Forwards Rept Re Licensing & Restart Schedules,Per EDO 870727 Memo.Info Will Be Provided WeeklyML20195G375 |
Person / Time |
---|
Site: |
Beaver Valley, Peach Bottom, Palo Verde, Sequoyah, Pilgrim, Braidwood, Seabrook, South Texas, Rancho Seco, 05000000, Shoreham |
---|
Issue date: |
08/21/1987 |
---|
From: |
Funches J Office of Nuclear Reactor Regulation |
---|
To: |
Hayes B NRC OFFICE OF INVESTIGATIONS (OI) |
---|
Shared Package |
---|
ML20151H158 |
List: |
---|
References |
---|
FOIA-88-198 NUDOCS 8708260307 |
Download: ML20195G375 (11) |
|
Similar Documents at Beaver Valley, Peach Bottom, Palo Verde, Sequoyah, Pilgrim, Braidwood, Seabrook, South Texas, Rancho Seco, 05000000, Shoreham |
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217N4611999-10-22022 October 1999 Forwards Revised Pages 11,14 & 71 of Rept & Order Dtd 990608.Revs Are Textual Changes to Clarify & Confirm Action Taken by Nuclear Decommissioning Financing Committee ML20217D7031999-10-0707 October 1999 Informs That USNRC Had Dicussions with Licensee on 990908 Application for License Amend to Relocate 18-month Standby Diesel Generator Insp Sr.Forwards Preliminary Info Submitted by Licensee Re Supplement to Application ML20217A8641999-10-0606 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903 ML20212K8811999-10-0404 October 1999 Notification of 991014 Meeting with Util in Rockville,Md to Discuss Improved Std TS Conversion Process for Plant,Units 1 & 2 ML20212L3481999-10-0101 October 1999 Forwards Document Re Replacement SG Water Level Trip Setpoint Differences to Be Placed in PDR ML20216F9021999-09-21021 September 1999 Notification of 991005-07 Meeting with STP Nuclear Operating Co in Bay City,Tx,To Review Plant Categorization & Feedback Process of Risk Ranking Components ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Director'S Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20211P4961999-09-0909 September 1999 Revised Notification of 990916 Meeting with Tva.Meeting Will Be Closed to Public Due to Proprietary Info Contained in Westinghouse TR WCAP-15128 to Be Discussed ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20211H7841999-08-31031 August 1999 Notification of 990916 Meeting with Util in Rockville,Md to Discuss TVA Intent to Aply for License Amend to Use Alternate Steam Generator Repair Criteria for Stress Corrosion Cracking Evaluated in W TR WCAP-15128 ML20211J2141999-08-27027 August 1999 Notification of 990831 Meeting with Util to Discuss Issues Associated with STPNOC Recent Request to Exclude safety- Related Low Risk Significant & non-risk Significant Components from Scope of Special Treatment Requirements ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211G2501999-08-25025 August 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990706-15 ML20211G7001999-08-25025 August 1999 Forwards Examination Rept with as Given Written Exam Administered on 990706-15 for Distribution Under Rids Code IE42 ML20211D1001999-08-20020 August 1999 Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20211F3801999-08-20020 August 1999 Notification of 990831 Meeting with Util in Rockville,Md to Discuss Issues Associated with STPNOC Recent Request to Exclude safety-related low-risk Significant & non-risk Significant Components, Designated Under Gqa Program ML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20210P9351999-08-0909 August 1999 Notification of 990923 Meeting with Util in Arlington,Tx to Introduce New Director,Safety Quality Concerns Program & Status of Activities to Support Confirmatory Order Modifying License ML20210M6841999-08-0505 August 1999 Notification of Licensee Meeting with Util on 990914 in Arlington,Tx to Discuss New Mgt Team Introduction & Site Status ML20210K4141999-08-0404 August 1999 Forwards Signed Originals of DD Issued Under 10CFR2.206. Without Encl ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20210G9951999-07-20020 July 1999 Discusses 990628 Meeting Re New NRC Reactor Insp & Oversight Process.List of Attendees & Matl Used in Presentation Enclosed ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20209H2231999-07-16016 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301(OL) & 50-457/99-301(OL) of Exam Administered During Wk of 990607 ML20210C7061999-07-16016 