ML113360596

From kanterella
Revision as of 09:42, 2 April 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Three Mile Island, Unit 1 - Request for Additional Information Regarding Proposed License Amendment Revising Technical Specifications to Incorporate Administrative Changes (TAC No. ME7357)
ML113360596
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 12/19/2011
From: Bamford P J
Plant Licensing Branch 1
To: Pacilio M J
Exelon Nuclear
Bamford, Peter J., NRR/DORL 415-2833
References
TAC ME7357
Download: ML113360596 (4)


Text

UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 December 19, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 THREE MILE ISLAND, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT REVISING TECHNICAL SPECIFICATIONS TO INCORPORATE ADMINISTRATIVE CHANGES (TAC NO. ME7357) Dear Mr. Pacilio: By letter dated October 18, 2011 (Agencywide Documents Access and Management System Accession No. ML 112911548), Exelon Generation Company, LLC (Exelon, the licensee) submitted a license amendment request (LAR) proposing to revise the Technical Specifications (TSs) for Three Mile Island Nuclear Station, Unit 1. The LAR proposes to make certain administrative changes to the TSs. The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on December 2, 2011, to Ms. Wendi Croft, of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. The draft questions were discussed in a teleconference with your staff on December 13, 2011. It was agreed that a response to this RAI would be submitted by January 20, 2012. Please contact me at 301-415-2833, if you have any questions. Sincerely, . /J. Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 Enclosure: As stated cc: Distribution via Listserv REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND, UNIT 1 PROPOSED ADMINISTRATIVE CHANGES TO THE TECHNICAL SPECIFICATIONS DOCKET NO. 50-289 By application dated October 18, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 112911548), Exelon Generation Company, LLC (Exelon, the licensee) submitted a license amendment request regarding proposed changes to the technical specifications (TSs) for Three Mile Island, Unit 1 (TMI-1). The proposed amendment involves administrative changes. The proposed changes include correcting typographical errors, removing unwarranted formatting, clarifying symbols and pages, reformatting of previously deleted pages, incorporating a consistent abbreviation of average reactor coolant temperature, deleting notes that are no longer applicable, and replacing certain drawing figures with versions that are more clear and which correct references to a previous licensee name (AmerGen). The Nuclear Regulatory Commission (NRC) staff has been reviewing the submittal and has determined that additional information is needed to complete its review. In the application, Attachment 1, page 3 of 6, the tenth bullet states, "TS 3.5.2.5.b.1 and 2 on page 3-35 are edited to remove an erroneous period (.)." The existing TS 3.5.2.5.b.1 does not appear to contain an erroneous period. Please clarify or correct the submittal. The submitted markup and "clean copy" page versions (Attachments 2 and 3, respectively) for TS page 4-5 do not appear to reflect the current TS page 4-5. Specifically, they do not appear to reflect changes authorized by TMI-1 TS Amendment 273, dated May 27,2010 (ADAMS Accession No. ML092740791), and letters dated March 4,2011 (ADAMS Accession No. ML 110550707), and October 27, 2011 (ADAMS Accession No. ML 112980458). In particular, item numbers 23 and 24 on page 4-5 appear to be in error. A similar problem affects pages 1-3 and 3-35. Please submit corrected markup and "clean copy" versions of these pages, as appropriate. According to the application, Attachment 1, page 4 of 6, TS Figure 5-1 has been updated for clarity and to revise the title box to reflect Exelon, the current licensee. TS Figure 5-1 is referenced by TS 5.1.1 (note that TS 5.1.1 refers to Figure 5.1) and describes it as an "extended plot plan," consistent with the List of Figures on TS page vii. TS 5.1.1 also states that Figure 5.1 (5-1) shows the TMI Exclusion Area. The extended plot plan title and the exclusion area depiction have been removed from the revised Figure 5-1, making TS 5.1.1 confusing and incorrect. In addition, TS 5.1.1 states that Figure 5.1 1) shows the immediate surroundings, however the revised Figure 5-1 has eliminated some of the surrounding features such as the depiction of the offsite Enclosure transmission lines. Please correct the revised Figure 5-1 consistent with the existing TS 5.1.1, and/or justify any desired changes to Figure 5-1, the List of Figures, and/or TS 5.1.1. 4.) TS 5.1.1 describes Figure 5-2 as depicting the site topography for a radius of 5 miles from the station. The revised Figure 5-2 appears to have deleted the topographical lines. Therefore, please submit a revised Figure 5-2 that includes topographical information or justify, and submit, a revised TS 5.1.1. The NRC staff also has several observations regarding the submittal and the existing TSs. As described above, the NRC staff notes that TS 5.1.1 refers to Figure 5-1 as Figure 5.1. Exelon should consider clarifying this discrepancy. In addition, the NRC staff notes that TS 5.1.1 refers to a "weather tower" depicted on Figure 5-3. Both the existing and revised Figure 5-3 depictions show a "weather station." Exelon should consider making this terminology consistent. Finally, the existing TS 5.1.1 refers to AmerGen Energy Company, LLC in the description of Figure 5.1 (5-1). Exelon should evaluate whether this is the correct terminology.

December 19, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville,IL 60555 THREE MILE ISLAND, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT REVISING TECHNICAL SPECIFICATIONS TO INCORPORATE ADMINISTRATIVE CHANGES (TAC NO. ME7357) Dear Mr. Pacilio: By letter dated October 18, 2011 (Agencywide Documents Access and Management System Accession No. ML 112911548), Exelon Generation Company, LLC (Exelon, the licensee) submitted a license amendment request (LAR) proposing to revise the Technical Specifications (TSs) for Three Mile Island Nuclear Station, Unit 1. The LAR proposes to make certain administrative changes to the TSs. The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on December 2, 2011, to Ms. Wendi Croft, of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. The draft questions were discussed in a teleconference with your staff on December 13,2011. It was agreed that a response to this RAI would be submitted by January 20, 2012. Please contact me at 301-415-2833, if you have any questions. Sincerely, Ira! Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 Enclosure: As stated cc: Distribution via Listserv DISTRIBUTION: RidsNrrPMThreeMilelsland Resource PUBLIC LPLI-2 RtF RidsAcrsAcnw_ MailCTR Resource RidsNrrLMBaxter Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource RidsNrrDorlDpr Resource RidsN rrDorlLpl1-2 Resource ADAMS Accession Number: ML113360596

  • via email II OFFICE LPL1*2/PM LPL 1-2/LA LPLI*2/BC I NAME PBamford ABaxter* HChernoff II (REnnis for) I II DATE 12/13/2011 12/15/11 12/19/11 OFFICIAL RECORD COPY