Dept of the Interior, Geological Survey, Reply to a Notice of Violation: EA-18-031 and EA-18-111 ML19044A3732019-01-31031 January 2019 Us Dept. of Interior, Geological Survey - Submittal of 2018 Annual Report ML18354B1702018-12-31031 December 2018 U.S Geological Survey-Notice of Violation and Proposed Imposition of Civil Penalty ML18324A5752018-11-16016 November 2018 United States Geological Survey (Usgs), Transfer of Reactor Supervisor Responsibilities. Position of Reactor Supervisor for Triga Facility Has Been Transferred from Mr. Brycen Roy to Mr. Christopher Farwell, Effective October 26, on Interim ML18324A5742018-11-16016 November 2018 United States Department of the Interior - Transfer of Reactor Administrative Responsibilities ML18325A1462018-11-0707 November 2018 U.S. Dept. of Interior, Geological Survey - Response to Apparent Violations Associated with NRC Investigation Reports 4-2017-027 and 4-2018-005; IA-18-038 IR 05000274/20182022018-08-15015 August 2018 United States Geological Survey - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-274/2018-202 ML18236A5512018-08-0909 August 2018 Request for Approval for Use of Alternative A2 Value for Isotope Br-80m Under Appendix a to 10 CFR 71 IR 05000274/20182032018-07-17017 July 2018 United States Geological Survey - U.S. Nuclear Regulatory Commission Security Inspection Report 05000274/2018203 ML18016A0512018-01-11011 January 2018 2017 Annual Report for the U.S. Geological Survey Triga Non-Power Reactor Facility ML17355A1472017-12-18018 December 2017 Establishing a Quality Assurance Program at the U.S. Geological Survey Triga Reactor Facility (License R-113, Docket 50-274) IR 05000274/20172012017-05-17017 May 2017 United States Geological Survey NRC Routine Inspection Report No. 50-274/2017-201 ML17074A6472017-04-19019 April 2017 United States Geological Survey TRIGA Reactor Closure of Confirmatory Action Letter No. NRR-03-005 on Site-Specific Compensatory Measures Implementation Plan ML17067A3942017-03-22022 March 2017 U.S. Geological Survey - Non-Power Reactor Closeout of Generic Letter 2016-01, "Monitoring of Neutron Absorbing Materials in Spent Fuel Pools," for the U.S. Geological Survey Training Reactor And Isotopes Production, General Atomics Research Reactor ML17046A3632017-02-17017 February 2017 Examination Report No. 50-274/OL-17-01, United States Geological Survey 2024-04-04
[Table view] |
Text
M USGS science for a changing world Department of the Interior US Geological Survey Box 25046 MS-974 Denver CO, 80225 January 30, 2014 U.S. Nuclear Regulatory Commission Document Control Desk Washington DC 20555
Dear NRC staff,
The 2013 annual report is herein submitted for the U.S. Geological Survey TRIGA non-power reactor facility.
This report is generated in compliance with our license conditions.
The facility docket number is 50-274.Sincerely, Timothy M. DeBey ýReactor Supervisor Enclosure Copy to: Greg Schoenebeck, OWFN 12 D20 vIA 2 I~3N U.S. GEOLOGICAL SURVEY TRIGA REACTOR ANNUAL REPORT JANUARY 1, 2013- DECEMBER 31, 2013 NRC LICENSE NO. R-113 -DOCKET NO. 50-274 I. Personnel Changes: Michael Feller was converted from a Pathways Intern-Temporary Position to a Pathways Intern-Career Position.II. Operating Experience The Geological Survey TRIGA Reactor (GSTR) was in normal operation for the year 2013. No major facility changes were made during the year.A synopsis of irradiations performed during the year is given below, listed by the organization submitting the samples to the reactor staff: Organization USGS -INAA USGS -Geochronology USGS -other Non-USGS Total Number of Samples 1059 1406 163 4255 6883 A. Thermal power calibrations were performed in January, July, September, November and December, with minor adjustments made to the instrumentation.