July 1999 Forwards Facility Submitted Outline & Initial Exam Submittal for Operator Licensing Exams Administered During Wk of 990607 ML20209G2611999-07-12012 July 1999 Forwards Draft Request for Addl Info Re GL 96-06 Response ML20209D5751999-07-0909 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Licensee Proposed SG Water Level Trip Setpoint TS & Setpoint Impact on Pressurizer Water Level TS Per 10CFR50.36 ML20196L1481999-07-0707 July 1999 Forwards Info Provided by Licensee to Facilitate Conference Calls Re Licensee Desire to Propose Emergency Technical Specification Changes on Fuel Handling Building Exhaust Air Sys ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20212J2641999-06-24024 June 1999 Forwards Addl Info from Licensee Re Clarification of Sentence in Util (on Page 4 of 7) Which States That, Isolation Valves in This Sys Designed to Be Operated remote-manually from Control Room ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20195J0441999-06-14014 June 1999 Refers to Discussions with Licensee on Future Suppl to Application on Replacement Steam Generator Reactor Coolant Flow Differences ML20195J0841999-06-14014 June 1999 Forwards Info Re Suppl to Application on TS 3.6.3,action B, to Clarify Use of Check Valve with Flow Through Valve Secured as Means to Isolate Affected Containment Penetration,To Be Placed in PDR ML20207E8961999-06-0303 June 1999 Discusses Which Submitted Relief Request RR-ENG-2-8 Which Requested Relief from ASME Code Based on Provisions of Code Case N-491-2.Requests That Encl Be Placed Into PDR ML20207D9911999-05-28028 May 1999 Informs That NRC Requested That Licensees Respond to Survey on Hydrogen Storage Facilities,To Support Preliminary Evaluation to Determine If Addl Study Warranted.South Texas Project Licensee Response Encl for Placement in PDR ML20207A6671999-05-20020 May 1999 Notification of 990602 & 03 Meeting with Util in South Texas Project Nuclear Support Ctr,Southwest of Bay City,Tx,In Order for Licensee to Present low-power Shutdown Risk Model ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20207A3381999-05-19019 May 1999 Informs of Discussions with Licensee on 980831 Application for License Amend to TS 3.4.9.3 to Reflect Revised Cold Overpressure Mitigation Curve Associated with Replacement Sgs.Request That Encl Documents Be Placed in PDR ML20206U9631999-05-18018 May 1999 Notification of Significant Licensee Meeting 99-27 with Util on 990602 to Discuss Predecisional Enforcement Conference - NRC Investigation ML20207A4771999-05-18018 May 1999 Notification of 990629 Meeting with Util in Rockville,Md to Discuss long-range Planning with Regard to Dry Storage of Sf at Sequoyah Site ML20206Q2751999-05-13013 May 1999 Forwards Official Case File for DPO-99-1,request of Review of Concerns Related to TS Setpoints & Allowable Value for Instrumentation Under Formal DPO Procedures,For Disposition in Accordance with Provisions of NRC MD 10.159 ML20206N6411999-05-13013 May 1999 Refers to Discussions with Licensee on Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20206M0061999-05-12012 May 1999 Notification of 990616 Meeting with TVA in Rockville,Md to Discuss long-range Planning with Regard to SG Replacement.Draft Agenda Encl ML20206R1691999-05-0707 May 1999 Rev 1 to Notification of 990602 Significant Licensee Meeting with Listed Attendees in King of Prussia,Pa Re Predecisional Enforcement Conference Concerning NRC Investigation.Rev Sighted Date Change ML20206H3921999-05-0606 May 1999 Notification of 990518 Meeting with Util in Rockville,Md to Discuss Util Presentation of Technical Evaluation Performed in Support of License Amend Request Which Would Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20206G2041999-05-0404 May 1999 Discusses 981201 Telcon Between NRC Staff & STP Re 10CFR50.59 Evaluation of MSLB Reanalysis & Effect on Isolation Valve Cubicle & Rcb.Requests That Encl Draft Info Be Placed in PDR ML20206G5041999-05-0404 May 1999 Requests That Enclosures 1 & 2 Re 990412 Conference Call, Discussing Preliminary Results of SG Insp,Be Placed in PDR 1999-09-09
