MONTHYEARL-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-015, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-029, 2023 Annual Operating Report2024-02-28028 February 2024 2023 Annual Operating Report L-2024-026, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-02-27027 February 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) 2024-08-07
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 ML23013A2032023-01-13013 January 2023 RAI Set 4 Draft Response L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-156, Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response2022-09-19019 September 2022 Correction to Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 1a Response L-2022-143, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response2022-09-0808 September 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 1A Response L-2022-115, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment2022-08-0909 August 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 3 Response and Submittal of Superseded Response for One Set 2 RAI and One Supplement 1 Attachment L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response2022-07-11011 July 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response2022-06-13013 June 2022 Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response L-2022-000, License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response2022-01-19019 January 2022 License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response L-2021-105, Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements2021-05-12012 May 2021 Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements L-2021-065, Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years2021-04-0101 April 2021 Response to Request for Additional Information. Relief Request Number RR 15, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years L-2020-165, Supplement to Updated Final Response to NRC Generic Letter 2004-022020-12-0404 December 2020 Supplement to Updated Final Response to NRC Generic Letter 2004-02 L-2020-094, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2020-06-26026 June 2020 Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements L-2020-061, Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2020-04-30030 April 2020 Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements ML20015A0282020-01-14014 January 2020 NMFS to NRC, Concurrence with Interim Response to Requests for Additional Information for St. Lucie Endangered Species Act Section 7 Consultation L-2019-164, Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control2019-09-11011 September 2019 Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control L-2019-166, Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response2019-08-21021 August 2019 Refueling Outage SL2-24 Steam Generator Tube Inspection Report RAI Response L-2019-153, Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-25025 July 2019 Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-149, Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-24024 July 2019 Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-118, Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation2019-06-28028 June 2019 Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation L-2019-107, License Amendment Request - Iodine Removal System Elimination2019-05-17017 May 2019 License Amendment Request - Iodine Removal System Elimination L-2019-056, Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request2019-03-0707 March 2019 Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request L-2018-205, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies2018-11-15015 November 2018 Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies L-2018-153, Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies2018-08-17017 August 2018 Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies L-16-001, Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2018-05-24024 May 2018 Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. L-2018-068, Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations2018-04-0303 April 2018 Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations L-77-291, Attachment a to L-77-291 Response to NRC Questions of May 24, 19772018-03-29029 March 2018 Attachment a to L-77-291 Response to NRC Questions of May 24, 1977 L-2018-040, Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply2018-02-14014 February 2018 Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b2018-02-0101 February 2018 Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b L-2017-210, Updated Final Response to NRC Generic Letter 2004-022017-12-20020 December 2017 Updated Final Response to NRC Generic Letter 2004-02 L-2017-216, License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 62017-12-19019 December 2017 License Renewal Commitments: Reactor Vessel Internals Aging Management Plan, Clarification of Responses to RAI 1 and RAI 6 L-2017-209, Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-012017-11-30030 November 2017 Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-01 L-2017-159, Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 02017-09-13013 September 2017 Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0 L-2017-116, Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.52017-07-0303 July 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5 L-2016-220, License Amendment Request EDG Day Tank Fuel Volume Change2016-12-0505 December 2016 License Amendment Request EDG Day Tank Fuel Volume Change L-2016-188, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)2016-11-0303 November 2016 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) L-2016-153, Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes2016-08-11011 August 2016 Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes L-2016-135, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B2016-07-22022 July 2016 Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B L-2016-143, Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents2016-07-15015 July 2016 Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents L-2016-114, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48.2016-07-0808 July 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48. L-2016-102, RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes2016-05-0606 May 2016 RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes L-2016-104, RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle2016-05-0606 May 2016 RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle L-2016-096, Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 02016-04-21021 April 2016 Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 0 2024-06-26
[Table view] |
Text
0 IF=PL.
June 18, 2015 L-2015-179 10 CFR 50.4 10 CFR 50.55a U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-000 1 Re: St. Lucie Unit 2 Docket No. 50-3 89 Response to Request for Additional Information Regarding the Spring 2014 Steam Generator Tube Inspections
References:
- 1. FPL letter L-2014-291 dated September 18, 2014: Steam Generator Tube Inspection Report (ML14279A237)
- 2. FPL letter L-2015-089 dated March 23, 2015: Response to Request for Additional Information Regarding the Spring 2014 Steam Generator Tube Inspections (MvL 15091 A306).
