| Q | CCA | Title |
---|
05000440/FIN-2012009-02 | 2012Q4 | H.14 | Failure to Implement Existing Plant Procedures |
05000440/FIN-2012009-03 | 2012Q4 | P.5 | Failure to Appropriately Control Access to a Locked High Radiation Area |
05000440/FIN-2012009-01 | 2012Q4 | | Parallel White PI Finding |
05000440/FIN-2012005-06 | 2012Q4 | | Failure to Follow Procedures That Ensure Safe Movement of a Dry Fuel Storage Canister |
05000440/FIN-2012005-01 | 2012Q4 | P.2 | Failure To Classify An Unusual Event |
05000440/FIN-2012005-02 | 2012Q4 | H.14 | Failure to Appropriately Control Access to a Locked High Radiation Area |
05000440/FIN-2012005-03 | 2012Q4 | P.5 | Inappropriate Procedures for Restoring LPCI Mode of RHR Following a LOCA at Mode 3 |
05000440/FIN-2012005-04 | 2012Q4 | P.5 | Deficiencies with Periodic Venting Procedures and Void Quantification |
05000440/FIN-2012005-05 | 2012Q4 | H.7 | Inadequate Fuel Handling Building Crane Maintenance Challenges Single-Failure-Proof Compliance |
05000440/FIN-2012005-07 | 2012Q4 | | Follow-Up to Occupational Radiation Safety Performance Indicator Verification |
05000440/FIN-2013002-01 | 2013Q1 | H.5 | Inadequate Procedure Resulted in Loss of High-Pressure Core Spray Function |
05000440/FIN-2013002-02 | 2013Q1 | H.12 | Valve Mis-position Causes SDV Level Detector Inoperability |
05000440/FIN-2013002-03 | 2013Q1 | H.12 | Failure to Follow Procedures for Conducting a Standby Liquid Control System Surveillance |
05000440/FIN-2013002-04 | 2013Q1 | P.2 | Failure to Perform Vendor Recommended Preventive Maintenance on the Balance-Of-Plant Static Transfer Switch |
05000440/FIN-2013404-01 | 2013Q1 | H.8 | Security |