|
---|
Category:License-Operator License Exam
MONTHYEARML14177A6482014-06-19019 June 2014 NRC Regulatory Issue Summary 2013-06 Revision to Preparation and Scheduling of Operator Licensing Examinations ML1022304252010-07-28028 July 2010 NRC Regulatory Issue Summary 2010-08 Preparation and Scheduling of Operator Licensing Examinations ML0822800732008-08-14014 August 2008 Units 1& 2 - NRC Regulatory Issue Summary 2008-16 Preparation and Scheduling of Operator Licensing Examinations ML0608601722005-12-24024 December 2005 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) 2014-06-19
[Table view] Category:Draft
MONTHYEARML14177A6482014-06-19019 June 2014 NRC Regulatory Issue Summary 2013-06 Revision to Preparation and Scheduling of Operator Licensing Examinations ML1022304252010-07-28028 July 2010 NRC Regulatory Issue Summary 2010-08 Preparation and Scheduling of Operator Licensing Examinations ML0822800732008-08-14014 August 2008 Units 1& 2 - NRC Regulatory Issue Summary 2008-16 Preparation and Scheduling of Operator Licensing Examinations ML0608601722005-12-24024 December 2005 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) 2014-06-19
[Table view] Category:License-Operator
MONTHYEARML24281A1102024-10-0707 October 2024 Requalification Program Inspection ML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23298A1652023-10-26026 October 2023 Requalification Program Inspection ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A1362022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Operating Test ML22336A1112022-12-0202 December 2022 U2 - Proposed Operating Test ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22336A0932022-12-0202 December 2022 U2 - Proposed Written Examination ML22336A1262022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Written Exam ML22313A0352022-11-0909 November 2022 U2 - Post Exam Comments and Technical References ML22312A5222022-11-0808 November 2022 U2 - Administered Written Examination with Answer Key ML22312A5292022-11-0808 November 2022 U2 - Administered Operating Test ML22277A2522022-10-0404 October 2022 Requalification Program Inspection ML23003A7672022-09-30030 September 2022 U2 - Handouts to Applicants (Folder 3) ML23003A7792022-09-30030 September 2022 U2 - Administered Written Examination and Operating Test Outlines (Folder 3) ML23003A7862022-09-30030 September 2022 U2 - Proposed Written Examination and Operating Test Outlines (Folder 2) ML23003A7692022-09-21021 September 2022 U2 - Miscellaneous Exam Material (Folder 3) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21172A2372021-06-21021 June 2021 Requalification Program Inspection ML21105A6502021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A1592020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML19120A3112019-04-29029 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19064B3922019-03-0505 March 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE 2024-10-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A1362022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Operating Test ML22336A1112022-12-0202 December 2022 U2 - Proposed Operating Test ML22336A0932022-12-0202 December 2022 U2 - Proposed Written Examination ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22336A1262022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Written Exam ML22313A0352022-11-0909 November 2022 U2 - Post Exam Comments and Technical References ML22312A5292022-11-0808 November 2022 U2 - Administered Operating Test ML22312A5222022-11-0808 November 2022 U2 - Administered Written Examination with Answer Key ML23003A7862022-09-30030 September 2022 U2 - Proposed Written Examination and Operating Test Outlines (Folder 2) ML23003A7672022-09-30030 September 2022 U2 - Handouts to Applicants (Folder 3) ML23003A7792022-09-30030 September 2022 U2 - Administered Written Examination and Operating Test Outlines (Folder 3) ML23003A7692022-09-21021 September 2022 U2 - Miscellaneous Exam Material (Folder 3) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 ML18029A6512018-01-29029 January 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18074A3562017-12-0101 December 2017 Final Qa/Related Forms (Folder 1) ML18074A3682017-12-0101 December 2017 Handouts to Applicants, Summary of References (Folder 3) ML18074A3582017-12-0101 December 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17334A0662017-11-29029 November 2017 Operator Licensing Examination Approval ML18074A3662017-11-27027 November 2017 Final Outlines (Folder 3) ML18029A6432017-11-27027 November 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML18029A6622017-11-27027 November 2017 Final Operating Exam (Section a, B and C) (Folder 3) 2023-02-09
[Table view] |
Text
ES-401 Millstone Point Unit 2 Retake Written Examination Feb 06 Form ES-401-9 Written Examination Review Worksheet NOTE 1: All NRC examiner comments on the draft questions have been resolvedAncorporated.