- 3. NRC Letter dated May 11, 2015: St. Lucie Plant, Unit 2 - Request for Additional Information (RAI) Regarding the Spring 2014 Steam Generator Tube Inspections. (MLI 15114A3 83)
Per Reference 1 above, Florida Power and Light Company (FPL) submitted information summarizing the results of the spring 2014 steam generator tube inspections performed at St. Lucie, Unit 2. FPL responded to the NRC staff first round of requests for additional information (RAIs) by letter dated March 23, 2015 (Reference 2).
By letter dated May 11, 2015 (Reference 3), the NRC Staff requested additional information regarding the spring 2014 steam generator tube inspections. The attachment to this letter provides the detailed response to the requests for additional information.
Please contact Richard Sciscente at (772) 467-7156 if there are any questions about this submittal.
Sincerely, Eric Katzman Licensing Manager St. Lucie Plant ESK/rcs Attachment cc: USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Units 1 and 2 Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
L-2015-179 Attachment Page 1 of 3 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING THE SPRING 2014 STEAM GENERATOR TUBE INSPECTIONS By letter dated September 18, 2014 (M1L14279A237), FPL submitted information summarizing the results of the spring 2014 steam generator tube inspections performed at St. Lucie, Unit 2. FPL responded to the NRC staff first round of requests for additional information (RAIs) by letter dated March 23, 2015 (M1LI5091A306).
The NRC staff reviewed the information FPL provided and determined that the following additional information (RAIs 8 - 12) is needed in order to complete their review.
RAI-8
The Florida Power and Light Company (FPL), in its response to RAI-3, by letter dated March 23, 2015, indicates that no degradation related to Nuclear Safety Advisory Letter 12-01 was detected, which could imply that some corrosion degradation was detected. Confirm that no corrosion related degradation was found in the channel head.
Response
The channel head was inspected for degradation during condition monitoring. This included inspections related to NSAL 12-01. No corrosion-related degradation was found in the channel head.
RAI-9
FPL, in its response to RAI-4, by letter dated March 23, 2015, indicates that the analysis performed for the loose parts has been evaluated within the corrective action program, but no results were provided.
Confirn that the analysis supported a full cycle of operation.
Response
A wear evaluation wias performed for the loose parts. The evaluation focused on the threaded metal bezel component of the loose parts since the tube wear results for other lens/cover components (rubber gasket, glass lens, retaining ring) are bounded by that of the metal bezel component. The wear evaluation performed showed that a 40% through-wail wear life is estimated at 73 years of full power operation at the uprated power level. Thus, the analysis performed for the loose parts supported a full cycle of operation.
L-2015-179 Attachment Page 2 of 3
RAI-10
Clarify the difference between U-bend apex (AV4/5) wear, AVB [anti-vibration bar]-transition tube wear, V-shaped support pad wear, and V-shaped support bar wear. For example, does U-bend apex (AV4/5) wear mean wear at the apex on the extrados of the tube as a result of the tube interacting with the bottom edge of the AVB? Does AVB-transition tube wear mean wear at the apex on the flank of the tube as a result of the tube interacting with side of an AVB? Does V-shaped support pad wear mean wear as a result of the tube interacting with the support pad "sitting" on that tube, whereas V-shaped support bar wear is wear on a tube from the tube interacting with a neighboring tubers V-shaped support bar?
Response
Background:
Each St. Lucie Unit-2 SG is equipped with 4 sets of V-shaped anti-vibration bars (AVBs) for U-bend bundle support. Each AVB set is required by design to be inserted into the bundle to a prescribed depth "knownas the "minimum required depth". To provide additional stability to the bundle, the upper 3 sets of AVB supports have been inserted two rows deeper into the bundle, than required. This is referred to as the "as-fabricated depth". AVB insertion depths are summarized in Table 1 below.
