|
---|
Category:Letter
MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML23219A0042023-09-0101 September 2023 Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23212B2652023-07-27027 July 2023 Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches ML23200A1232023-07-21021 July 2023 Transmittal Letter for the St. Lucie SLRA Review L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) ML23184A0352023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 ML23109A1132023-04-30030 April 2023 SLRA Change Schedule Letter L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report 2024-01-08
[Table view] |
Text
Sp.I' REGu "o UNITED STATES <( . -. Cl >-,_-.
- 0 ti) -I 0 * . ;: "' .* ;;; NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 '("/1' fl ' ') "1!-0 ***1<. Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy P.O. Box 14000 Juno Beach, Florida 33408-0420 August 19, 2015
SUBJECT:
ST. LUCIE PLANT, UNIT NO 2 -REVIEW OF THE SPRING 2014 STEAM GENERA TOR TUBE INSERVICE INSPECTION REPORT FOR REFUELING OUTAGE 21 (TAC NO. MF4847)
Dear Mr. Nazar:
By letter dated September 18, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14279A237), Florida Power and Light Company (the licensee) submitted information summarizing the results of the spring 2014 steam generator tube inspection report, for the twenty-first St. Lucie Unit No. 2 Refueling Outage in accordance with Technical Specification (TS) Section 6.9.1 12. In addition to the above report, the U.S. Nuclear Regulatory Commission (NRC) staff summarized a conference call held with the licensee in a letter dated August 8, 2014 (ADAMS Accession No. ML 14189A090). Also, the licensee submitted additional information regarding the 2014 inspections in letters dated March 23 (ADAMS Accession No. ML 15091A306) and June 18, 2015 (ADAMS Accession No. ML 15190A336). The NRC staff has completed its review of these submittals and concludes that the licensee provided the information required by its TSs and that no additional followup is required at this time. The NRC staff's review of the report is enclosed. Docket No. 50-389
Enclosure:
Inspection Summary Report cc w/encl: Distribution via ListServ Sincerely, ,:;#.,/clc-l Fandeh E. Saba, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REVIEW OF THE 2014 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT ST. LUCIE PLANT, UNIT NO. 2 DOCKET NO. 50-389 TAC NO. MF4847 By letter dated September 18, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14279A237), Florida Power & Light Company (the licensee) submitted information summarizing the results of the spring 2014 steam generator (SG) tube inspections performed at St. Lucie Unit No. 2. These inspections were performed during Refueling Outage 21 (RFO 21). The U.S. Nuclear Regulatory Commission (NRC) staff summarized a conference call held with the licensee in a letter dated August 8, 2014 (ADAMS Accession No. ML 14189A090). The licensee submitted additional information regarding the 2014 inspections in letters dated March 23 (ADAMS Accession No. ML 15091A306) and June 18, 2015 (ADAMS Accession No. ML 15190A336). St. Lucie Unit No. 2 has two Model 86/19TI replacement SGs that were manufactured by AREVA and installed in 2007. Each SG has 8,999 thermally treated Alloy 690 tubes with a nominal outside diameter of 0.75 inch and a nominal wall thickness of 0.043 inch. During manufacturing, all tubes were hydraulically expanded at both ends over the full depth of the tubesheet. The tubesheet was drilled on a triangular pitch with 1.0-inch spacing, center-to-center. The radius of the row 1 U-bends is 4.134 inches. The U-bends in rows 1 through 15 were stress relieved after bending. Seven Type 410 stainless steel support plates (each 1.181 inches thick with broached trefoil holes) support the vertical section of the tubes. Four sets of anti-vibration bars (each 0.112 inch thick and made from Type 405 stainless steel) support the U-bend section of the tubes. The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions, such as tube plugging, taken in response to the inspection findings. The tubes in both SGs were inspected during this refueling outage. Based on its review of the reports submitted, the NRC staff has the following observations and comments:
- The four feedring inspection port covers (two per SG) were found to be loose during secondary side inspections. The loose covers allowed the feedrings to drain, which created a steam void in the feedring system resulting in a water hammer event in the feedrings that damaged the feedring supports for both SGs. The supports were repaired during RFO 21 and all four inspection port covers were replaced with welded end caps to prevent loosening in the future. Enclosure
- One tube located in row 91, column 24 (R91 C24) of SG A was plugged due to wear associated with a neighboring (R90C23) V-shaped support pad. The V-shaped support pads support the anti-vibration bar system. This is the first reported occurrence of this type of wear at St. Lucie Unit No. 2. Contact between the V-shaped support pad and adjacent tubes is not expected by design and the discovered indication is likely the result of misalignment of the V-shaped support pad during manufacturing. Based on its review, the NRC staff concludes that the licensee submitted the information required by its TSs. In addition, the staff concludes there are no technical issues that warrant followup action at this time, since the inspections appear to be consistent with the objective of detecting potential tube degradation, and inspection results appear to be consistent with industry operating experience at similarly designed and operated units. Although the number of wear indications is greater than the number of wear indications found at other AREVA SGs of similar age, the depths of these indications (i.e., the severity) are comparable to those observed at other plants.
Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
ST. LUCIE PLANT, UNIT NO. 2 -REVIEW OF THE SPRING 2014 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT FOR REFUELING OUTAGE 21 (TAC NO. MF4847)
Dear Mr. Nazar:
By letter dated September 18, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14279A237}, Florida Power and Light Company (the licensee) submitted information summarizing the results of the spring 2014 steam generator tube inspection report, for the twenty-first St. Lucie Unit No. 2 Refueling Outage in accordance with Technical Specification (TS) Section 6.9.1.12. In addition to the above report, the U.S. Nuclear Regulatory Commission (NRC) staff summarized a conference call held with the licensee in a letter dated August 8, 2014 (ADAMS Accession No. ML 14189A090). Also, the licensee submitted additional information regarding the 2014 inspections in letters dated March 23 (ADAMS Accession No. ML 15091A306) and June 18, 2015 (ADAMS Accession No. ML 15190A336). The NRC staff has completed its review of these submittals and concludes that the licensee provided the information required by its TSs and that no additional followup is required at this time. The NRC staff's review of the report is enclosed. Docket No. 50-389
Enclosure:
Inspection Summary Report Sincerely, Farideh E. Saba, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc w/encl: Distribution via ListServ DISTRIBUTION: PUBLIC LPL2-2 R/F RidsNrrPMStLucie Resource RidsNrrLABClayton Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl2-2 Resource RidsRgn2MailCenter Resource RidsNrrDeEsgb Resource AJohnson, NRR KKarwoski, NRR ADAMS A No.: ML 15209A646 *b OFFICE LPL2-2/PM LPL2-2/LA ESGB/BC* LPL2-2/BC LPL2-2/PM NAME PBuckberg BClayton GKulesa SHelton FSaba DATE 07/28/15 07/28/15 07/13/15 08/17/15 08/19/15 OFFICIAL AGENCY COPY