Category:License-Operator
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23114A1542023-03-23023 March 2023 03 Public Forms 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22147A1882022-04-13013 April 2022 04 Public Forms ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17240A3832017-06-15015 June 2017 2017-06-Post Exam Analysis ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments ML18045A4902017-06-15015 June 2017 2017-06 - Final Retake Written Exam Outlines 2024-09-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23114A1542023-03-23023 March 2023 03 Public Forms ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22147A1882022-04-13013 April 2022 04 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams ML17240A3832017-06-15015 June 2017 2017-06-Post Exam Analysis ML18045A4902017-06-15015 June 2017 2017-06 - Final Retake Written Exam Outlines ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms 0CAN051701, Response to Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations.2017-05-0303 May 2017 Response to Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations. 2024-09-09
[Table view] |
Text
2012 Written Exam Analysis Rev 1 20 12 Initial RO/SRO Exam Analysis Comments Exam Q# Bank QID Comment: 17 1836 Question had a 100% (11/11) failure rate
. There were no student comments logged for this question during the exam. STM 2-30, Main Generator Construction and Controls, Rev. 9, section 2.8.7 states the concern for rotor overheating. Annunciator 2K02 C
-3, Negative Sequence HI, OP
-2203.012B, Rev. 036, for the MTG also states concern for rotor overheating.
Lesson Plan A2LP
-RO-MGEN, Obj. 8, (describe the alarms and Annunciators Corrective Actions for all Main Generator alarms on 2K02. Include in the discussion with the class if a manual trip or Turbine trip is required) covers this condition.
Training Evaluation Action Request (TEAR: ANO-2012-598) was written to evaluate the ILO program. No changes to this exam will be made.
24 1845 Question had a 5 5% (6/1 1) failure rate
. There were no student comments logged for this question during the exam. The question relates the fundamentals of reducing the heat load on the RCS (reason/criteria for securing RCPs
) during a Primary to Secondary leak event. Covered in Lesson Plan A2LP-RO-APSEC, Objective 3, Discuss the basis / strategy as stated in OP
-2203.038 Technical Guidelines, for actions directed by the AOP
. Five of the six students that missed the question selected securing 2 RCPs to minimize RCP differential pressure to minimize leakage (distracter B). One of the six students that missed the question selected To prevent violating the RCPs minimum NPSH requirements (distracter A). No changes to this exam will be made.
43 1864 Question had a 73% (8/1 1) failure rate.
There were no student comments logged for this question during the exam. The question relates the fundamentals of a component controller input to the automatic response of the controlling system. System response to this type of failure is covered in STM 2-69, Feedwater Control System Systems Training Manual (STM 2
-69) section 2.5.3, the normal operating procedure OP-2106.007, Main Feedwater Pump and FWCS Operations, section 3.0 (description) and in lesson plan A2LP-RO-FWCD, o bjective 6, Describe the interlocks and automatic actuations of the following components: Condensate pumps, condensate pump recirculation valves, and o bjective 12, Describe the location, indication, alarm and control functions of: Main feedwater Flow Elements, Main Feedwater Pressure Switches.
Training Evaluation Action Request (TEAR: 2012-599) was written to evaluate the ILO program. No changes will be made to the exam or QID.
2012 Written Exam Analysis Rev 1 93 1914 Question had a 5 0% (2/4) failure rate.
There were no student comments logged for this question during the exam.
The question deals with the loss of the main fire detection panel (which procedure will direct response for the loss) and the administrative requirement s needed due to the loss of the fire panel.
The Two students that missed the question choose distracter A (correct procedure but wrong admin requirements).
Lesson Plan A2LP-RO-FPROT, o bjective 8: Describe the actions taken for a loss of 2C343, covers the correct action that needed to be taken. The failure rate appears to be related to unfamiliarity with the administrative requirements portion associated with the ACA actions
. Recommend reviewing the RO program and adjust as necessary to ensure administrativ e knowledge for required ACA actions is included in the course at the proper level of detail.
No changes will be made to the exam or QID.
100 1921 Question had a 5 0% (2/4) failure rate.
This question deals with understanding the procedure strategies a nd prioritizing simultaneous AOP and post trip actions. The two candidates that missed the question both chose distracter B which incorrectly placed continuing actions for a loss of instrument air event after initial post trip actions are complete versus in conjunction with the post trip actions. This strategy is taught primarily in the simulator sessions practicing implementation of the Loss of Instrument Air AOP.
There are also opportunities in the classroom lesson for the AOP.
There doesn't appear to be any gap in the program material for this topic, however, since this question was not specifically debriefed with the class after the exam, a training action has been assigned to ensure that the students that missed the question understand the correct response and also give opportunity for feedback regarding training strategy for this procedure concept. Training tracking action TEAR
-ANO-2012-632 submitted.
No changes will be made to the exam or QID.
NO changes to this Exam