MONTHYEARL-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000266/2024011 and 05000301/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency2024-09-0909 September 2024 Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency ML24207A0202024-08-28028 August 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Point Beach Nuclear Plant, Units 1 and 2 (Docket Numbers: 50-0266 and 50-0301) IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20240022024-08-13013 August 2024 Integrated Inspection Report 05000266/2024002 and 05000301/2024002 L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24214A3092024-08-0202 August 2024 Confirmation of Initial License Examination L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24194A1802024-07-24024 July 2024 – Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule IR 05000266/20244012024-07-23023 July 2024 Public - Point Beach Nuclear Plant Cyber Security Inspection Report 05000266/2024401 and 05000301/2024401 ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal IR 05000266/20240102024-07-10010 July 2024 Age-Related Degradation Inspection Report 05000266/2024010 and 05000301/2024010 L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision IR 05000266/20244202024-06-0505 June 2024 Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420 ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000266/2024301; 05000301/2024301 L-2024-067, Annual Monitoring Report2024-04-26026 April 2024 Annual Monitoring Report ML24116A0402024-04-23023 April 2024 Periodic Update of the Updated Final Safety Analysis Report ML24071A0912024-04-22022 April 2024 Issuance of Relief Request I6-RR-03 - Extension of the Unit 2 Steam Generator Primary Nozzle Dissimilar Metal Welds Sixth 10-Year Inservice Inspection Program Interval IR 05000266/20240012024-04-11011 April 2024 Integrated Inspection Report 05000266/2024001 and 05000301/2024001 L-2024-030, Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-03-27027 March 2024 Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-043, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-03-25025 March 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications IR 05000266/20230062024-02-28028 February 2024 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2023006 and 05000301/2023006) ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 L-2024-020, Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections2024-02-22022 February 2024 Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections ML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, 2024-09-09
[Table view] |
Text
January 31, 2014 NEXT era** POINT BEACH NRC 2014-0007 10 CFR 50.54(f)
BL 2012-01 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Docket 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 NextEra Energy Point Beach. LLC Response to Reguest for Additional Information Regarding NRC Bulletin 2012-01 Design Vulnerability in Electric Power System References
- (1) (2) (3) U.S. Nuclear Regulatory Commission
, "Design Vulnerability in Electric Power System," NRC Bulletin 2012-01, July 27, 2012 (ML 12074A115)
NextEra Energy Point Beach, LLC letter to NRC, NextEra Energy Point Beach, LLC Response to NRC Bulletin 2012-01 Design Vulnerability in Electric Power System, dated October 24, 2012 (ML 12298A515)
NRC letter to NextEra Energy Point Beach, LLC, Request for Additional Information Regarding Response to Bulletin 2012-01, "Design Vulnerability in Electric Power System,"
dated December 20, 2013 (ML 13351A314)
Via Reference (1 ), the Nuclear Regulatory Commission (NRC) issued Bulletin (BL) 2012-01, "Design Vulnerability in Electric Power System." The BL requested NextEra Energy Point Beach, LLC (NextEra) provide information regarding the Point Beach Nuclear Plant (PBNP) electric power system design, in response to the recent operating experience that involved the loss of one of the three phases of the offsite power circuit at Byron Station, Unit 2, to determine if future regulatory action is warranted.
NextEra responded to this bulletin in Reference (2). The NRC requested additional information regarding Bulletin 2012-01 via Reference (3). The enclosure to this letter contains NextEra's response to Reference (3) Regulatory Commitment:
NextEra will follow the generic schedule provided in the Nuclear Energy Institute letter to the NRC, Industry Initiative on Open Phase Condition, dated October 9, 2013. This letter contains no revisions to existing Regulatory Commitments.
NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 Document Control Desk Page 2 I declare under penalty of perjury that the foregoing is true and correct.
Executed on January 31, 2014. Very truly yours, NextEra Energy Point Beach, LLC
- Eric McCartney Site Vice President Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NEXTERA ENERGY POINT BEACH, LLC RESPONSE TO REQUEST FOR ADDITIONAL INFORMATIONREGARDING NRC BULLETIN 2012-01 DESIGN VULNERABILITY IN ELECTRIC POWER SYSTEM On July 27, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2012-01, "Design Vulnerability in Electric Power System" (Agencywide Documents Access and Management System Accession No. ML 12074A115),
to all holders of operating licenses and combined licenses for nuclear power reactors.