B. During the report period, 216 daily checklists and 12 monthly checklists were completed in compliance with technical specifications requirements for surveillance of the reactor facility.C. Tours were provided to individuals and groups during the year for a total visitor count of approximately 515.I Ill. Tabulation of Enerav Generated Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Totals MWh operated 64.953 44.617 71.531 81.784 173.855 99.735 88.045 167.033 116.397 45.766 58.873 45.846 1058.435 Critical hours 67h 54m 47h 7m 73h 52m 84h 24m 176h 50m 102h 51m 91 h 56m 169h 44m 119h 22m 49h 26m 75h 2m 59h 29m 1117h 57m Pulses 0 0 0 0 0 0 0 0 1 0 2 0 3 IV. Unscheduled Shutdowns Number 1116 1117 Date 12/5/13 12/5/13 Cause NP high power due to reg rod drive up button fail NP high power due to AUTO controller overshoot V. Significant Maintenance Operations 2/13 Replaced detector on CAM with LND7181 4/13 Replaced tank bulbs with LED arrays and 12.8 VDC power supply 7/13 Replaced purification system pump with a self-priming pump 7/13 Replaced sump pump in cooling tower area with similar submersible pump 9/13 Replaced ion exchange resin 11/13 Replaced the motor and belt on the Rm 151 hood fan unit 12/13 Replaced the reg rod UP switch 12/13 Replaced the high voltage adjustment potentiometer R6 in NP-1000 12/13 Replaced Action Paks with universal signal conditioners on RAMs 1 and 6 and on the continuous air monitor.12/13 Cleaned and repaired water feeder on secondary storage tank VI. Summary of 10 CFR 50.59 changes No 50.59 changes were made to the facility in CY 2013.A 50.59 screening form was established and approved in May for future use.2 VII. Radioactivity Releases A. Listed below are the total amounts of radioactive gaseous effluents released to the environment beyond the effective control of the reactor facility.Table 1. Gaseous Effluents Released to the Environment Month Argon-41 R-113 License Tritium (ETO 10CFR20 Allowable (mCi)
- Allowable (Ci) (Ci) (mCi)January 0.494 5.833 0.00 124 February 0.370 5.833 0.10 124 March 0.599 5.833 0.00 124 April 1.184 5.833 0.13 124 May 2.175 5.833 0.17 124 June 2.359 5.833 0.00 124 July 1.227 5.833 0.03 124 August 1.558 5.833 0.26 124 September 0.750 5.833 0.13 124 October 0.323 5.833 0.00 124 November 0.963 5.833 0.16 124 December 1.015 5.833 0.10 124 Total 13.017 70.00 1.08 1488% of Allowable 18.60% -------------------
0.073%* Note: The tritium concentrations are estimates based on the amount of water lost by evaporation from the reactor multiplied by the concentration of tritium as HTO.Tritium sample analyses were performed by Test America Laboratories.
B. No waste was shipped this calendar year.C. Throughout the year Na-24, Br-82, Co-60, Mo-99, and Tc-99m were observed on the CAM filter analyses.
The conservative estimated releases for these isotopes are in Table 2.Table 2. Releases of other isotopes in 2013 Isotope PCi pCi/ml 10 CFR 20 limits (pCi/ml) % of limit Na-24 5.71E-3 3.84E-16 7.OOE-09 5.48E-6 Br-82 4.07E-5 9.25E-15 5.OOE-09 2.05E-4 Co-60 4.07E-5 2.73E-18 2.OOE-10 1.37E-6 Mo-99 1.38E-1 1.09E-17 2.OOE-9 5.46E-7 Tc-99m 1.78E-3 1.20E-16 2.OOE-7 5.99E-8 VIII. Radiation Monitoring Our program to monitor and control radiation exposures included the four major elements below during the operating year.3
- 1. Nineteen gamma-sensitive area monitors are located throughout the Nuclear Science Building.