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217N4611999-10-22022 October 1999 Forwards Revised Pages 11,14 & 71 of Rept & Order Dtd 990608.Revs Are Textual Changes to Clarify & Confirm Action Taken by Nuclear Decommissioning Financing Committee ML20217J8951999-10-21021 October 1999 Staff Requirements Memo Re Affirmation Session on 991021, Rockville,Md (Open to Public Attendance) ML20217D7031999-10-0707 October 1999 Informs That USNRC Had Dicussions with Licensee on 990908 Application for License Amend to Relocate 18-month Standby Diesel Generator Insp Sr.Forwards Preliminary Info Submitted by Licensee Re Supplement to Application ML20217A8641999-10-0606 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903 ML20212K8811999-10-0404 October 1999 Notification of 991014 Meeting with Util in Rockville,Md to Discuss Improved Std TS Conversion Process for Plant,Units 1 & 2 ML20212L3481999-10-0101 October 1999 Forwards Document Re Replacement SG Water Level Trip Setpoint Differences to Be Placed in PDR ML20212F5401999-09-24024 September 1999 Staff Requirements Memo Re 990924 Affirmation Session Concerning SECY-99-236, Firstenergy Nuclear Operating Co, Local 29 Petition to Waive Time Limits in 10CFR2.1305 & Suppl Comments ML20216F9021999-09-21021 September 1999 Notification of 991005-07 Meeting with STP Nuclear Operating Co in Bay City,Tx,To Review Plant Categorization & Feedback Process of Risk Ranking Components ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Director'S Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20211P4961999-09-0909 September 1999 Revised Notification of 990916 Meeting with Tva.Meeting Will Be Closed to Public Due to Proprietary Info Contained in Westinghouse TR WCAP-15128 to Be Discussed ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20211H7841999-08-31031 August 1999 Notification of 990916 Meeting with Util in Rockville,Md to Discuss TVA Intent to Aply for License Amend to Use Alternate Steam Generator Repair Criteria for Stress Corrosion Cracking Evaluated in W TR WCAP-15128 ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211J2141999-08-27027 August 1999 Notification of 990831 Meeting with Util to Discuss Issues Associated with STPNOC Recent Request to Exclude safety- Related Low Risk Significant & non-risk Significant Components from Scope of Special Treatment Requirements ML20211G7001999-08-25025 August 1999 Forwards Examination Rept with as Given Written Exam Administered on 990706-15 for Distribution Under Rids Code IE42 ML20211G2501999-08-25025 August 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990706-15 ML20211F3801999-08-20020 August 1999 Notification of 990831 Meeting with Util in Rockville,Md to Discuss Issues Associated with STPNOC Recent Request to Exclude safety-related low-risk Significant & non-risk Significant Components, Designated Under Gqa Program ML20211D1001999-08-20020 August 1999 Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20210P9351999-08-0909 August 1999 Notification of 990923 Meeting with Util in Arlington,Tx to Introduce New Director,Safety Quality Concerns Program & Status of Activities to Support Confirmatory Order Modifying License ML20210M6841999-08-0505 August 1999 Notification of Licensee Meeting with Util on 990914 in Arlington,Tx to Discuss New Mgt Team Introduction & Site Status ML20210K4141999-08-0404 August 1999 Forwards Signed Originals of DD Issued Under 10CFR2.206. Without Encl ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20210G9951999-07-20020 July 1999 Discusses 990628 Meeting Re New NRC Reactor Insp & Oversight Process.List of Attendees & Matl Used in Presentation Enclosed ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20209H2231999-07-16016 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301(OL) & 50-457/99-301(OL) of Exam Administered During Wk of 990607 ML20210C7061999-07-16016 July 1999 Forwards Facility Submitted Outline & Initial Exam Submittal for Operator Licensing Exams Administered During Wk of 990607 ML20209G2611999-07-12012 July 1999 Forwards Draft Request for Addl Info Re GL 96-06 Response ML20209D5751999-07-0909 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Licensee Proposed SG Water Level Trip Setpoint TS & Setpoint Impact on Pressurizer Water Level TS Per 10CFR50.36 ML20196L1481999-07-0707 July 1999 Forwards Info Provided by Licensee to Facilitate Conference Calls Re Licensee Desire to Propose Emergency