Monthly Operating Rept for Aug 1991 for Fort St Vrain Unit 1
ML20082U615
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/31/1991
From: Block M, Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
P-91284, NUDOCS 9109200265
Download: ML20082U615 (9)


Text

- - - . - . . . . _

s' 4

. - Putec Service c- ~~-

$Public Service

  • 16805 WCR 19 1/2, Platteville, Colorado 80651 September 13, 1991 Fort St, Vrain Unit No. 1 P-91284 1

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Docket No. 50-267

SUBJECT:

AUGUST, 1991, MONTHLY DEFUELING-OPERATIONS REPORT

REFERENCE:

Facility Operating-License Number DPR-34

Dear Sirs:

Enclosed, please find the Monthly Defueling Operations report for the month of August, 1991, submitted per the requirements of Fort St.

Vrain Technical-Specification AC 7.5.1.

If you have any questions, please contact Mr. M. H. Holmes at (303)-480-6960.

Sincerely.

kW}Yw d, D. W. Warembourg Manager, Nuclear Produ tion Fort St. Vrair, Nuclear Generating Station L DWW:': '/as Enclosure cc: Regional Administrator, Region IV Mr. - J. B. Bai rd -

Senior Resident Inspector Fort St. Vrain

[

g,2ggilfang<g R

p (p

^

4

+ .

Puuk Swvko Publ c Service' c- c--

i805 WCR 19 1/2, Platteville, Colorado 80651 i

September 13, 1991 Fort St. Vrain Unit No. 1 P-91284 U. S. Nuclear Regulatory Commission '

ATTN: Document Control Desk Washington, D.C. 20555 Occket No. 50-267 SJBJECT: AUGUST, 1991, MONTHLY DEFUELING OPERATIONS REPORT

REFERENCE:

Facility Operating License Number DPR-34

Dear Sirs:

Enclosed, please find the Monthly Defueling Operations report for the month of August, 1991, submitted per the requirements of Fort St.

Vrain Technical Specification AC 7.5.1.

If you have any questions, please contact Mr. M. H. Holmes at (303) 480-6960.

Sincerely, k A' JY.vt tw/,

D. W. Warembourg Manager, Nuclear Produ tion Fort St. Vrain Nuclear Generating Station DWV:MLB/as Enclosure cc: Regional Administrator, Region IV Mr. J. B. Baird Senior Resident Inspector Fort St. Vrain

. . ~ - . . . . . . ..- . . .~

. . - . _ . --.. - - . . - -.- - . - .~.~...-. -.. .-. --. ...-.

's!

l 1

-1 i

l PUBLIC SERVICE COMPANY OF COLORADO -

FORT ST. VRAIN NUCLEAR GENERATING STATION 9

MONTHLY DEFUELING OPERATIONS REPORT NO, 211 August, 1991

'b

-1 (-.--4 = wa w- a ~ r *=v m em 'w J- -n w w e. e se -' uP pe n'.r--v-.---e+m.T W-m--

s 4 -

This report contains the highlights of the Fort St. Vrain, Unit '

No, I, activities operated under the provisions of the Nuclear

- Regulatory. Commission Operating License No. DPR-34. This report is for the month of August, 1991.

1.0 NARRATIVE

SUMMARY

'0F OPERATING EXPERIENCE AND MAJOR SAFETY +

-RELATED MAINTENANCE The reactor remained shutdown the entire month of July,1991,

=following Public Service Company of Colorado's. decision to end nuclear operation at Fort St. Vrain.

Preparations for shipping spent fuel are proceeding.

Construction of the Independent Spent Fuel Storage Installation (ISFSI).is proceeding.

On Augusti15, 1991, Region'IV of the Nuclear Regulatory Commission issued a Level III Notice of Violation and Proposed Civil. Penalty to Public Service Company of Colorado as a result of an unplanned radiation exposure event that occurred on June:11,'1991.