Table 1: AVB Support Depths Minimum Required As-Fabricated Depth AVB Support Depth (tube row) (tube row)
AV4-AV5 72 70 AV3-AV6 43 41 AV2-AV7 20 18 AV 1-AV 8 1 1 A transition row is the lowest tube row (in a series of vertically stacked tube rows) that is supported by the AVB support. Thus, for St. Lucie Unit 2 the transition rows are identical to the ones listed in the "as-fabricated" depths column in Table 1. The region where the apex of the transition row intersects the bottom portion of the AVB support is referred to as the "crossover region". In this region, the centerline of the transition row's U-bend (concave down) coincides with centerline of the AVB bottom (concave up), as shown in the sketch in the Response to RAI-7 (ML15091A306).
AVB Transition Tube wear: Wear occurring in the "as-fabricated" transition rows (rows 70, 41, 18 and 1) at the crossover region. Wear is located at the flank of the tube. To date, AVB Transition Tube Wear has only been identified in Row 41 in the St. Lucie Unit 2 SGs.
U-Bend Apex wear (AV4/5): Wear occurring in a lower tube row (deeper in bundle) that is below the "as-fabricated" transition rows in the St. Lucie Unit 2 SGs. To date, U-Bend Apex wear has only been identified in Row 69 tubes. The wear mechanism is acting similar to the AVB Transition Tube wear at the crossover region where the tube and the AVB support overlap, and is located on the flank of the tube as supported by ECT data. The designation "U-Bend Apex wear" is used to identify the difference in location within the tube bundle as compared to the AVB Transition Tube wear.
V-Shaped Support Pad wear: Wear occurring on a V-Shaped Support Pad tube (also referred to as a "parent tube"), on the extrados/flank of the tube. The wear is a result of the tube interacting with the support pad "sitting" on that tube.
V-Shaped Support Bar wear: Wear occurring on a tube adjacent to a V-Shaped Support Pad, where the side of the V-Shaped Support Pad comes into contact with the flank of the adjacent (neighboring) tube.
The wear on the tube is from the tube interacting with a neighboring tubers V-shaped support bar.
L-2015-179 Attachment Page 3 of 3
RAI-11
FPL, in its response to RAI-6 by letter dated March 23, 2015, indicates that the tube is supported by the V-shaped support pad. Clarify whether the tube is supported by the V-shaped support pad or whether the V-shaped support pad supports the U-bend supports (by "sitting/resting" on the tube).
Response
The V-shaped support pads provide support to the "AVB system" by resting on select peripheral tubes (also referred to as "parent" tubes or "support" tubes). The "AVB system" consists of U-bend support components including AVBs, AVB end-clamping devices (also called comb/clamp systems) and hoops (which link the AVBs, comb and bundle wrapper together).
RAI-12
The U.S. Nuclear Regulatory Commission staff noticed that the number of indications reported in FPL's response to RAI-5, by letter dated March 23, 2015, is slightly different than what was provided during a conference call on March 20, 2014 (refer to summary of conference call dated August 8, 2014, (ADAMS Accession No. ML14189A090)). Confirm that the values in response to RAI-5 are correct. Is the difference in the number of indications/tubes due to various factors such as completing the inspection (including confirming the nature/presence of the indication with a rotating or array probe), performing quality assurance checks, and possibly reclassifying some of the March 2014 indications as other types of wear (V-shaped support pad/bar wear, etc.)? Also, confirm whether there were 16 indications in 16 tubes attributed to U-bend apex wear in Steam Generator (SG) A (or whether the 16 indications were in 15 tubes since your September 18, 2014, report implies that the 16 indications were in 15 tubes rather than 16 tubes in SG A).
Response
The information provided during the March 20, 2014 conference call was preliminary, as documented in the August 8, 2014 Conference Call Summary (ML14189A090). Bobbin probe exams and the "special interest" (+PointTM) exams were not yet completed as of the March 20, 2014 conference call.
In summary, the values in response to RAI-5 are correct with the following exception: with respect to the "Number of affected tubes" at the "U-bend Apex (AV4/5)" location of SG-2A, the value reported in RAI-5 should have been 15 rather than 16 tubes.