Technical Specification Changes on Fuel Handling Building Exhaust Air Sys ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20212J2641999-06-24024 June 1999 Forwards Addl Info from Licensee Re Clarification of Sentence in Util (on Page 4 of 7) Which States That, Isolation Valves in This Sys Designed to Be Operated remote-manually from Control Room ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20195J0441999-06-14014 June 1999 Refers to Discussions with Licensee on Future Suppl to Application on Replacement Steam Generator Reactor Coolant Flow Differences ML20195J0841999-06-14014 June 1999 Forwards Info Re Suppl to Application on TS 3.6.3,action B, to Clarify Use of Check Valve with Flow Through Valve Secured as Means to Isolate Affected Containment Penetration,To Be Placed in PDR ML20207E8961999-06-0303 June 1999 Discusses Which Submitted Relief Request RR-ENG-2-8 Which Requested Relief from ASME Code Based on Provisions of Code Case N-491-2.Requests That Encl Be Placed Into PDR ML20207D9911999-05-28028 May 1999 Informs That NRC Requested That Licensees Respond to Survey on Hydrogen Storage Facilities,To Support Preliminary Evaluation to Determine If Addl Study Warranted.South Texas Project Licensee Response Encl for Placement in PDR ML20207A6671999-05-20020 May 1999 Notification of 990602 & 03 Meeting with Util in South Texas Project Nuclear Support Ctr,Southwest of Bay City,Tx,In Order for Licensee to Present low-power Shutdown Risk Model ML20207A3381999-05-19019 May 1999 Informs of Discussions with Licensee on 980831 Application for License Amend to TS 3.4.9.3 to Reflect Revised Cold Overpressure Mitigation Curve Associated with Replacement Sgs.Request That Encl Documents Be Placed in PDR ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20206U9631999-05-18018 May 1999 Notification of Significant Licensee Meeting 99-27 with Util on 990602 to Discuss Predecisional Enforcement Conference - NRC Investigation ML20207A4771999-05-18018 May 1999 Notification of 990629 Meeting with Util in Rockville,Md to Discuss long-range Planning with Regard to Dry Storage of Sf at Sequoyah Site ML20206Q2751999-05-13013 May 1999 Forwards Official Case File for DPO-99-1,request of Review of Concerns Related to TS Setpoints & Allowable Value for Instrumentation Under Formal DPO Procedures,For Disposition in Accordance with Provisions of NRC MD 10.159 ML20206N6411999-05-13013 May 1999 Refers to Discussions with Licensee on Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20206M0061999-05-12012 May 1999 Notification of 990616 Meeting with TVA in Rockville,Md to Discuss long-range Planning with Regard to SG Replacement.Draft Agenda Encl ML20206R1691999-05-0707 May 1999 Rev 1 to Notification of 990602 Significant Licensee Meeting with Listed Attendees in King of Prussia,Pa Re Predecisional Enforcement Conference Concerning NRC Investigation.Rev Sighted Date Change ML20206H3921999-05-0606 May 1999 Notification of 990518 Meeting with Util in Rockville,Md to Discuss Util Presentation of Technical Evaluation Performed in Support of License Amend Request Which Would Revise TS Limiting Safety Sys Setpoints to Be More Conservative 1999-09-09
[Table view] |
Text
. _. _ ___ _ _ _ .. . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _
, % ..9 N 0
/
AUG 21 1987 ^ /
4 MEMORANCUM FOR: Ben B. Hayes, Director Of fice of Investigations .'
Ih \
Sharon R. Connelly, Director Of fice of Inspector and Auditor FROM Jesse L. Funches, Chief Policy Development and Technical Support Branch Procram Management, Policy Ocvelopment, and Analysis Staff Office of Nuclear Reactor Regulation
SUBJECT:
LICENSING m'io AEST/,RT SCHEDULE 1
By rer.orandum dated July 27, 1967, of licensing F d restart schedules. the EDO directed NP.I, to keep you infortne d inf ormation cr.d will be provided weekly.The attached report contains this A
stfons regarding this infortnation should be directed to Beth Doolit 1
Jesse L. Funches, Chief Pelicy Development and Technica'. sport Branch Program Analysis hanagea Staff nt, Policy Development, and Of fice' 0f Nuclear Reactor Regulation B. Doolittle, PFAS 49-24735 DI ST'4180T10N
- Central FHe TPSS File SBlack JFunches
[j (LRS)I[
(, t/ -
TPSS:PTJS SBlack P TPS$:k '9150 '
JFunch'es ,
',5 /,-[/0T' {g/87 '.
