MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] |
Text
October 8, 2008 Mr. John T. Carlin Vice President, R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, New York 14519
SUBJECT:
R.E. GINNA NUCLEAR POWER PLANT - NOTIFICATION OF INSPECTION OF THE IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES USING TEMPORARY INSTRUCTION 2515/171
Dear Mr. Carlin:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) staff will conduct an inspection at the Ginna Nuclear Power Plant the week of November 17, 2008. The inspection team will be led by Mr. William Cook from the NRC Region I office. The team will be composed of the resident inspector, a Nuclear Reactor Regulation (NRR) inspector, and the team leader. The inspection will be conducted in accordance with NRC Temporary Instruction 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 and 3 Mitigation Strategies.
In order for the NRC to adequately prepare for this inspection, please furnish the documents listed in Enclosure 1 to the NRC team lead, resident inspector, and NRR inspector (one copy each) at least two weeks prior to the planned on site inspection. Please have available on site at the beginning of the inspection the documents listed in Enclosure 2. Mr. Mike Ruby, of your staff, has been advised of this request and other inspection team support needs, including the names and addresses of the inspectors assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009.
Mr. John T. Carlin 2 Your cooperation and support during this inspection will be appreciated. If you have any questions regarding this inspection, please contact Mr. Cook at (610)337-5074, or me at (610)337-5146.
Sincerely,
/RA/
John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-244 License No. DPR-18
Enclosures:
- 1. Documentation Requested Prior to the Inspection
- 2. Arrangements/Documents Requested to be Available Onsite During the Inspection Week
Mr. John T. Carlin 2 Your cooperation and support during this inspection will be appreciated. If you have any questions regarding this inspection, please contact Mr. Cook at (610)337-5074, or me at (610)337-5146.
Sincerely,
/RA/
John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-244 License No. DPR-18
Enclosures:
- 1. Documentation Requested Prior to the Inspection
- 2. Arrangements/Documents Requested to be Available Onsite During the Inspection Week SUNSI Review Complete: WC (Reviewers Initials)
DOCUMENT NAME: G:\DRS\Engineering Branch 3\Cook B.5.b\Ginna Request Letter for B5b info.doc ADAMS ACC#ML082820438 After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRS RI/DRP NAME WCook/DS/WC JRogge/JR GDentel/GD DATE 10/8/2008 10/8/2008 10/8/2008 OFFICIAL RECORD COPY
Mr. John T. Carlin 3 cc w/encl:
M. J. Wallace, Vice - President, Constellation Energy B. Barron, President, CEO & Chief Nuclear Officer, Constellation Energy Nuclear Group, LLC P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. Fleming, Esquire, Senior Counsel, Nuclear Generation, Constellation Nuclear Energy Nuclear Group, LLC D. Wilson, Director, Licensing, Constellation Energy Nuclear Group, LLC P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority G. Bastedo, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network
Mr. John T. Carlin 4 Distribution w/encl: (via E-mail)
S. Collins, RA M. Dapas, DRA M. Gamberoni, DRS D. Roberts, DRS J. Rogge, DRS W. Cook, DRS S. Williams, RI OEDO R. Nelson, NRR D. Pickett, PM, NRR B. Vaidya, PM, NRR G. Dentel, DRP K. Kolaczyk, DRP, Senior Resident Inspector M. Rose, DRP, Resident OA Region I Docket Room (with concurrences)
DOCUMENTATION REQUESTED PRIOR TO THE INSPECTION Please provide the items below two weeks prior to the onsite inspection week. For any items below not supplied prior to the onsite inspection week, please have the item available at the start of the onsite inspection. Please provide as much as possible in electronic format. You are reminded to properly identify and handle all Official Use Only-Security-Related Information and/or Proprietary Information in accordance with current guidance.
- 1. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. These could be Extensive Damage Mitigation Guidelines (EDMGs), SAMGs, EOPs, AOPs, etc.
- 2. A matrix that shows the correlation between the mitigation strategies identified in NEI 06-12 and the site-specific procedures or guidelines that are used to implement the strategy.
- 3. Engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies.
- 4. Simplified flow diagrams for systems relied upon in the mitigation strategies. These diagrams could be the type used for training.
- 5. Simplified drawings/descriptions of modifications that were made to plant systems to implement the mitigation strategies.
Enclosure 1
ARRANGEMENTS/DOCUMENTS REQUESTED TO BE AVAILABLE ONSITE DURING THE INSPECTION WEEK
- 1. Provide a conference room to accommodate up to four (4) NRC staff. Preferably this would be outside the protected area.
- 2. Site B.5.b contact person(s) should be available for the week
- 3. B.5.b engineering persons(s) should be on call for questions about any engineering calculations.
- 4. Appropriate Operations staff should be available, as needed, for plant walkdowns throughout the week.
- 5. Modification packages for any plant modifications performed as a result of B.5.b.
- 6. Detailed drawings (e.g., P&IDs) of systems used to implement mitigating strategies.
- 7. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. These could be Extensive Damage Mitigation Guidelines (EDMGs), SAMGs, EOPs, AOPs, etc. This is the same as Item 1 to Enclosure 1, except that hard copies of these procedures/guidelines should be made available for each member of the inspection team.
- 8. Copies of procedures used to inventory equipment used in the mitigation strategies (e.g.,
hoses, fittings, pumps, etc.).
- 9. Training records/ training matrix/ lesson plans related to B.5.b.
- 10. Copies of Memoranda of Understanding (MOUs) with local fire departments or other emergency services that are required to implement any mitigating strategies.
- 11. Copies of any evaluations performed to document that enough equipment is available to implement the mitigating strategies (e.g., enough fire hose or electrical cable is available based on a plant walkdown or review of drawings).
- 12. You are reminded to properly identify and handle all Official Use Only - Security-Related Information and/or Proprietary Information in accordance with current guidance.