 Issue dateTitleTopic
ML20217N46122 October 1999Forwards Revised Pages 11,14 & 71 of Rept & Order Dtd 990608.Revs Are Textual Changes to Clarify & Confirm Action Taken by Nuclear Decommissioning Financing Committee
ML20217D7037 October 1999Informs That USNRC Had Dicussions with Licensee on 990908 Application for License Amend to Relocate 18-month Standby Diesel Generator Insp Sr.Forwards Preliminary Info Submitted by Licensee Re Supplement to Application
ML20217A8646 October 1999Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903Unanalyzed Condition
Boric Acid
Shutdown Margin
ML20212K8814 October 1999Notification of 991014 Meeting with Util in Rockville,Md to Discuss Improved Std TS Conversion Process for Plant,Units 1 & 2
ML20212L3481 October 1999Forwards Document Re Replacement SG Water Level Trip Setpoint Differences to Be Placed in PDR
ML20216F90221 September 1999Notification of 991005-07 Meeting with STP Nuclear Operating Co in Bay City,Tx,To Review Plant Categorization & Feedback Process of Risk Ranking Components
ML20216F50616 September 1999Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Director'S Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld
ML20211P4969 September 1999Revised Notification of 990916 Meeting with Tva.Meeting Will Be Closed to Public Due to Proprietary Info Contained in Westinghouse TR WCAP-15128 to Be Discussed
ML20211K8611 September 1999Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed
ML20211H78431 August 1999Notification of 990916 Meeting with Util in Rockville,Md to Discuss TVA Intent to Aply for License Amend to Use Alternate Steam Generator Repair Criteria for Stress Corrosion Cracking Evaluated in W TR WCAP-15128
ML20211H44427 August 1999Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues
ML20211J21427 August 1999Notification of 990831 Meeting with Util to Discuss Issues Associated with STPNOC Recent Request to Exclude safety- Related Low Risk Significant & non-risk Significant Components from Scope of Special Treatment RequirementsProbabilistic Risk Assessment
Significance Determination Process
Exemption Request
ML20211G70025 August 1999Forwards Examination Rept with as Given Written Exam Administered on 990706-15 for Distribution Under Rids Code IE42Boric Acid
Shutdown Margin
Probabilistic Risk Assessment
Temporary Modification
Job Performance Measure
Unidentified leakage
ML20211G25025 August 1999Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990706-15
ML20211D10020 August 1999Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md
ML20211F38020 August 1999Notification of 990831 Meeting with Util in Rockville,Md to Discuss Issues Associated with STPNOC Recent Request to Exclude safety-related low-risk Significant & non-risk Significant Components, Designated Under Gqa ProgramProbabilistic Risk Assessment
Exemption Request
ML20211A43618 August 1999Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409
ML20210P9359 August 1999Notification of 990923 Meeting with Util in Arlington,Tx to Introduce New Director,Safety Quality Concerns Program & Status of Activities to Support Confirmatory Order Modifying License
ML20210M6845 August 1999Notification of Licensee Meeting with Util on 990914 in Arlington,Tx to Discuss New Mgt Team Introduction & Site Status
ML20210K4144 August 1999Forwards Signed Originals of DD Issued Under 10CFR2.206. Without Encl
ML20210P1364 August 1999Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop
ML20210G61628 July 1999Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409
ML20210F69827 July 1999Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts
ML20210G99520 July 1999Discusses 990628 Meeting Re New NRC Reactor Insp & Oversight Process.List of Attendees & Matl Used in Presentation Enclosed
ML20210C16319 July 1999Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld
ML20209H22316 July 1999Forwards Operator Licensing Exam Repts 50-456/99-301(OL) & 50-457/99-301(OL) of Exam Administered During Wk of 990607
ML20210C70616 July 1999Forwards Facility Submitted Outline & Initial Exam Submittal for Operator Licensing Exams Administered During Wk of 990607Temporary Modification