- l mM Q c.c MM#
r f ^
}
NTOL STATUS 08/17/87 IMMED IN!TIAL COM. MISSION FULL ASLB EFCTV LOW POVER CRITI-PLANT DECISION BRIEF- POWEQ DECSN AUTHORZTN CALITY ING AUTHC3ZTN PALO VERDE 3 12/82C 4/83C 3/25/87C 10/02/87E' 10/06/87E 10/10/87E*
COP.MENTS : LOW POWER LICENSE ISSUED 3/25/87. FUEL LOADING BEGAN ON MARCH 28, 1987 AND WAS COMPLETED ON APRll 2.1987. AN EXEMPTION TO LOAD F WITH ONE DIESEL OPERABLE WAS GRActTED WITH THE LICENSE. S TO BE OPERABLE PRIOR TO MODE 4. THE 3B DIESEL GENERATOR COMPLETED THE INITIAL PHASE OF TESTING FOLLOW! fig REBUIL0lHG ON JULY 10. DURING DIESEL INSPECTION A PROBLEM WAS FOUND ON THE GENERATOR END POLE ROTOR WINDING WAS COMING LOOSE. ROTOR WAS TESTED OFFSI BEING REINSTALLEO IN PREPARATION FOR INTEGRATED SAFEGUARD h0iES:
1)
- INDICATES CHANGE FROM FREVIOUS REPORT
- 2) LOW POWER AUTHORZTN:
DATE PLANT IS EXPECTED TO BE COMPLETED 3)
INITIAL CRITICALITY: APPLICANT'S CURRENT BEST ESTIMATE OR MOST "CRE01BLE" DATE
~
- 4) COP. MISSION BR'.EFING:
ESTIMATED APPROXIMATELY ONE WEEK BEFORE FULL PO DECIS10N DATE S)
FULL POWER AUTHORZTN: CURRENT BEST EST! MATE DATE
NTOL STATUS 08/17/87 I Py.ED INITIAL COMMISSION FULL ASLB EFCTV LOW POWER PLANT CRIT 1- BRIEF- POWER DECISION DECSN AUTHORZTN C Al. l T Y ING AUTHORZTN BEAVER N/A N/A 5/28/87C VALLEY 2 08/04/87C 07/08/87C 08/14/87C*
CCMMENTS; THE LOW-POWER LICENSE WN ISSUE 0 ON S/28/87 INITIAL CRITICAllTY WAS REACHED ON AUGUST 4 AT 0625 HOURS. LICENSEE EXPECTS TO G0 BEYOND St POWER IN MID AUGUST.
A COMMISSION BRIEFIV UN THE FULL-POWER LICENSE WAS HELD ON JULY 8.
THE COMISSION APPHOVED ISSUAhCE OF THE FULL POWE SUPPLEMENT NO 6 WAS ISSUED WITH THE FULL POWER LICENSE
________.-.-- - --- ------ ----~~~-~~~~-~~ ~ ~ ~
Gh'_ETMdOE f
NTOL STATUS 08/17/87 I P.ME D INiilAL COMMIS$10N Fl".L ASLB EFCTV LOW POWER CRITI- BRIEF- POWER PLANT DECISION DECSN AUT.40RZTN CALITY ING AUTHORZTN SOUTH TEXA5 8/86C 8/87E 8/24/67t* 10/19/87E 11/02/87E 11/09/87E COMMENTS:
THE STAFF CONDUCTED AN OPERATIONAL READINE55 REVIEW INS THE WEEX OF JUNE 29, 1987 WITH PARTICIPATION BY NRR. AE00, REGION IV >
AND OTHER REGIONAL PERSONNEL. AS A RESLLT OF THE REVIEW, THE STAFF '
CONCLUDED THAT THE SOUTH TEXAS PROJECT HAD ACHIEVED THE READINESS FOR OPERATION WITH THE EXCEPTION OF TWO ISSUE SECURITY AND EQUIPMENT QUALIFICATION. AT THIS POINT, REGION IV HAS NDT YET FOUND THE SECURITY ISSUE TO BE RESOLVED. TECHNI OF ALL FSAR RELATED ITEMS HAS BEEN ACHIEVED. THE SER TO S LOW POWER LICENSE IS READY FOR ISSUANCE. TECHNICAL REVIEW OF THE EXEMPTION HAVE REQUESTS BEEN PUBLISHED. HAS BEEN COMPLETED AND THE ENVIR0 THE LICENSE IS EXPECTED TO BE ISSUED SHORTLY AFTER THE SECURITY ISSUES ARE RESOLVED.
l l
l i
mensgMEILGMjfEiEMd 3
l
}
hTOL STATUS 08/17/87 IMMED ASLB INITIAL COMMISSION FULL EFCTV PLANT DECISION LOW POWER CRITI- BRIEF- POWER i DECSN AUTHORZTN CALITY ING AUTHORZTN !
SEABROOK 03/87C N/S N/S N/S N/S N/S COMMENTS:
SSER 6 RESDLVES ALL OF THE SER OUTSTANDING ISSUES A CONFIRPATORY ISSUES WHICH DID NOT RE0VIRE RESOLU LOAD.
SSER 7 IS PRESENTLY BEING PREPARED AND IT IS EXPE TWO CONFIRPATORY ISSUES WILL BE RESOLVED. !