In addition, Watts Bar Nuclear Plant, Unit 2, is addressing the issues identified in the bulletin as part of the licensing process.Bulletin 2012-01 requested information about each facility's electric power system designs, in light of recent operating experience involving the loss of one of the three phases of the offsite power circuit (single-phase open circuit condition) at Byron Station, Unit 2. In order for the NRC staff to complete its review of responses to the bulletin, the following additional information is requested:
- 1. Provide a summary of all interim corrective actions that have been taken since the January 30, 2012, event at Byron Station, Unit 2, to ensure that plant operators can promptly diagnose and respond to open phase conditions on the offsite power circuits for Class-1 E vital buses until permanent corrective actions are completed
. NextEra Response Lessons learned from the events at Byron station were reviewed and various interim corrective actions evaluated for safety and efficiency at the NextEra Energy Point Beach, LLC (NextEra).
Based on the plant's offsite power configuration
, electrical design details, and lessons learned; the following actions were taken to ensure plant operators can promptly diagnose and respond to open phase conditions (OPC):
- Interim Corrective Actions o Switchyard rounds are performed twice per day and include general and detailed inspections of the transformers to ensure parameters are within expected limits. o Bi-annual infrared inspections of switchyard equipment are being completed as part of routine inspections.
o Operators have reviewed the Byron loss of phase event during re-qualification training.
Page 1 of 3
- 2. Provide a status and schedule for completion of plant design changes and modifications to resolve issues with an open phase of electric power. NextEra Response
- Status o Point Beach and Next Era's nuclear fleet, in cooperation with other holders of licenses for nuclear power reactors, are investigating options being researched by several vendors (PSC2000, EPRI, Schweitzer, etc.) to detect OPC faults. There is currently no generic, off-the-shelf technology that has been proven to detect all the required open phase fault conditions for all plant and transformer designs.
o Point Beach and Next Era's nuclear fleet are engaged in the development of the NEI OPC Guidance
- Document, as well as development of enhancements to software tools being used to analyze OPC faults. o With the goal of ensuring accurate detection without compromising nuclear safety or increasing plant risk, this new OPC technology is being thoroughly evaluated, will be tested, and will be fully analyzed before installation.
o Next Era has begun initial testing and development (T&D) by FPL Transmission of a potential hardware solution to determine viability for the open phase issue. o NextEra's response (reference
- 1) to Bulletin 2012-01 stated on page 6 of Enclosure 1: Consistent with the CLB, existing protective circuitry will separate the ESF buses from a connected failed offsite source due to a loss of voltage or a sustained, balanced degraded grid voltage concurrent with certain design basis accidents.
The relay systems were not specifically designed to detect an open single phase of a three phase system. Detection of a single-open phase condition is beyond the approved design and licensing basis of the plant. However, due to the transformer configurations at PBNP, it is expected that either adequately balanced three phase conditions will exist or actuation of the degraded voltage relays will occur because two of the three line-to-line voltages will be below the degraded voltage relays setpoint.
Therefore, if an open phase condition were to exist at PBNP, all ESF equipment would remain capable of performing its designated safety function by having adequate offsite power or be isolated from offsite power and loaded onto the EDGs However, NextEra is exploring design modifications in order to ensure an open phase condition would be promptly detected.
NextEra has initiated a project and is in the process of pursuing project and budget approval.
Page 2 of 3
- Schedule o NextEra has committed to the generic schedule provided in the Industry NEI OPC Initiative, dated October 9, 2013 (Reference 2). o It is our intention to meet the milestones of this schedule;
- however, deviations may be required to accommodate outage schedules, software and hardware availability, manufacturer's delivery capabilities, licensing delays, etc. o Any deviation from the Industry OPC Initiative schedule will be documented through the deviation/exemption process currently being developed by NEI. References
- 1. NextEra Energy Point Beach, LLC letter to NRC, NextEra Energy Point Beach, LLC Response to NRC Bulletin 2012-01 Design Vulnerability in Electric Power System, dated October 24, 2012 (ML 12298A515)
- 2. Nuclear Energy Institute letter to the NRC, Industry Initiative on Open Phase Condition, dated October 9, 2013 (ML 13333A 14 7) Page 3 of 3