IR 05000424/2017013

From kanterella
Revision as of 02:56, 10 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Reissue - Assessment Follow-up Letter for Vogtle Electric Generating Plant - NRC Inspection Report 05000424/2017013 and 05000425/2017013
ML17339A701
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/05/2017
From: Munday J T
Division Reactor Projects II
To: Myers D
Southern Nuclear Operating Co
References
IR 2017013
Download: ML17339A701 (5)


Text

December 5, 2017

Mr. Darin Myers Vice President Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT: REISSUE - ASSESSMENT FOLLOWUP LETTER FOR VOGTLE ELECTRIC GENERATING PLANT - NRC INSPECTION REPORT 05000424/2017013 AND 05000425/2017013

Dear Mr. Myers:

On November 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) issued the assessment followup letter for Vogtle Electric Generating Plant - NRC inspection report (IR) 05000424/2017013 and 05000425/2017013, (ADAMS Accession Number ML17334A290).

In the subject section of the cover letter, we did not document the NRC inspection report number for the assessment followup letter. We request that the entire letter be replaced as the enclosure to this letter.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 "Public inspection, exemptions, requests for withholding" of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, of from the Publicly Available records (PARS) component of NRC's ADAMS; accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Alan Blamey at 404-997-4415 with any questions you have regarding this letter.

Sincerely,/RA/

Joel T. Munday, Director Division of Reactor Projects Docket Nos.: 50-424 and 50-425 License Nos.: NPF-68 and NPF-81 Distribution via ListServ

ML 17339A701 OFFICE RII/DRP RII/DRP RII/DRP NAME JHickman ABlamey JMunday DATE 12/1/2017 12/1/2017 12/4/2017 Enclosure November 30, 2017 Mr. Darin Myers Vice President Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT: REISSUE - ASSESSMENT FOLLOWUP LETTER FOR VOGTLE ELECTRIC GENERATING PLANT - NRC INSPECTION REPORT 05000424/2017013 AND 05000425/2017013

Dear Mr. Myers:

As a result of our review of plant performance, which was completed on November 20, 2017, the U.S. Nuclear Regulatory Commission (NRC) updated its assessment of Vogtle Electric Generating Plant. The NRC's evaluation consisted of a review of performance indicators (PIs) and inspection results. This letter informs you of the NRC's assessment of your facility and supplements, but does not supersede the mid-cycle letter issued on August 31, 2017. On April 24, 2017, the NRC forwarded a letter that stated the final significance determination of a White inspection finding in the Emergency Preparedness Cornerstone (NRC Inspection Report 05000424/2017-504 and 05000425/2017-504). Since this was identified on October 7, 2016, this White finding was considered an input to the Reactor Oversight Process (ROP) Action Matrix beginning in the fourth quarter of 2016. On August 31, 2017, the NRC completed a review of your corrective actions for the White inspection finding using Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area." The inspectors determined that your staff's evaluation identified the root and apparent cause of the White finding to a level of detail commensurate with the significance of the problems, and reached reasonable conclusions as to the root and contributing causes of the event. The NRC also concluded that you identified reasonable and appropriate corrective actions for each root and contributing cause, and that the corrective actions appeared to be prioritized commensurate with the safety significance of the issues. The NRC's inspection is documented in inspection report (IR) 05000424/2017011 and 05000425/2017011, which is publically available in the Agencywide Document Access and Management System (ADAMS) using accession number ML17286A120. After reviewing Vogtle Electric Generating Plant's performance in addressing the White finding subject of this Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," the NRC concluded your actions met the objectives of this inspection procedure. Therefore, in accordance with the guidance in Inspection Manual Chapter (IMC) 0305, "Operating Reactor Assessment Program," the Enclosure White finding will only be considered in assessing plant performance for a total of four quarters. As a result, the NRC determined the performance at Vogtle Electric Generating Plant to be in the Licensee Response Column (Column 1) of the ROP Action Matrix as of October 1, 2017.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 "Public inspection, exemptions, requests for withholding" of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, of from the Publicly Available records (PARS) component of NRC's ADAMS; accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Alan Blamey at 404-997-4415 with any questions you have regarding this letter.

Sincerely,/RA/

Joel T. Munday, Director Division of Reactor Projects Docket Nos.: 50-424 and 50-425 License Nos.: NPF-68 and NPF-81 Distribution via ListServ

ML17334A290 OFFICE RII/DRP RII/DRP RII/DRP NAME JHickman ABlamey JMunday DATE 11/29/2017 11/29/2017 11/29/2017