A FUEL LOAD AND PRECRITICAL '
TEST LICENSE WAS ISSUED ON OCTOBER 17, 1986. FUEL LOADING BEG OCTOBER 22 AND WAS COMPLETED ON OCTOBER 29, 1986.
ON MARCH 25, 1987 THE LICENSING BOARD RENDERED A PARTIAL INITI DECISION AUTHORIZING THE DIRECTOR OF NRR TO ISS ING LOW POWER INTERVENORS APPEALEDTESTING AND OPERATION LlHITED TO THIS DECISION. ,
1HE JhiiRVENORS HAVE APPEALED IT CONSIDER-IN ITS TO THE COM i ATION OF ALAB-853 THE COMMISSION STAYED THE LI COMPLETION OF COMMIS$10N REVIEW OF THE THEAPPEAL B ABSENT ANY EMERGENCY PLAN PLAN 7.0SE THAT LIES IN PASSACHUSETTS (MASSACHU ON APRll 9, FOR ;
APPLICANT EVEN A LOW POWER LICENSE LEFT IN PLACE.
MUST CAN BE FILE ISSUED. AN EMERGE ACCORDINGLY, THE STAY WAS 1
ON THE EVE OF ITS APRIL 9 DECISION, THE C0K*ISSION RECEIV l SEABR00X PLAN FOR THEAPPLICANT PASSACHUSETTS (1) EPZ, A NOTIFICATION (2) A SUGGESTION THAT OF MOO IT RESULT OF THE FILING, AND (3) A REQUEST TO UFT THE STAY.
THE COMMISSION PROCEEDED WITH ITS DECISION, BUT SAID I SUBSEQUENTLY
RESPONSE
JUNE 11, 1987 T9 THE SEABROOK APPLICANT AFT BY PARTICIPANTS IN THE SEABROOK PROCEEDING ,
THE COMMISSION VOTED AGAINST AUTHORIZIN LOW POWER LICENSE.
1 ON DECEM3ER 18, 1986, THE APPLICANT FILED A PETITION PURSUANT !T PLANNING ON APRIL 22, 1987 ZONE (EPZ) FOR THE SE THE BOARD DETERMINED THE APPLICANT HAD N CAM FOR REDUCING THE 10 MILE EPZ TO ONE MILE; THEREFC .E IT THE PETITION.
ON JULY 24, 1987 APPEALS FROM THE SEABROOK LICENSING 25, 1987 PARTIAL PHASE OF THIS OPERATING LICENSE PROCEEDif , INI SHOULO THE APPEAL BOAR 0 DECIDE IN FAYOR OF THE INTERVENORS, HEARJGS COULD R THAT WERE NOT ADMITTED BY THE LICENSING BOARD.
_.p '3..-u miWemmthGd8?LEPM&Sil W
. '2 l A MEETING TO DISCUSS COMPENSATORY PLANS AND PRO PLANN1hG WlTHIN THE MASSACHUSETTS EPZPShH WAS HELO ON EXPECTS TO SUBMIT ITS PLAN FOR MASSACHUSSETS psf;H IN M WILL THEN REQUEST THE COMMISSION TO LIFT THE S!
1 l
l l
l l
l
' ~ -- - - - - -
1 M
NTOL STATUS 08/17/87 !
IMMED INITIAL ASLB EFCTV COMMISSION FULL LOW P0hER CRIT 1- BRIEF-PLANT DECISION DECSN POWER AUTHORZTN CALITY _
I N G_ _ AUTHDR2TN SHOREHAM 9/21/83C 12/84C 07/03/85C 02/15/85C N/S N/S COPEENTS:
ON JUNE 8,1987, THE REACTOR WAS SHUTDOWN AFTER Cf?.PLET10N OF THE THIRD ROUND OF LOW. POWER TESTING AT LESS THE THAN 5". O t.lCENSEE HAD COMPLETED ALL THE REQUIRED LOW-POW NRR HAS CLOSED ITEMS RELATED TO FIRE PROTECTION PROGRAM, REM NON-EP RELATED LICENSE CONDITIONS THAT REQUIRE REl AUTHORIZING OPERATIONS ABOVE 5% POWER.
ON FEBRUARY 13, 1986, FEPA CONDUCTED AN EMERGENCY DRILL AT THE SHOREHAM 511E AND ISSUED ITS REPORT ON APRIL 18, 1986.