2.0' SINGLE _ RELEASES OF RADI0 ACTIVITY OR-RADIATION EXPOSURE IN EXCESS OF 10% OF THE ALLOWABLE ANNUAL-VALUE None 3.0, INDICATION OF' FAILED FUEL RESULTING FROM IRRADIATED FUEL EXAMINATIONS-None 4.0 MONTHLY OPERATING DATA REPORT

. Attached i

.P a

CPFRATING DATA REPORT DOCKET NO. 50-267 DATE sontomhnr 11- 1001 COMPLETED BY M . I. , Block TELEPHONE (303) 620-1313

. OPERAT:'d STATUS NOTES l

1. Unit Name: Fort St. Vrain. L'n it No. 1  !
2. Feporting Period: Q10Rn1 thrnunh 910A31
3. - Licensea thermal Power (MWt): 842 4 hameplate Rating (Gross MWe): 342
5. Cesign Electrical Rat 1ng (Net MWe): 330
6. T mum Decencable Capacity (Gross MWe): 342
7. Maximum Decencable Caaact y (het MWe): 330
8. .' Changes Occur in Capac1:y Ratings (;tems humoer'3 Througn 7) Since Last Report. Give Reasons:

None i

9. Power Level To Which Restrictec. If Any (Net MWe): 0.0

. 10. Reasons For Restrictions. If Any: rnrr St. t'rnin conned nucinnr onntnrinn nn Auener 'O. 19R9.

This Month Year To Date Cumulative

, sours !n Reporting Feriod 744 5,831 106.680

12. Numoer Of Hours Reactor was Critical N/A N/A an.976.7
13. Reactor Aeserve Shutcown tiours N/A N/A N/A
14. cours Generator On-Line M/A N/A '27.777.4
15. Unit Reserve Shutdown Hours N /.L N/A N/A
16. Eress thennal Energy Generatea (MWH) _

N/A N/A 14.450.651.2

17. Gross Electrical Energy Generated (MWH) N/A N/A 4.R16.814.0
18. Set Electrical Energy Generated (MWH) -1,572 -12,719 d,238,960
19. Unit Service Factor N/A N/A N/A
20. Lnit Availability Factor N/A N/A N/A
21. Lntt Cacacity Factor (Using MDC Net) ;g y/A N/A
22. Unit Capacity Factor (Using DER Net) N/A N/A N/A
23. Unit Forceo Outage Rate *: / a y/A M/A
24. Shutdowns Scheduled Over hext 6 Months (Type, Date, and Duration of Each): Fort St. Vrain ceased nnrInnr nnornrinn on Aucust 29. 1089.

25 If Shut Down At End Of Report Per'oc, Estimatec Date Of Startup: N/A Forecast Achieved

26. Units In' rest Status (Prior To Comercial Operation):

INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMNERCIAL OPERAi!ON N/A N/A

. , AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-267 Unit Fort St. Vrain Unit No. 1 Date September 13, 1991 Completed By M. L. Block Telephone (303) 620-1313 Month AUGUST DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0.0 17 0.0 2 0.0 18 0.0 3 0.0 19 0.0 4 0.0 20 0.0 5 0.0 21 0.0 6 0.0 22 0.0 7 0.0 23 0.0 8 0.0 24 0.0 9 0.0 25 0.0 10 0.0 26 0.0 11 0.0 27 0.0 12 0.0 28 0.0 13 0.0 29 0.0 14 0.0 30 0.0 15 0.0 31 0.0 16 0.0 Nuclear Operations at Fort St. Vrain were terminated on August 29, 1989.

P UNIT St!OIDOWNS AND POWER REDUCTIONS DOCKET PsO. $j;L-2h 7 UNIT NAME Eort St. Vrain Unit No. 1 DATE Seplember 13. 1991 COMPLETED BY M. L. Block T E L E PHON E (JQLU2 J - TJ 13 PLPORT MONTH AUGUST. 1921 l

(

I ( l i ~iMDiib5 6fl i I l CAUSE AND CORRECTIVE ACitON I

1 (SHUTTING l l 1 I i I I i I 1 LER f I SY S T EM I COM PON E r.I l TO PREVENT RECURRENCE i l NO. l DATE l TY Pf l DUP Al lCN i HEASON IDCWN (CODE ICODE I i 1 _ I ___ I .. I 1REAC10R l_ I I i

i 1 1 I I I I l N/A I f3/A j Nuc lea r Operations were terminated on [

7%.0 l F l 1 i ff / A j August 29, 1989, see LLR 89-018. I 189-091 910801 l F l l i I I i I t i I (

I i  ! I i i i i  ! I  !

i i I i i i i l 1 i i i i i i i i I i  !

