2013 Clinton Power Station Initial License Examination Proposed Exam Submittal Letter
ML13231A215
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/21/2013
From:
NRC/RGN-III
To:
Exelon Generation Co
Shared Package
ML11354A437 List:
References
U-604127 50-461/13-301
Download: ML13231A215 (4)


Text

2013 CLINTON POWER STATION INITIAL LICENSE EXAMINATION PROPOSED EXAM FILES

  • *
  • Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604127 June 21, 2013 Regional Administrator Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Exelon Generation

Subject:

Clinton Power Station Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials which Exelon Generating Company (EGC}, is submitting in support of the Initial License Examination scheduled for the weeks of August 19, 2013 and August 30, 2013 at Clinton Power Station . This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance

Measures, and Integrated Plant Operation Scenario Guides. These examination materials have been developed in accordance with NUREG-1021, "Operating Licensing Examination Standards",

Revision 9 Supplement

1. Please note that reference materials are attached to each individual examination question or item. Some minor modifications have been made to the Integrated Examination Outline with regard to the operational scenarios in order to improve balance and content.

These changes improve examination quality and are in compliance with NUREG 1021, "Operating Licensing Examination Standards",

Revision 9 Supplement

1. In accordance with NUREG-1021, Section ES-201, "Initial Operator Licensing Examination Process",

please ensure that these materials are withheld from public disclosure until after the examinations are complete.

There are no regulatory commitments contained in this letter. Should you have any questions related to this information, please contact Mr. Christopher Dunn at (217) 937-4000

. William G. Noll Site Vice President Clinton Power Station

  • *
  • U.S. Nuclear Regulatory Commission U-604127 Page 2 DRNblf Attachments cc: Chief, NRC Operator Licensing Branch (without Attachments)

NRC Senior Resident Inspector-Clinton Power Station (without Attachments)

  • * * 'U.S. Nuclear Regulatory Commission U-604127 Page 3 Attachments (hand delivered to NRC Region Ill Chief Examiner):
  • RO/SRO Composite Examination with references attached
  • Integrated Plant Operation Scenario Guides
  • Completed Checklists:

o Operating Test Quality Checklist (Form ES-301-3) o Simulator Scenario Quality Checklist (Form ES-301-4) o Transient and Event Checklist (Form ES-301-5) o Competencies Checklist (Form ES-301-6) o Written Exam Quality Checklist (Form 401-6)

  • Examination Security Agreement (Form ES-201-3)