FEPA DID NOT PAXE A FINDING OF "REASONABLE ASSURANCE" REGARDING THE DEFERRING THAT DECISION TO THE NRC. {
EXERCISE WERE SUBMITTE0 ON AUGUST 1,1986. CONTENTIONS RELATE '
CONTENTIONS WITH PANY SUBPARTS PARCH 10, 1987, AND ENDED IN JUNE,1987. HEARINGS FOR LliiGATION.THE BEGAN ON ON JULY 24, 1986, THE COMMISSION REVIEWE0 THE OCTOBER 18, 1 APPEAL BOARD DECISION HOLDING INADEQUATE AS A P EMERGENCY PLAN FOR SHOREHAM. THE COPHISSION VOT REPAAD FOR FURTHER EVIDENTIARY HEARINGS ON LIL THE LOCAL AUTHORITIES IN FACT COOPERATE DURING AN ACTU AND EXERCISE ISSUES ARE PENDING BEFOR ON JUNE 11, 1987, THE COMMISSION ACCEPTED THE INTERVENORS .
OF WALK RADIO STATION, AS A NEW ISSUE.TO REOPEN ON DECEMBER 11, 1986, THE LICENSING BOARD RULED TO REOPEN THE RECORD T EP CONTAlh5 ADEQUATE PROVISION FOR RECEPTION CE EVACUEES IN THE EVENT OF A RADIOLOGIC SCHEDULE FOR THE REPANDED RECEPTIONHEARING WAS COMPLETED ON JULY 31, 1987 CENTER ISSU ON APRIL 14, 1967 LILCO FILED A MOTION BEFORE THE COMMISSION F EXPEDITED 10 INCREASE POWER COMMISSION TO 25%. ON JUNECONSIDERATION 11, 1987, OF A REQUEST DENY CONSIDERATION OF THE REQUEST DUE TO PROPOSED SCHEDULE.
l REFILE ITS MOTION WITH THE LICENSING THE MERITS OF THE MOTION.
BOARD ITS REQUEST TO OPERATE SHOREH SIMULTANE005tY, LILCO NOT10NEO THE COMMISSION TO FOP.M A N i
TO CONSIDER 115 REQUEST.
\
l I
l I
_,- ,rnam w vssatwAbbM3L4iLKMM'?
NTOL STATUS 08/17/87 COMPLET10tl SCHEDULE FOR PLANTS WITHIN THE NEXT 6 MONTilS THE FOLLOWING APPLICANTS HAVE SCHEDULED CONSTRUCTION C WITHIN THE NEXT 6 MONTHS.
A DETAILED WRITEUP WILL BE INCORPORATED INTO THis REPORT.WIT PLANT APrtlCANT CONSTRUCT 10ti NRC STAFF ESTIMATED COMPLETION DATE CONSTRUCTION COMPLE-T!ON DATE BRAIDWOOD 2 1/88 1/88 1
1 l
i
, l
- l l
l b
M RESTART STATUS 08/17/B7 LICENSEE C0KMISS10N ACTION BRIEF-PLANT SHUIDOWN RESTART PLAN NRR SER ING DECISION PEACH 03/31/87 08/07/87C 9/28/87E BOTTOM 10/26/87E l
COMMENTS: Oh KARCh 31, 1987, THE PEACH BOTTOM ATOMIC POWER STATIO 2 AND 3 WERE ORDERED TO BE SHUT 00WN BECAUSE OF T OPERATORS, AND BECAUSE OF A HISTORY OF OTHER OCCURRENCES WHICH L THE NRC TO QUESTION THE MANAGEMENT OF THE FACILITY.
THE LICENSEE AUGUST 7, 1987. SUEMITTED ITS COMMITMENT TO EXCELLENCE THE STAFF'S RESTART ASSESSMENT PANEL FOR PEACH BOTTOM HELO ITS FIRST MEETING IN REGION I ON AUGUST 1 THE NRR AND REGION I REVIEW OF THE CTE PLAN.
UNIT AND 2 3WAS UNIT IN A REFUELING WAS OPERATING. OUTAGE AT THE TIME OF THE SH
- COOLANT SYSTEM HAS BEEN REASSEMBLED. UNIT 2 HAS FURTHER STARTUP ACTIVITES ARE ON HOLD STARTUP AUTHORIZES UNTIL THE LICENSEE IS PREPARED TO CONTIhUE ACTIVITIES.
THE LICENSEE ANTICIPATES BEING READY TO RESTART BY LATE OCTOBER; HOWEVER, THE STAFF FEELS THAT TH BE OPT! HISTIC TO SOME DEGREE.
