JPM- ANO-2-JPM-NRC-PZR02 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 8 DATE:
SYSTEM/DUTY AREA: Pressurizer Pressure Control System TASK: Equalize RCS and PZR Boron JTA#: 20105030401 KA VALUE RO: 3.7 SRO: 3.5 KA
REFERENCE:
010 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 6 Minutes REFERENCE(S): OP 2103.005 Rev 027-02-0 and AOP 2203.028 EXAMINEE'S NAME: SSN: - -
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN HIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED__________________________________ DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-PZR02 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: 100% Power Operation. A power escalation has been completed.
Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.
TASK STANDARD: Spray Valve (2CV-4651)isolated. THIS IS AN ALTERNATE SUCCESS PATH JPM.
TASK PERFORMANCE AIDS: OP 2103.005 section 7.0 and AOP 2203.028.
SIMULATOR SETUP: Run CASE FILE JPM03. This will open A spray valve 100% and trip the breaker when the valve indicates intermediate position.
The following malfunctions/overrides need to be triggered (case file JPM03 will do all of them):
Set T5 file to sprayvlv this will trigger T5 when 2CV-4651 red light is energized.
T5 2CV-4651_a value = 1.0 T5 2HS-4651-3 false (green light)
T5 2 HS-4651-5 false (red light)
JPM- ANO-2-JPM-NRC-PZR02 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."
CRITICAL ELEMENTS (C): 2, 3, 4, 5 PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 1. Verify spray valve, 2CV-4651, On panel 2C04 verified red lights N/A SAT UNSAT isolation valves 2CV-4655 AND ON, green lights OFF for 2CV-4655 2CV-4656 are OPEN. and 2CV-4656.
(C) 2. Place RCP A spray valve On panel 2C04, rotated 2HS-4651B N/A SAT UNSAT MAN/AUTO select switch in the CCW direction to MANUAL.
(2HS-4651B) to MANUAL.
(C) 3. Energize all available Backup On panel 2C04 placed the following N/A SAT UNSAT Heaters. handswitches to ON:
Place 2HS-4643 to ON Place 2HS-4644 to ON Place 2HS-4645 to ON Place 2HS-4646 to ON AND Observed the red light ON and green light OFF above each of the above backup heater handswitches.
EXAMINERS NOTE:
When 2CV-4651 is taken to open, the valve will open 100% and then trip the breaker.
(C) 4. Open 2CV-4651, RCP A spray On panel 2C04 WHEN RCS pressure N/A SAT UNSAT valve partially. starts increasing, throttled 2CV-4651 to the open position.
EXAMINERS NOTE:
The following step may be completed after entering the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM.
JPM- ANO-2-JPM-NRC-PZR02 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 5. Close PZR Spray Block Valves. On panel 2C04, placed handswitch N/A SAT UNSAT for 2CV-4655 and 2CV-4656 to "CLOSE".
Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-4656.
END
JPM- ANO-2-JPM-NRC-PZR02 PAGE 5 OF 6 JOB PERFORMANCE MEASURE QUESTION:
ANSWER:
JPM- ANO-2-JPM-NRC-PZR02 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.
INITIATING CUE:
The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."