Job Performance Measure
Power change
ML20209G26112 July 1999Forwards Draft Request for Addl Info Re GL 96-06 Response
ML20209D5759 July 1999Notification of 990722 Meeting with Util in Rockville,Md to Discuss Licensee Proposed SG Water Level Trip Setpoint TS & Setpoint Impact on Pressurizer Water Level TS Per 10CFR50.36
ML20196L1487 July 1999Forwards Info Provided by Licensee to Facilitate Conference Calls Re Licensee Desire to Propose Emergency Technical Specification Changes on Fuel Handling Building Exhaust Air SysSafe Shutdown
Ultimate heat sink
Enforcement Discretion
Temporary Modification
ML20196H84928 June 1999Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999
ML20212J26424 June 1999Forwards Addl Info from Licensee Re Clarification of Sentence in Util (on Page 4 of 7) Which States That, Isolation Valves in This Sys Designed to Be Operated remote-manually from Control Room
ML20212H94923 June 1999Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon
ML20212H76222 June 1999Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy
ML20195J08414 June 1999Forwards Info Re Suppl to Application on TS 3.6.3,action B, to Clarify Use of Check Valve with Flow Through Valve Secured as Means to Isolate Affected Containment Penetration,To Be Placed in PDR
ML20195J04414 June 1999Refers to Discussions with Licensee on Future Suppl to Application on Replacement Steam Generator Reactor Coolant Flow Differences
ML20207E8963 June 1999Discusses Which Submitted Relief Request RR-ENG-2-8 Which Requested Relief from ASME Code Based on Provisions of Code Case N-491-2.Requests That Encl Be Placed Into PDR
ML20207D99128 May 1999Informs That NRC Requested That Licensees Respond to Survey on Hydrogen Storage Facilities,To Support Preliminary Evaluation to Determine If Addl Study Warranted.South Texas Project Licensee Response Encl for Placement in PDR
ML20207A66720 May 1999Notification of 990602 & 03 Meeting with Util in South Texas Project Nuclear Support Ctr,Southwest of Bay City,Tx,In Order for Licensee to Present low-power Shutdown Risk Model
ML20207A33819 May 1999Informs of Discussions with Licensee on 980831 Application for License Amend to TS 3.4.9.3 to Reflect Revised Cold Overpressure Mitigation Curve Associated with Replacement Sgs.Request That Encl Documents Be Placed in PDR
ML20206U20419 May 1999Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI
ML20207A47718 May 1999Notification of 990629 Meeting with Util in Rockville,Md to Discuss long-range Planning with Regard to Dry Storage of Sf at Sequoyah Site
ML20206U96318 May 1999Notification of Significant Licensee Meeting 99-27 with Util on 990602 to Discuss Predecisional Enforcement Conference - NRC Investigation
ML20206N64113 May 1999Refers to Discussions with Licensee on Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions
ML20206Q27513 May 1999Forwards Official Case File for DPO-99-1,request of Review of Concerns Related to TS Setpoints & Allowable Value for Instrumentation Under Formal DPO Procedures,For Disposition in Accordance with Provisions of NRC MD 10.159
ML20206M00612 May 1999Notification of 990616 Meeting with TVA in Rockville,Md to Discuss long-range Planning with Regard to SG Replacement.Draft Agenda Encl
ML20206R1697 May 1999Rev 1 to Notification of 990602 Significant Licensee Meeting with Listed Attendees in King of Prussia,Pa Re Predecisional Enforcement Conference Concerning NRC Investigation.Rev Sighted Date Change
ML20206H3926 May 1999Notification of 990518 Meeting with Util in Rockville,Md to Discuss Util Presentation of Technical Evaluation Performed in Support of License Amend Request Which Would Revise TS Limiting Safety Sys Setpoints to Be More Conservative
ML20206G5044 May 1999Requests That Enclosures 1 & 2 Re 990412 Conference Call, Discussing Preliminary Results of SG Insp,Be Placed in PDR
ML20206G2044 May 1999Discusses 981201 Telcon Between NRC Staff & STP Re 10CFR50.59 Evaluation of MSLB Reanalysis & Effect on Isolation Valve Cubicle & Rcb.Requests That Encl Draft Info Be Placed in PDRSafe Shutdown Earthquake
Operating Basis Earthquake