ML17018A123

From kanterella
Revision as of 18:12, 6 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Management Directive 8.3 Evaluation for Palo Verde Unit 3 Emergency Diesel Generator Failure
ML17018A123
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/17/2017
From: Miller G B
NRC/RGN-IV/DRP/RPB-D
To: Kennedy K M
Region 4 Administrator
Miller G B
References
MD 8.3
Download: ML17018A123 (5)


Text

January 17, 201 7 MEMORANDUM TO:

Kriss M. Kennedy, Regional Administrator THRU: Troy W. Pruett, Director /RA/ Division of Reactor Projects FROM: Geoffrey B. Miller, Chief /RA/ Project Branch D

SUBJECT:

MANAGEMENT DIRECTIVE 8.3 EVALUATION FOR PALO VERDE UNIT 3 EMERGENCY DIESEL GENERATOR FAILURE

Pursuant to Regional Office Policy Guide 0801, "Management Directive 8.3 and Inspection Manual Chapter 0309 Reactive Team Inspection Decisions, Implementation

, and Documentation for Power Reactors," the enclosed table provides the Management Directive 8.3 evaluation for determining that a Special Inspection T eam inspection will be conducted at Palo Verde for the catastrophic failure of the Unit 3 emergency diesel generator

. Concur with Recommendation:

/RA/ 1/17/17 Kriss M. Kennedy Date Regional Administrator

Enclosure s: MD 8.3 Decision Documentation Form (Deterministic and Risk Criteria Analyzed)

CONTACT: Geoffrey B. Miller 817-200-1173 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011

-4511

ML17018A123 SUNSI Review By: JLD ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4/A.7 OFFICE RIV:SPE:DRP SRA:DRS/PSB2 C:DRP/D D:DRS D:DRP NAME JDixon DLoveless GMiller AVegel TPruett SIGNATURE /RA Geoff Miller for

/ /RA/ /RA/ /RA/ /RA/ DATE 12/27/16 1/5/17 1/9/17 1/9/17 1/10/17