A remote readout panel is located in the reactor health physics office. High alarm set points range from 2 mR/hr to 50 mR/hr. High level alarms are very infrequent and due to sample movements.
- 2. One Continuous Air Monitor (CAM) does sampling of the air in the reactor bay.An equilibrium concentration of about 1.5 x 10-8 pCi/ml present for two minutes will result in an increase of about 500 cpm above background.
The alarm setpoints are a low-level alarm set at 3000 cpm and the high level alarm set at 10000 cpm. Reactor bay air is sampled during all reactor operations.
The fixed particulate air filter is changed each week and counted on a HPGE gamma spectrometer counting system.The charcoal filter, fitted behind the particulate air filter, is also changed and counted weekly. In all instances, sample data were less than airborne concentration values in 10 CFR Part 20, Appendix B, Table 2 for all particulate radioisotopes produced by the reactor.3. Contamination wipe surveys and radiation surveys with portable survey instruments are performed at least once a month. All portable instruments are calibrated with a 3-Curie (initial activity)
Cs-137 source traceable to NBS, and wipes are counted on a Gamma Products G5000w low level counting system. The highest removable contamination found was equal to 6277 pCi/1 00 cm beta-gamma, located in the reactor bay on top of the west white table on the south side. This area was successfully decontaminated below MDA. The next highest removable contamination found was equal to 2270 pCi/1 00 cm 2 beta-gamma, located in the reactor bay on top of the west white table on the north side. No areas were greater than 9.4 pCi/1 00 cm 2 alpha contamination.
This area was successfully decontaminated to acceptable levels.The roof area over the reactor tank is roped off and posted as a radiation area (averaging 2.5 mR/hr) during 1 MW operations.
- 4. LiF TLD dosimeters were used at four outdoor environmental stations.
Reactor facility visitors are issued self-reading dosimeters.
Reactor staff personnel are issued beta, gamma, albedo neutron badges.Table 3. Personnel Monitorin Results (12/1112 -11/30113)Whole Body (Rem) Whole Body (Rem) Extremity (Rem)Employee code Deep Dose Equiv. Shallow Dose Equiv.E0888 0.584 0.623 2.092 E0607 0.362 0.379 1.824 E0707 0.728 0.748 2.432 E0908 0.166 0.166 0.518 E0612 0.032 0.033 0.061 E0712 0.064 0.064 0.152 4 Reactor visitors and occasional experimenters wore pocket dosimeters that resulted in no individual's reading that was greater than 1.9 mrem per a visit and no cumulative total greater than 9.3 mrem.Table 4. Environmental Dose Results Dose Dose Dose Dose Total Location Jan-Mar Apr-June July-Sept.
Oct.- Dec.(RAD) (RAD) (RAD) (RAD) (RAD)Exhaust Stack 0.079 0.054 0.239 0.090 0.462 Cooling Tower 0.045 0.000 0.000 0.021 0.066 Fence West Vehicle 0.057 0.022 0.035 0.034 0.148 Gate West Room 0.074 0.080 0.085 0.126 0.365 151 Gate Southwest 0.029 0.000 0.000 0.012 0.041 Light Pole Control Ckgrou 0.046 0.051 0.050 0.044 0.191 (background)
Southeast 0.037* 0.000 0.000 0.010 0.074 Light Pole Rx0.128 0.096 0.106 0.101 0.431 Loading Dock 012*Badge exhibited an unusual response and the dose given is an estimate.Note: Above totals have the background subtracted (see control).
Environmental TLDs were supplied and analyzed by Mirion Technologies.
X. Environmental Monitoring There were several isotopes detected on the CAM filters throughout the year resulting in very small releases of Na-24, Br-82, Co-60, Mo-99, and Tc-99m through the normal air exhaust on the roof. The amounts released are shown in Table 2.Routine biennial environmental soil and water samples will be taken in the summer of 2014.5