Note 2: The following questions and/or correct answers were changed after NRC review of draft questions based on feedback from licensee validators: 8, 10,20,29,35,36, 48,49,50,51,58, 61, 63. These questions were graded E pending receipt of applicable references. These questions received a second technical review by the NRC examiner(s)
)# 1 26KI L:i v. - ~ ~-
Psychometric Flaws 4. Job Content Flaws I -5. Other 6.
I 7.
y+
(F/H) (1-5) Stem #I Back- Q= SRO U/US Explanation Focus inits ward KIA Only v Y N E Wnot credible with given stem conditions. Stem dioes not specify any CEA position issues Charlge first part of stern to The plant was being shutdown per AOP-2575 Rapid Downpower when the CRS directed a Manual Trip. (GAJ)
-
. Ereplaced, other chanqes made as recommended Y* N S
- WA match considered acceptable since the question is related to flow out of PORV H Y N S 4 H 3 5 H 3 6 H 2 7 F 2 Y I N I SI 8 H 2 Need to validate correct answer against reference@)
Validated with new reverences
- 3. Psychometric Flaws 4. Job Content Flaws 5. Other 7.
Explanation Y N Y N E Need to validate correct answer against reference(s)
Validated with new reverences Y N S
~~ -
Y N minor format DV-10 (GAJ)
Fixed on final version
-
N N U WAmismatch. Question is about environmentalimpact, not battery
>,j>. capacity(GAJ)
, !: Note: Very similar WA to question 50 WA match resolved
-.* r:
Y N E t :: Ensure reference supports correct answer (GAJ)
Validated with new reverences Y N S Y N S Y* N S *Note: Lack of radiation alarm is a needed cue for question (GAJ)
Y N E add femporaryin front of procedure change in B C and D to completely match WA (GAJ)
Changes made Need to validate correct answer against reference(s)
Validated with new reverences Y N S I Y N Need to validate correct answer against reference($)
Validated with new reverences Y N
C
._
c 0
m r-: -
C m
Cl 3
>- >
N N N L
n
-
N D N
I T
0
._
c m
r-: 8
-
m
w i
w w w z z Z
- -
t i J
+
+$
0 (D (D
- 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.
Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO U/US yz Explanation Focus Dist. Link units ward WA Only Y I N I EI Do not use should (RJC)
Changed should to Will Y N S Y N E Should be lower order LOK (RJC)
Changed to F; still >50% H
- F Y N S H
~ -~ ~-
Instructions 3efer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]
- 1. Enter the level of knowledge (LOK) of each question as either (F)undamentalor (H)igher cognitive level.
- 2. -
Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy difficult) rating scale (questions in the 2 - 4 range are acceptable).
- 3. Check the appropriate box if a psychometricflaw is identified:
The stem lacks sufficientfocus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
The answer choices are a collection of unrelated true/false statements.
One or more tkEnteftedistractorsis not credible.
One or more distractors Is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
- 4. Check the appropriate box if a job content error is identified:
The question is not linked to the job requirements (Le., the question has a valid WA but, as written, is not operational in content).
The question requires the recall of knowledge that IS too specific for the closed reference test mode (Le., it is not required to be known from memory).
The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
The question requires reverse logic or applicationcompared to the job requirements.
- 5. Check questions that are sampled for conformancewith the approved WA and those that are desianated SRO-only (WA and license level mismatches are unacceptable).
- 6. Based on the reviewers judgment, is the question as written (U)nacceptable(requiring repair or replacement),
.- in need of (E)ditorial enhancement, or (S)atisfactory?
--_-.
- 7. At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).
NUREG-1021, Revision 9