I i i i i l i i

! I I I i I i i i I i I i i l i i i I i i I l i I l i i I I i i i l i I i 1 i i  ! i i i i i I I i  ! I i l i I i 1 I l i I i i l i i 8 l i i l I I I I

I i i i i I I I I I I I i I i 1 1 I I i i i i l l I I I 1 I I l I  ; i 1 i

I I i ) I i i I I i 1 1 i i l 1 i 1 I

I I I i i l I i i I I l i i i i  ! I i l ( l I 1 i I I I I 1 l 1 1

I I I I 1 1 1

I I i 1 I I I 1 i i i i I I

I i i t i I I i 1 1 I I I I I i I I I  !  ! I I I I I I I I I I I I I I i 1 1 1 1 i l i 1 i 1 1 i

i I

I i i l i I I I i l I I i i i l i  ! i i i I i i l i i I I i i i i I I I

i  ! i l I I I I I I

( l I I l I i i I i I I I I I I i i i ' I I

! I I i I I i 1 l I I i i i i I I i

Docket No. 50-267 Unit Fort St. Vrain Unit No. 1 Date September-13.-1991 Completed By M. L. Block Telephone (303) 620-1313 ,

REFUELING INFORMATION I -

l t l 1. Name of Facility l Fort St. Vrain Unit No. 1 l 1 l 1 l 2. S:heduled date for next l None, no further refueling at l l refueling shutdown. I FSV is expected. l

_1 l 1 l- 3. Scheduled date for restart l N/A- l l following refueling. l l l -

1 l l 4. Will refueling or resumption ofl N/A l l operation thereafter require a l l l technical--specification change ! l

_l or other license amendment?  ! l l l l I l If answer-is yes, what, in l ---------------- l l general, will these be? l l l l l l If. answer is no, has the reload l l l fuel design and core configura-l l l tion been reviewed by your l l l -Plant SafetyLReview Committee i N/A l ,

I to determine whether any unre -l l 4

l -viewed safety questions are l l

'l . associated with the core reload l l l (Reference.10 CFR- Section l l l 50.59)? I l l' l l l 1 l If no such review has taken l N/A l ;

l place, when is it scheduled? I l l 1 -

1 I l 5. Scheduled date(s) for submit-- l l .

I ting proposed licensing action 1 ---------------- l !

l and supporting information. l l l l l l 6. -Important licensing considera- l l l tions associated with refuel- l l l ing, e.g. , new or dif ferent l l l fuel design or supplier, unre- l ---------------- I j l viewed design or performance l l I analysis methods, significant l l l changes in fuel design, new l l l operating procedures. l l 1 - -

l 1 l 7. The number of fuel assemblies l l l (a) in the core and (b) in the l a) 1024 HTGR fuel elements l l spent fuel storage pool. I b) 458 HTGR fuel elements i e

n

+--

, REFUELING'INFORMATION (CONTINUED) 4 l- -

I - I.

l8 The present licensed spent fuell Current capacity is limited in l_

l pool storage capacity and the l- size to about one-third of core, l l l size of any increase in l 504 HTGR elements. Construction l -l l licensed storage capacity that llof an Independent Spent Fuel l l has been requested or is l Storage Installation (ISFSI) l l planned, in number of fuel I with a capacity of 1620 FSV HTGR' l l assemblies. I elements is proceeding

  • l 1 l -

l l 9. The projected date of the last l No further refueling is l l refueling that can be dis- l anticipated at rt St. Vrain. ** l l- charged to-the spent fuel pool l l l assuming the-present licensed l l l I

-l caphaity. l l l

~

l

-The-Independent Spent Fuel Storage Installation (ISFSI) will be capable of storing the entire FSV core (1482 HTGR fuel elements) with storage space for an additional 138 HTGR fuel elements.

    • Underl Agreements AT(04-3)-633 and DE-SC07-791001370 between Public

-Service Company of Colorado, General Atomic Company, and 00E, spent fuel discharged during the defueling process will be stored by DOE at 1

-the Idaho Chemical Processing Plant. _ The storage capacity is presently limited to eight fuel segments. It is estimated that the eighth fuel segment will be discharged in 1992. Discussions concerning the disposition of ninth fuel segment are in progress with 00E. -Nuclear Operations at Fort St. Vrain were terminated August 29, 1989.