UNIT 3 WILL GO DIRECTLY INTO A OF THE RECIRCULATION PIPING AND REFUE
' - - ~ ,
' ~ - --, -- -- - ,- ,, ,
.. _ __. _ . 2 m,
h i i
RESTART STATUS 08/17/87
LICENSEE l ACTION PLANT SHUT 00WN COMMISSION RESTART PLAN NRR SER ;
_ BRIEFING DECISION RANCHO SECO 12/26/65 07/03/86C 8/87E 10/87E 12/87E COMMENTS: ON JUNE 18, 1987, G. CARL ANDOGNINI, CHIEF EXECUTIVE O RANCHO SEC0, INFORMED THE BOARD OF DIRECTORS FOR THE SA CIPAL UTILITY DISTRICT (SMUD), THAT JANUARY 1988 IS A REAllS!
OATE.
ADDITIONALLY, MR. AND0GNINI INDICATED THAT THE POSTSTAR ASCENSION PROGRAM WILL REQUIRE APPROXIMATEL AT RANCHO SECO, THE PLANT STAFF 15 STRIVING TO COMPLETE PREREQUISITES BY NOVEMBER 1987 l PLANT 1987 COMPLETION TESTING DATE. IS CURRENTLY PROCEEDIN !
NRR RESTART NOVEMBER 1987. THESEPREREQUISITE INCLUDE: ACTIONS ARE (1) THE RESTART SER, SCHEDULED FOR TARGE DISTRIBUTION IN AUGUST 1987, WITH SUPPLEMENTS TO FOLLOW l SEVERAL ITEMS STit.L NOT FINALIZED BY SMUD/NRR REVIEW!
OF 12 RESTART PREREQUISITE TECHNICAL SPECIFICATION Al (3) RESPONSE TO APPROXIMATELY 6 TECHNICAl REGION Y WHICH NEED TO BE RESOLVED A LIST PRIOR OF SPE- TO RES 1
HAS BEEN COMPILED BY NRR ON A C AN TIVELY INTERIM SCHEDULED RESTART FOR EARLY STATUS OCTOBER BRIEFING 1987. - FOR TH ON JULY 2,1987 A PUBLIC MEETING WAS HELD BY THE SMUD BO DIRECTORS.
THAT THE THE DISCUSSION PROJECTED RESTART TOPICS WOULD FOCUSED NOT OCCUR ON AVAILA UNTIL J THE RESTART PRO 9AM.THAT AN ADDITION /L 31 RELATED EXPENDITURES THROUGH SECO.HOWEVER, BEGAN ACT!YELY TO SOLICIT BUVERS FOR RAhCHO JANUARY 19T lH RESPONSE, SEVERAL SEVERAL WEEKS. POTENTIAL BUYERS HAVE VISITED RANC OPTIONS WITH SMUD. DUKE POWER AND PG&E APPEAR CIAL CONSEQUENCES COURT IN WASHINGTON ON AUGUST 25, 1987 FOR RANCHO S AND BETWEEN PGEE THE TWO AND INVOLVES A PRE-SHUTDOWN CO UTILITIES.
(FERC) 15 GATHERING INFORMATION FOR MEETING WITH THE NRC STAFF ON 19,AUGUST 1987.
THE SUPERIOR COURT IN SACRAM BE PLACED ON THE BALLOT CURING CALIFORNIA .
ESfibibgiJ!
y2Emni -
. 08/17/87 COMMISSION STATUS NRC PLANT SHUT 00WN BRIEFING RESTART-DECISION 1/ PLANT RESTAR SEQUOYAH 1 8/21/85 7/23/87C 3/ 02/88 SEQUOYAH 2 8/22/85 03/88 7/23/87C 7/ ~ 10/87 11/87 RANCHO SECO 12/26/85 10/87 5/ 12/87 PILGklM 4/12/86 1/88 9/87 5/ 9/87 9/87 4/
PEACH BOTTOM 3/31/87 9/14/E7 N/S N/S -
1/ COMMISSION MEETING DATE, IF REQUIRED. l 2/ LICENSEE'S PROPOSED DATE FOR PLANT RESTART.
3
~/ ADDITIONAL RESTART. COMMISSION BRIEFlhG REQVIRED THIRTY DAYS PRIOR 4/ THE STAFF BEllEVES TH]S SCHEDULE IS OPTIMISTIC.
5/ TENTATIVE SCHEDULE l
l l
__ ,__,_,___.,,,--m - - - - - - ~ ' " ' " ' ~ ' ~ "